• Title/Summary/Keyword: runoff reduction

Search Result 339, Processing Time 0.024 seconds

Set up Reduction Goals of Combined Sewer Overflow Pollutant Load Using Long-Term Rainfall-Runoff Model Simulation (장기간 강우-유출 모의를 통한 합류식하수관로시스템의 월류부하량 저감목표 설정 연구)

  • Lee, Gunyoung;Na, Yongun;Ryu, Jaena;Oh, Jeill
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.11
    • /
    • pp.785-794
    • /
    • 2013
  • Combined sewer overflows during rainfall events contain sewer sediments and surface pollutants. This can cause significant chemical, physical and biological problems to receiving watershed. However, there are no method that can commonly apply to decide criteria for controlling the pollutant load. In this study, it sets up the reduction goals of combined sewer overflow through long-term simulation using the rainfall-runoff model. From a review of domestic and foreign management standard of combined sewer overflow for this, it makes decision that 60% (phase 1), 85% (phase 2) of total pollutant load and frequency per year for reduction goals is more proper. Also, the result of analyzing long-term simulation (minimum 10 years) applied to research basin indicates that reduction goals of BOD pollutant load are 1,123 kg (phase 1) and 2,374 kg (phase 2), and overflow volumes for research objective achievement are $11,685m^3$ (phase 1) and $24,701m^3$ (phase 2).

A study on the determination of location of the detention pond in trunk sewer for reducing runoff amounts (우수유출저감을 위한 간선저류지 위치선정에 관한 연구)

  • Lee, Sung Ho;Yoon, Sei Eui;Lee, Jae Joon
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.4
    • /
    • pp.223-232
    • /
    • 2017
  • The ability to defend against floods in urban areas was weakened, because the increase in the impervious rate of urban areas due to urbanization and industrialization and the increase in the localized torrential rainfall due to abnormal climate. In order to reduce flood damage in urban areas, various runoff reduction facilities such as detention ponds and infiltration facilities were installed. However, in the case of domestic metropolitan cities, it is difficult to secure land for the installation of storm water reduction facilities and secure the budget for improving the aged pipelines. Therefore, it is necessary to design a storage system (called the detention pond in trunk sewer) that linked the existing drainage system to improve the flood control capacity of the urban area and reduce the budget. In this study, to analyze the effect of reducing runoff amounts according to the volume of the detention pond in trunk sewer, three kinds of virtual watershed (longitudinal, middle, concentration shape) were assumed and the detention pond in trunk sewer was installed at an arbitrary location in the watershed. The volume of the detention pond in trunk sewer was set to 6 cases ($1,000m^3$, $3,000m^3$, $5,000m^3$, $10,000m^3$, $20,000m^3$, $30,000m^3$), and the installation location of the detention pond in trunk sewer was varied to 20%, 40%, 60%, and 80% of the detention pond upstream area to the total watershed area (DUAR). Also, using the results of this study, a graph of the relationship and relational equation between the volume of the detention pond in trunk sewer and the installation location is presented.

LIDMOD Development for Evaluating Low Impact Development and Its Applicability to Total Maximum Daily Loads (지속가능한 도시개발을 위한 LID평가모델(LIDMOD)개발과 수질오염총량제에 대한 적용성 평가)

  • Jeon, Ji-Hong;Choi, Dong Hyuk;Kim, Tae Dong
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.1
    • /
    • pp.58-68
    • /
    • 2009
  • Low impact development (LID) technique is relatively new concept to reduce surface runoff and pollutant loading from land cover by attempting to match predevelopment condition with various integrated management practices (IMPs). In this study, computational model for designing and evaluating LID, named LIDMOD, was developed based on SCS-CN method and applied at Andong bus terminal to evaluate LID applicapability and design retention/detention area for volume or peak flow control. LIDMOD simulated with 21 years simulation period that yearly surface runoff by post-development without LID was significantly higher than that with LID showing about 2.8 times and LID could reduce efficiently yearly surface runoff with 75% reduction of increased runoff by conventional post development. LIDMOD designed detention area for volume/peak flow control with 20.2% of total area by hybrid design. LID can also efficiently reduce pollutant load from land cover. Pollutant loads from post-development without LID was much higher than those from pre-development with showing 37 times for BOD, 2 times for TN, and 9 times for TP. Pollutant loads from post-development with LID represented about 57% of those without LID. Increasing groundwater recharge reducing cooling and heating fee, creating green refuge at building area can be considered as additional benefits of LID. At the point of reducing runoff and pollutant load, LID might be important technique for Korean TMDL and LIDMOD can be useful tool to calculate unit load for the case of LID application.

A Study of Optimal-CSOs by Continuous Rainfall/Runoff Simulation Techniques (연속 강우-유출 모의기법을 이용한 최적 CSOs 산정에 관한 연구)

  • Jo, Deok Jun;Kim, Myoung Su;Lee, Jung Ho;Kim, Joong Hoon
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.1068-1074
    • /
    • 2006
  • For receiving water quality protection a control systems of urban drainage for CSOs reduction is needed. Examples in combined sewer systems include downstream storage facilities that detain runoff during periods of high flow and allow the detained water to be conveyed by an interceptor sewer to a centralized treatment plant during periods of low flow. The design of such facilities as storm-water detention storage is highly dependant on the temporal variability of storage capacity available as well as the infiltration capacity of soil and recovery of depression storage. For the continuous long-term analysis of urban drainage system this study used analytical probabilistic model based on derived probability distribution theory. As an alternative to the modeling of urban drainage system for planning or screening level analysis of runoff control alternatives, this model has evolved that offers much ease and flexibility in terms of computation while considering long-term meteorology. This study presented rainfall and runoff characteristics of the subject area using analytical probabilistic model. Runoff characteristics manifested the unique characteristics of the subject area with the infiltration capacity of soil and recovery of depression storage and was examined appropriately by sensitivity analysis. This study presented the average annual CSOs, number of CSOs and event mean CSOs for the decision of storage volume.

Analysis of Rainfall-Runoff Characteristics in Shiwha Industrial Watershed Using SWMM (SWMM 모형을 이용한 시화호 유역의 강우 유출 특성 분석에 관한 연구)

  • Lee, Hye Won;Choi, Jung Hyun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.37 no.1
    • /
    • pp.14-22
    • /
    • 2015
  • In order to analyze the flow and pollutant runoff characteristics of industrial area, SWMM (Storm Water Management Model) was applied. The model was calibrated based on the measured data in the waterway of Sihwa industrial complex during six events, 2008-2009. The build-up process of pollutants is expressed as Power-linear form and washoff as Power-Exponential form. The validated model was used to analyze the change of the runoff characteristics in the industrial area. In the study area, runoff flow is decreased with an increase in impervious area, but there is no significant change in peak time. The results of this study will be used as basic information of impervious area reduction and watershed management in industrial areas.

Impact of Non-point Source Runoff on Water Resource Quality according to Water-Level Changes (수위 변화에 따른 비점오염의 상수원 수질 영향 분석)

  • Choi, Mi-Jin;Lee, Sang-Hyeon
    • Journal of Environmental Science International
    • /
    • v.24 no.8
    • /
    • pp.1045-1053
    • /
    • 2015
  • This study evaluated the effect of water level of water resources on water quality in Ulsan. Two reservoirs, Sayeon Dam and Hoeya Dam, were selected and water quality of chemical oxygen demand (COD), total nitrogen (TN) and total phosphorus (TP) were analyzed from 2012 to 2014. And the characteristics of precipitation were also analyzed for 70 years (1945~2014) because runoff of non-point pollutant was strongly affected by precipitation. As a result, water deterioration of Sayeon Dam and Hoeya Dam were affected in accordance with lowering water level. For example, the concentrations of COD and TN was negatively correlated with the water level when the water level of Sayeon Dam was gradually decreased in 2013. The TN concentration was increased to 1.432 mg/L from 0.875 mg/L while the lowest water level of Sayeon Dam was recorded 45 m in 2014. Additionally the concentration of COD and TN was sensitively increased with 0.213 mg/L/m and 0.058 mg/L/m on account of non-point pollutant runoff. It is indicated that hereafter a control of non-point pollutant runoff is the critical factors to maintain water resources because the contribution of non-point pollutant is expected to increase due to the frequent heavy rain events. Therefore, it is necessary to map out a specific plan for non-point pollutant control based on analyses of runoff characteristics, water pollution sources and reduction plans in water pollutants and to establish a water modelling and database system as a preventive action plan.

A Simplified Design Method of Culvert Outlet for Detention Pond (저류지 방류암거의 간편설계기법)

  • Jang, Joo-Young;Lee, Jae-Joon
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.4
    • /
    • pp.263-273
    • /
    • 2011
  • Recently increased rainfall by abnormal climate, risen peak runoff by urbanization, and shorten time of concentration are causing frequent overflow at downstream basin. This problem will be solved through the runoff reduction facilities like detention pond. However so far, most studies about detention pond in Korea are focused on its capacity. A study with respect to outlet facilities of detention pond was insignificant. Design of culvert usually used for outlet facilities of detention pond is generally carried out by using "Road Drainage Design" of Korea Expressway Corporation (1991). So detention pond is unreasonable to apply it. In this study, the culvert flow in submerged condition of upstream at culvert was analyzed., and simplified design procedure for culvert outlet facilities were presented for detention pond.

An Experimental Study on the Analysis of Infiltration Capacity of the Permeable Block (투수성 보도블록의 침투능 분석에 관한 실험적 연구)

  • Lee, Hoon;Jung, Do-Joon;Kim, Young-Bok;Kim, Yun-Tae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.4
    • /
    • pp.99-106
    • /
    • 2009
  • This research was to estimate quantitative infiltration volume of permeable block which is one of runoff reduction infiltration facilities. In this research, the permeable block experiments estimating infiltration volume for 50, 100, 150, 200 mm/hr rainfall intensity were carried out and hydraulic experiments results were compared with numerical simulation output to produce feasibility of numerical simulation. Final infiltration capacity analysis of permeable block hydraulic experiments reveals that every estimated infiltration volume before runoff beginning was above approximately 300.0 l despite rapid reduction of infiltration ratio and runoff initiation time were occurred in every rainfall intensity. Statistical calculation for coefficient of determination based on cumulative infiltration volume of hydraulic experiment and numerical simulation resulted in a high correlationship as $0.958{\sim}0.996$.

Estimation of Storage Capacity for CSOs Storage System in Urban Area (도시유역 CSOs 처리를 위한 저류형시스템 설계용량 산정)

  • Jo, Deok Jun;Lee, Jung Ho;Kim, Myoung Su;Kim, Joong Hoon;Park, Moo Jong
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.4
    • /
    • pp.490-497
    • /
    • 2007
  • A Combined sewer overflows (CSOs) are themselves a significant source of water pollution. Therefore, the control of urban drainage for CSOs reduction and receiving water quality protection is needed. Examples in combined sewer systems include downstream storage facilities that detain runoff during periods of high flow and allow the detained water to be conveyed by an interceptor sewer to a centralized treatment plant during periods of low flow. The design of such facilities as stormwater detention storage is highly dependant on the temporal variability of storage capacity available (which is influenced by the duration of interevent dry periods) as well as the infiltration capacity of soil and recovery of depression storage. As a result, a continuous approach is required to adequately size such facilities. This study for the continuous long-term analysis of urban drainage system used analytical probabilistic model based on derived probability distribution theory. As an alternative to the modeling of urban drainage system for planning or screening level analysis of runoff control alternatives, this model have evolved that offer much ease and flexibility in terms of computation while considering long-term meteorology. This study presented rainfall and runoff characteristics of the subject area using analytical probabilistic model. This study presented the average annual COSs and number of COSs when the interceptor capacity is in the range $3{\times}DWF$ (dry weather flow). Also, calculated the average annual mass of pollutant lost in CSOs using Event Mean Concentration. Finally, this study presented a decision of storage volume for CSOs reduction and water quality protection.

Determination of Model Parameters of Surface Cover Materials in Evaluation of Sediment Reduction and Its Effects at Watershed Scale using SWAT (토양유실 저감을 위한 지표피복 저감효과 변수 결정 및 SWAT 모형 유역단위 효과 분석)

  • Kum, Donghyuk;Jang, Chun Hwa;Shin, Min Hwan;Choi, Joong-Dae;Kim, Bomchul;Jeong, Gyo-Cheol;Won, Chul Hee;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.923-932
    • /
    • 2012
  • The purpose of this study was to determine parameters of surface cover materials and evaluation the effects on runoff and sediment reductions with rice straw mat with PAM at watershed scale using the SWAT model. In this study, 1) regression equation of CN for rice straw mat + PAM using SCS curve number method was developed, 2) the USLE P factor, being able to reflect simulation of rice straw mat + PAM in the agricultural field, was estimated for various slope scenarios with VFSMOD-w. Then regression equation for CN and USLE P factor were used as input data in the SWAT model. Assuming rice straw mat + PAM is applied to radish and potato fields, occupying 24% of agricultural fields at the study watershed. Result of direct runoff without rice straw mat + PAM was $65,964,368\;m^3,$ with rice straw mat + PAM, direct runoff was $65,637,336\;m^3$, $327,031.8\;m^3$ reductions compared without it. Also, result of sediment without rice straw mat + PAM was 163,531 ton, with rice straw mat + PAM, sediment was 84,779 ton, 78,752 ton reduction compared without it. This analysis showed that about 48% sediment reductions would be expected with rice straw mat + PAM. As shown in this study, rice straw mat + PAM would be used as an efficient site-specific BMPs to reduce runoff and sediment discharge from field.