• Title/Summary/Keyword: road work technology

Search Result 152, Processing Time 0.023 seconds

Synthesis of Polyamine Grafted Chitosan Copolymer and Evaluation of Its Corrosion Inhibition Performance

  • Li, Heping;Li, Hui;Liu, Yi;Huang, Xiaohua
    • Journal of the Korean Chemical Society
    • /
    • v.59 no.2
    • /
    • pp.142-147
    • /
    • 2015
  • Two new chitosan derivatives, polyamine grafted chitosan copolymers have been synthesized for corrosion protection of carbon steel in acidic medium. First, methyl acrylate graft chitosan copolymer (CS-MAA) was prepared by the reaction of chitosan (CS) and methyl acrylate (MAA) via the Michael addition reaction. Then, CS-MAA was reacted with ethylene diamine (EN) and triethylene tetramine (TN) respectively to synthesize ethylene diamine grafted chitosan copolymer (CS-MAA-EN) and triethylene tetramine grafted chitosan copolymer (CS-MAA-TN), and the structures were characterized by Fourier-transform infrared spectroscopy (FT-IR). At last, the corrosion inhibition activities on Q235 carbon steel were investigated by using gravimetric measurements, metallographic microscope, potentiodynamic polarization and electrochemical impedance spectroscopy (EIS) measurements. The compounds CS-MAA-EN and CS-MAA-TN show an appreciable corrosion inhibition property against corrosion of Q235 carbon steel in 5% HCl solution at $25^{\circ}C$. It has been observed that CS-MAA-EN shows greater corrosion inhibition efficiency than CS-MAA-TN. The inhibition efficiency of CS-MAA-EN was close to 90% when the mass fraction concentration was 0.2%~0.3%; the inhibition efficiency of CS-MAA-TN was close to 85% when the mass fraction concentration was 0.02%. The present work provided very promising results in the preparation of green corrosion inhibitors.

Ventilation Analysis According to Jet Fan Location in Curved Long Road Tunnel (제트 팬 위치에 따른 곡선형 장대터널의 환기해석)

  • Byun, Ju-Suk;Kang, Shin-Hyung;Kim, Ji-Sung;Lee, Jin-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.9
    • /
    • pp.669-678
    • /
    • 2007
  • In this study, the ventilation characteristics is investigated numerically of the longitudinal ventilation method in the curved long road tunnel. Numerical work has been conducted for the jet fan location by utilizing the commercial finite-volume code, FLUENT. Configuration of the tunnel is three-lane, 1600 m long, $120m^2$ in area, 3000 m curvature radius. The velocity profile, distribution of mono-dioxide carbon and flow rate of air are examined in the tunnel. Through the analysis, it is found that the difference of ventilation flow rate Is a little by the jet fan location, but tunnel outlet setup (CASEIII) of jet fans is the most efficient concerned with CO concentration.

Forecasting tunnel path geology using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ali, Hunar Farid Hama;Ibrahim, Hawkar Hashim;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.4
    • /
    • pp.359-374
    • /
    • 2022
  • Geology conditions are crucial in decision-making during the planning and design phase of a tunnel project. Estimation of the geology conditions of road tunnels is subject to significant uncertainties. In this work, the effectiveness of a novel regression method in estimating geological or geotechnical parameters of road tunnel projects was explored. This method, called Gaussian process regression (GPR), formulates the learning of the regressor within a Bayesian framework. The GPR model was trained with data of old tunnel projects. To verify its feasibility, the GPR technique was applied to a road tunnel to predict the state of three geological/geomechanical parameters of Rock Mass Rating (RMR), Rock Structure Rating (RSR) and Q-value. Finally, in order to validate the GPR approach, the forecasted results were compared to the field-observed results. From this comparison, it was concluded that, the GPR is presented very good predictions. The R-squared values between the predicted results of the GPR vs. field-observed results for the RMR, RSR and Q-value were obtained equal to 0.8581, 0.8148 and 0.8788, respectively.

A Study on the Practical lighting Guide for Night Work (야간작업 안전의 적정조명 기준설정을 위한 실험연구)

  • Ro Min-Lae;Son Ki-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.3 s.67
    • /
    • pp.70-77
    • /
    • 2004
  • A Reasonable lighting should be provided for doing night work. All works far construction site can be exposed to potential hazard at night work The purpose of this study is to provide a standard of the lighting against accidents due to insufficient lighting at site. one pilot tea one at building work site, one at mad work site of it have been conducted for figuring out illumination change depending worker's activity direction, using lux checker to show it as numerical indication. The direction are changed with a range of 30, 60, 90, and 135 degree to be checked at site. Tests results show that $10\%\;and\;15\%$ of lighting could be decreased by changing the working direction of works at site. Therefore, steep slope place, cave work and backside of structural elements such as a column, deep beam should be considered for keeping sufficient and reasonable lighting. It is found that $50\%more$ illumination Lux needs f3r civil work than for building work.

Maintenance Robot of Bridge

  • Kim, Kyoung-Tae;Cho, Cheol-Joo;Lim, Kye-Young
    • Proceedings of the KIPE Conference
    • /
    • 2008.06a
    • /
    • pp.160-163
    • /
    • 2008
  • Currently workmen take charge of the maintenance work of bridges. But the process of sealing cracks in damage bridge is dangerous, costly, and labor-intensive operation Labor turnover and training are increasing problems related to crack sealing crews, and as traffic volumes increase, crack sealing operations become increasingly disruptive to the general public. Automation crack sealing can reduce labor and road user costs, improve work quality and decrease worker exposure to bridge hazards. This research aims to develop an automated damage bridge crack sealing system and developing of algorithms for hybrid controlling.

  • PDF

Estimation of Road Capacity at Two-Lane Freeway Work Zones Considering the Rate of Heavy Vehicles (중차량 비에 따른 편도 2차로 고속도로 공사구간 도로 용량 추정)

  • Ko, Eunjeong;Kim, Hyungjoo;Park, Shin Hyoung;Jang, Kitae
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.2
    • /
    • pp.48-61
    • /
    • 2020
  • The objective of this study is to estimate traffic capacity based on the heavy-vehicle ratio in a two-lane freeway work zone where one lane is blocked by construction. For this, closed circuit television (CCTV) video data of the freeway work zone was collected, and the congestion at an upstream point was observed. The traffic volume at a downstream point was analyzed after a bottleneck was created by the blockage due to the upstream congestion. A distribution model was estimated using observed-time headway, and the road capacity was analyzed using a goodness-of-fit test. Through this process, the general capacity and an equation for capacity based on the heavy-vehicle ratio passing through the work zone were presented. Capacity was estimated to be 1,181~1,422 passenger cars per hour per lane (pcphpl) at Yeongdong, and 1,475~1,589pcphpl at Jungbu Naeryuk. As the ratio of heavy vehicles increased, capacity gradually decreased. These findings can contribute to the proper capacity estimation and efficient traffic operation and management for two-lane freeway work zones that block one lane due to a work zone.

Black Carbon Pollution Level at a Roadside of Seoul in Spring (봄철 서울 도로변의 검댕 오염 특성)

  • Lee, Seung-Bok;Bae, Gwi-Nam;Park, Su-Mi;Jung, Sang-Geun
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.23 no.4
    • /
    • pp.466-477
    • /
    • 2007
  • To understand particle pollution phenomena caused by vehicles, black carbon (BC) concentrations were continuously monitored using an aethalometer at a roadside in Seoul during the period of May 79 to 25, 2005. The BC concentration was highly fluctuated for a short duration, responding to the traffic situation on the road. The lowest BC concentration was observed between 2 and 5 a.m. The local highest BC concentrations were observed during the periods of both morning and evening rush hours. Change in traffic volume accounts for the trend of hourly averaged BC concentrations from the late evening to the morning. Particularly, the slower increase of BC concentration on Sunday seems to respond directly the lower traffic volume in the morning rush hours. From the comparison with a previous work, it is concluded that the BC concentration around midday hours might be dependent on the distance from a road.

Development and Evaluation of Rack Type Piezoelectric Harvester for Smart Street Lamps Control (가로등 제어용 다층패드형 압전 하베스터의 개발 및 평가)

  • Kim, Chang-Il;Jeong, Young-Hun;Park, Woon Ik;Cho, Jeong-Ho;Jang, Yong-Ho;Choi, Beom-Jin;Park, Shin-Seo;Paik, Jong-Hoo
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.29 no.11
    • /
    • pp.696-701
    • /
    • 2016
  • In this study, to increase output of road piezoelectric energy harvester, it was made into rack type in which many piezoelectric materials can be installed and load transfer device of the leverage type to transfer vehicle load was made. By paving it in the road, the output characteristics depending on vehicle load and speed were evaluated. Changing vehicle load, harvester output characteristics depending on speed changes were evaluated at the interval of 10 km/h from 10 km/h to 100 km/h. Also, by making a wireless switch and sending wireless signal with output of rack type harvester, whether to receive it was evaluated by distance. It was checked that all switches work up to front-to-back 100 m from harvester.

Concept Development of Eco-friendly Pavement Cutting Machine through Overseas Technology Analysis (해외기술 분석을 통한 친환경 도로포장 절단기 개념 도출)

  • Kim, Kyoon-Tai;Jun, Young-Hum;Kim, Kyong-Hoon;Ok, Chi-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.242-243
    • /
    • 2019
  • In recent years, road cutting work has been frequently performed for the repair of old road pavement and the development of underground space. However, the existing pavement cutting machine in Korea generates a lot of noise and dust. In this study, it was found out that the pavement cutting machine that cuts off noise and sucks cutting dust is used in overseas. Therefore, in this study, the concept of eco - friendly pavement cutter suitable for domestic situation is derived. The results will be used in prototype modeling and experimentation.

  • PDF

Semi-Active Control of a Suspension System with a MR Damper of a Large-sized Bus (MR 댐퍼를 이용한 대형 버스 현가장치의 반능동 제어)

  • Yoon, Ho-Sang;Moon, Il-Dong;Kim, Jae-Won;Oh, Chae-Youn;Lee, Hyung-Won
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.21 no.4
    • /
    • pp.683-690
    • /
    • 2012
  • In this work, the semi-active control of a large-sized bus suspension system with an MR damper was studied. An MR damper model that can aptly describe the hysteretic characteristics of an MR damper was adopted. Parameter values of the MR damper model were suitably modified by considering the maximum damping force of a passive damper used in the suspension system of a real large-sized bus. In addition, a fuzzy logic controller was developed for semi-active control of a suspension system with an MR damper. The vertical acceleration at the attachment point of the MR damper and the relative velocity between sprung and unsprung masses were used as input variables, while voltage was used as the output variable. Straight-ahead driving simulations were performed on a road with a random road profile and on a flat road with a bump. In straight-ahead driving simulations, the vertical acceleration and pitch angle were measured to compare the riding performance of a suspension system with a passive damper with that of a suspension with an MR damper. In addition, a single lane change simulation was performed. In the simulation, the lateral acceleration and roll angle were measured in order to compare the handling performance of a suspension system using a passive damper with that of a suspension system using an MR damper.