• Title/Summary/Keyword: road repairing

Search Result 34, Processing Time 0.03 seconds

Extraction of Expansion Length for Expansion Jiont Bridge using Imagery (영상을 이용한 교량 신축이음부의 신축량 추출)

  • Seo, Dong-Ju;Kim, Ga-Ya
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.4
    • /
    • pp.139-149
    • /
    • 2008
  • A load effect by vehicles running on a road and an increase of traffic is distinguished as a serious issue in the level of bridges' maintenance and management since it causes a quick damage of bridges. The expansion joint is the most important since it makes vehicles' traveling amicable and stress or additional load harmful to molding patterns minimized. However, it is very difficult to measure its expansion length since vehicles continue to pass on the expansion joint. Therefore, the study could see that it was possible to carry out a qualitative and quantitative maintenance and management if its expansion length is extracted with images. The study could acquire three dimensional coordinates of expansion joints with images. As the results of calculating RMSE of check point residual at 32 points in A area and at 28 points in B area, both A and B areas had very good results of RMSEsms 0.829mm~1.680mm. As the results of analyzing expansion length and immediate value extracted by images, the study analyzed that RMSE of A area was 0.64mm and RMSE of B area was 0.28. The average residual of A area was 0.60% and the average rresidual of B area was 0.27%. Therefore, it is judged that it is more scientific and efficient than the past to measure expansion length with images at the time of repairing and managing bridges in the future.

  • PDF

Economic Analysis with Development of Rapid Setting Alumina-based Binder for Road Repair (알루미나계열 속경성 도로 보수재료 개발에 따른 경제성 분석)

  • Yang, Hee-Jun;Yang, Min-Jae;Hong, Sung-In;Ann, Ki-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.1
    • /
    • pp.3-10
    • /
    • 2017
  • In case of Korea highways, about 60% of highways are paved by concrete and more than 50% of them were repaired due to reduction in required performance such as damage in pave or joint and delamination of cover pavement. However, repairing old material in such structure generally costs a lot of money and induces difficulty in maintenance. Thus, enhanced material for ensuring economic efficiency should be developed. The present study designed concrete mixtures with 3 levels of replacement using OPC (0, 10, 20%) in calcium aluminate cement and to evaluate material performance for load pavement, experimental works for setting time, compressive strength and flexural strength were carried out on those materials. As a result, 20% replacement for OPC was determined as an optimized material in terms of required physical performance and its unit price. Moreover, to determine cost in load pavement economy analysis using a program (CA4PRS) was conducted with widely used paving materials. Result showed that application for 20% replacement for OPC was the most efficient in economical aspect, arising from 4.052 and 1.577 billion won for total construction and user cost, respectively.

Evaluation of Performance and Maintenance Cost for Roadside's Particulate Matter Reduction Devices Using Smart Green Infrastructure Technology (스마트 그린인프라 기술을 활용한 도로변 미세먼지 저감장치의 성능 및 유지·관리 비용 평가)

  • Song, Kyu-Sung;Seok, Young-Sun;Yim, Hyo-Sook;Chon, Jin-Hyung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.25 no.4
    • /
    • pp.15-31
    • /
    • 2022
  • The Green Purification Unit System (GPUS) is a green infrastructure facility applicable to the roadside to reduce particulate matter from road traffic. This study introduces two types of GPUS (type1 and type2) and assesses the performance and maintenance costs of each of them. The GPUS's performance analysis used the data collected in November 2021 after the installation of the GPUS type1 and type2 at the study site in Suwon. The changes in the particulate matter concentration near the GPUS were measured. The maintenance cost of GPUS type1 and type2 was assessed by calculating the initial installation cost and the management and repair cost after installation. The results of the performance analysis showed that the GPUS type1, which was manufactured by combining plants and electric dust collectors, had a superior particulate matter reduction performance. In particular, type1 produced a greater effect of particulate matter reduction in the time with a high concentration (50㎍/m3 or higher) of particulate matter due to the operation of electric dust collectors. GPUS type2, which was designed in the form of a plant wall without applying an electric dust collector, showed lower reduction performance than type1 but showed sufficiently improved performance compared to the existing band green area. Meanwhile, the GPUS type1 had three times higher costs for the initial installation than GPUS type2. In terms of costs for managing and repairing, it was evaluated that type1 would be slightly more costly than type2. Finally, this study discussed the applicability of two types of GPUS based on the result of the analysis of their particulate matter performance and maintenance cost at the same time. Since GPUS type2 has a cheaper cost than type1, it could be more economical. However, in the area suffering a high concentration of particulate matter, GPUS type1 would be more effective than type2. Therefore, the choice of GPUS types should rely on the status of particulate matter concentration in the area where GPUS is being installed.

A Development of Criteria for Evaluating School Zone by Utilizing Analytic Network Process (네트워크분석법(ANP)을 이용한 어린이보호구역 평가항목 개발)

  • Jeong, Kwang Seop;Kim, Tae Ho;Park, Je Jin;Won, Jai Mu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.191-197
    • /
    • 2009
  • This study choose the Criteria by conducting survey questionnaire of expertise, ANP analysis, and reviewing literature to samples of School Zone in a synthetic and reasonable way. It draws the estimating factors including a variety of existing aspects (user, facility, operation and management, and education and institution) from the analyses and applies ANP to reflect the decision making process. The results show as follows: first, first level of weights presents proportion of 'facility' and 'user' takes 65% of total weights. It implies that the facility protects children from obstacles is the top priority of the settings. second, the second level of weights present similar importance with the first level. Facility management, road to school, surroundings, safety facility, decelerating facility hold approximately 72% of overall levels. This indicates that improving and repairing surroundings, and safety and decelerating facility are the first priority to consider. These estimating indicators will be properly utilized to rationally appoint prevention zone with reflecting various factors and social class.