• Title/Summary/Keyword: road cutter

Search Result 17, Processing Time 0.018 seconds

Development of a Pavement Cutter for Eco-friendly Road Excavation Construction (친환경 도로굴착 시공을 위한 도로절단기 개발)

  • Kim, Kyoontai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.111-118
    • /
    • 2022
  • Recently, as underground facilities buried under roads in Korea are aging, the amount of underground facility maintenance work is rapidly increasing. For the maintenance and management of such underground facilities, the cutting work of the road pavement should be preceded. However, the conventional road pavement cutters used in Korea are not eco-friendly, and the reality is that they generate a lot of noise and cutting sludge (scattering dust). Therefore, in this study, the concept of the cutting sludge recovery device was derived, and an eco-friendly pavement cutter including this function was designed and manufactured. The developed equipment took about 20 to 30 seconds to cut 1m to a depth of 100 to 150mm. Also, the sludge suction performance was good in most sections, and the noise level of the equipment briefly measured at a distance of 2m was 82.7dB on average. However, due to the limitation that the developed equipment was at the level of the first prototype, the driving stability was somewhat low, and equipment abnormalities such as engine shutdown and sludge recovery performance decreased in some cases. The cutting performance and sludge recovery function will be more stable through tuning and improvement of the developed prototype in the future. In addition, we plan to quantitatively compare and analyze productivity by applying the improved prototype to actual field conditions.

An Analysis on the Effect Factors of the Abrasion Resistance of Interlocking Concrete Block for Roadways (블록의 표층재료 특성이 마모저항성에 미치는 영향 분석)

  • Lee, Min-Kyoung;Cho, Yoon-Ho;Lee, Jae-Hoon;Park, Jun-Young
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.67-74
    • /
    • 2012
  • PURPOSES: In this study the influence factors related to abrasion resistance of interlocking concrete block have been evaluated, and comparisons between various domestic and foreign abrasion test methods was also accomplished. METHODS: The modified rotational cutting method suggested in ASTM C 944 was applied. Surface materials with different types of fine aggregate such as crushed sand, sea sand, and mixture of crushed and sea sand were tested to compare the aggregate effect for abrasion resistance. RESULTS: The different surface mixtures with various W/C ratios, mortar and fly ash ratios have been investigated for functional and economical considerations. CONCLUSIONS: This study had obtained reliable results by changing diamond blade of rotating cutter. Therefore, in order to improve the abrasion resistance of interlocking concrete block for road, a new mix design was proposed.

Concept Development of Eco-friendly Pavement Cutting Machine through Overseas Technology Analysis (해외기술 분석을 통한 친환경 도로포장 절단기 개념 도출)

  • Kim, Kyoon-Tai;Jun, Young-Hum;Kim, Kyong-Hoon;Ok, Chi-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.242-243
    • /
    • 2019
  • In recent years, road cutting work has been frequently performed for the repair of old road pavement and the development of underground space. However, the existing pavement cutting machine in Korea generates a lot of noise and dust. In this study, it was found out that the pavement cutting machine that cuts off noise and sucks cutting dust is used in overseas. Therefore, in this study, the concept of eco - friendly pavement cutter suitable for domestic situation is derived. The results will be used in prototype modeling and experimentation.

  • PDF

Improvement Plan of Excavation Performance Based on Shield TBM Performance Prediction Models and Field Data (쉴드 TBM 성능예측모델과 굴진자료 분석을 통한 굴진성능 개선방안)

  • Jung, Hyuksang;Kang, Hyoungnam;Choi, Jungmyung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.2
    • /
    • pp.43-52
    • /
    • 2010
  • Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.

Design and Safety Performance Evaluation of the Riding Three-Wheeled Two-Row Soybean Reaper

  • Jun, Hyeon-Jong;Choi, Il-Su;Kang, Tae-Gyoung;Kim, Young-Keun;Lee, Sang-Hee;Kim, Sung-Woo;Choi, Yong;Choi, Duck-Kyu;Lee, Choung-Keun
    • Journal of Biosystems Engineering
    • /
    • v.41 no.4
    • /
    • pp.288-293
    • /
    • 2016
  • Purpose: The purpose of this study was to investigate the key factors in designing a three-wheeled two-row soybean reaper (riding type) that is suitable for soybean production, and ensure worker safety by proposing optimal work conditions for the prototype of the designed machine in relation to the slope of the road. Methods: A three-wheeled two-row soybean reaper (riding type) was designed and its prototype was fabricated based on the local soybean-production approach. This approach was considered to be closely related to the prototype-designing of the cutter and the wheel driving system of the reaper. Load distribution on the wheels of the prototype, its minimum turning radius, static lateral overturning angle, tilt angle during driving, and The working and rear overturning (back flip) angle were measured. Based on the gathered information, investigations were conducted regarding optimal work conditions for the prototype. The investigations took into account driving stability and worker safety. Results: The minimum ground clearance of the prototype was 0.5 m. The blade height of the prototype was adjusted such that the cutter was operated in line with the height of the ridges. The load distribution on the prototype's wheels was found to be 1 (front wheel: F): 1.35 (rear-left wheel: RL): 1.43 (rear-right wheel: RR). With the ratio of load distribution between the RL and RR wheels being 1: 1.05, the left-to-right lateral loads were found to be well-balanced. The minimum turning radius of the prototype was 2.0 m. Such a small turning radius was considered to be beneficial for cutting work on small-scale fields. The sliding of the prototype started at $25^{\circ}$, and its lateral overturning started at $39.3^{\circ}$. Further, the critical slope angle for the worker to drive the prototype in the direction of the contour line on an incline was found to be $12.8^{\circ}$, and the safe angle of slope for the cutting was measured to be less than $6^{\circ}$. The critical angle of slope that allowed for work was found to be $10^{\circ}$, at which point the prototype would overturn backward when given impact forces of 1,060 N on its front wheel. Conclusions: It was determined that farmers using the prototype would be able to work safely in most soybean production areas, provided that they complied with safe working conditions during driving and cutting.

A Study on the Optimization of Curing Technology for Improving Properties of Concrete Pavement (콘크리트 포장의 내구성 향상을 위한 양생제 시공기술 최적화 연구)

  • Park, KwonJea;Ryu, SungWoo;Kim, HyungBae;Joo, YoungMin;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.11-20
    • /
    • 2013
  • PURPOSES : This study is to suggest time to spray curing compound, the amount of curing compound, and the number of times to spray curing compound based on indoor tests. METHODS : Based on the literature review, two methods are used in this study, One is test for water retention of concrete curing material and the other is test for abrasion resistance of concrete surfaces by the rotating-cutter method. Through those methods, curing compound was evaluated. RESULTS : The result of the laboratory experiment for time to spray curing compound indicates that 30 minutes after placing concrete is optimal. For the amount of curing compound, $0.5{\ell}/m^2$ is the minimum quantity for both concretes. Through test of the number of times to spray curing compound, method to spray the whole amount of curing compound in twice is more efficient than it to spray the whole amount at a time. Also, method of separately 30-50 minutes spray is better than method of separately 10-30 minutes spray. CONCLUSIONS : From the testing results, it can be proposed that optimum time to curing compound is $30{\pm}15$ minutes, $0.5{\ell}/m^2$ is efficient for spraying the whole amount of curing compound at a time, and $0.4{\ell}/m^2$ is the best for spraying the whole amount of curing compound in twice, which sprays it in 20 minutes after 30 minutes from placing concrete.

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.