• 제목/요약/키워드: risk management tool

검색결과 342건 처리시간 0.023초

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • 한국건설관리학회논문집
    • /
    • 제7권4호
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

효율적인 MMORPG 데이터 관리를 위한 스프레드시트 기반 툴 모델 (The Spreadsheet-Based Tool Model for Efficient MMORPG Data Management)

  • 강신진;김창헌
    • 한국멀티미디어학회논문지
    • /
    • 제12권10호
    • /
    • pp.1457-1465
    • /
    • 2009
  • Massively Multiplayer Online Role-Playing Game (MMORPG) 제작에서 최종 데이터 입력 수단으로 쓰이는 스프레드시트 기반 개발 환경은 대용량의 데이터의 수식 처리, 분석에 있어 장점이 있으나 데이터 삽입 삭제, 검색, 연계성 관리에 어려움이 있다. 본 논문에서 대용량 데이터 관리를 위한 스프레드시트 환경 기반 툴 모델을 제안함으로써 실무에서 발생할 수 있는 다양한 데이터 관리 문제들을 입력 단계에서 해결하고자 한다. 본 논문에서 제안된 툴 모델은 MMORPG 데이터 입력을 위해 다수의 데이터 입력자들이 있는 환경에서 데이터 관리 위험을 최소화시키며 동시에 데이터 입력과 관리 작업 효율을 높이는데 효용성을 가지고 있다.

  • PDF

다이아몬드공구 산업에 있어서 제조물책임에 대한 효과적인 대응방안에 관한 연구 (A Study on Effective Response to Product Liability for Diamond Tool Industry)

  • 이화기;조민규
    • 대한안전경영과학회지
    • /
    • 제14권2호
    • /
    • pp.71-82
    • /
    • 2012
  • Many countries are enforcing the Product Liability Act to ask the responsibility for the supply of the safe products. Thus, the safety of the product becomes one of the most important elements in modern corporate management. Diamond tool industries producing risk-high products cannot make an except to this situation. This research presents how Diamond tool manufactures in korea to respond effectively to Product Liability through construction of Product Safety Management System.

Ergonomics Risk-Assessment Methods in Shipbuilding: Application of OWAS Considering Work load and Frequency for Risk Factor Analysis of WMSDs

  • Lee, Jun-Youb;Seo, Hyun-Soo
    • 대한인간공학회지
    • /
    • 제31권1호
    • /
    • pp.185-189
    • /
    • 2012
  • Objective: The aim of this paper is to introduces Hyundai Heavy Industry's ergonomic risk assessment tool, H-OWAS, which is considering work load and frequency compared to the OWAS. Background: As prevalence of work-related musculoskeletal disorders(WMSDs) in ship building industries has been much higher than that in other industries, most of the large scaled corporations have implemented their own prevention program since legislation on the prevention of WMSDs had introduced in 2003. Method: This paper introduces WMSDs prevention program, HEMP(HHI Ergonomics Management Program) which consists of risk assessment, improvement efforts of working environments, medical treatment and training/evaluation and describes how to operate the program. We also describe application of OWAS method considering work load and frequency for risk factor analysis(H-OWAS) and shows methodology for assessing the ergonomic risk factor. And comparison of the assessment results between OWAS and H-OWAS is carried out by statistical analysis. Result: There was statistically significant difference in the assessment results between OWAS and H-OWAS, and regression shows H-OWAS explains the borg's scale of perceived exertion more clearly than OWAS. Conclusion: H-OWAS has been proved more effective tool than OWAS to evaluate ergonomic risk factor under real working condition. Application: H-OWAS can be widely applied to the many other companies when implementing the ergonomics risk assessment.

실시간 프로젝트 위험관리를 위한 베이지안 네트워크 모형의 개발 (Developing a Bayesian Network Model for Real-time Project Risk Management)

  • 김지영;안선응
    • 산업공학
    • /
    • 제24권2호
    • /
    • pp.119-127
    • /
    • 2011
  • Most companies have been increasing temporary work projects to maximize the usage of their resources. They also have been developing the effective techniques for analyzing and managing the state of the projects. In order to monitor the state of a project in real-time and predict the project's future state more accurately, this paper suggests the Bayesian Network (BN) as a tool for discovering the causes of project risk and presenting the failure probability of the project. The proposed BN modeling method with consideration of the Earned Value Management (EVM) method shows how to induce the predictive and conditional probability of the risk occurrence in the future. The advantages of the suggested model are (1) that the cause of a project risk can be easily figured out via the BN, (2) that the future value of the project can be sufficiently increased by updating relevant components of the project, and (3) that more credible prediction can be made in the similar and future situation by using the data obtained in current analysis. A numerical example is also given.

RISK ANALYSIS FOR INDUSTRIAL PROJECT IN CONSTRUCTION PHASE: A MONTE-CARLO SIMULATION APPROACH

  • Soo-Yong Kim;Luu Truong Van;Han-Ki Ha;Nguyen Quoc Tuan
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.130-139
    • /
    • 2007
  • This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.

  • PDF

국외 감염병 위험도 평가체계의 비교분석 (Comparative Analysis of Risk Assessment Tools for Infectious Diseases)

  • 최은미;우다래;최영준;예정용;박상신
    • 보건행정학회지
    • /
    • 제32권4호
    • /
    • pp.380-388
    • /
    • 2022
  • Background: Emerging infectious diseases, such as Middle East respiratory syndrome or coronavirus disease 2019, pose a continuous threat to public health, making a risk assessment necessary for infectious disease control and prevention. Therefore, we aimed to investigate the risk assessment methods for infectious diseases used by major foreign countries and organizations. Methods: We conducted an investigation and comparative analysis of risk assessment and risk determination methods for infectious diseases. The risk assessment tools included the strategic toolkit for assessing risks, influenza risk assessment tool, pandemic severity assessment framework, and rapid risk assessment methodology. Results: The most frequently reported risk elements were disease severity, antiviral treatment, attack rate, population immunity, and basic productive ratio. The risk evaluation method was evaluated quantitatively and qualitatively by the stakeholders at each institution. Additionally, the final risk level was visualized in a matrix, framework, and x and y-axis. Conclusion: Considering the risk assessment tools, the risk element was classified based on the duplicate of each indicator, and risk evaluation and level of risk assessment were analyzed.

Analysis of cause-of-death mortality and actuarial implications

  • Kwon, Hyuk-Sung;Nguyen, Vu Hai
    • Communications for Statistical Applications and Methods
    • /
    • 제26권6호
    • /
    • pp.557-573
    • /
    • 2019
  • Mortality study is an essential component of actuarial risk management for life insurance policies, annuities, and pension plans. Life expectancy has drastically increased over the last several decades; consequently, longevity risk associated with annuity products and pension systems has emerged as a crucial issue. Among the various aspects of mortality study, a consideration of the cause-of-death mortality can provide a more comprehensive understanding of the nature of mortality/longevity risk. In this case study, the cause-of-mortality data in Korea and the US were analyzed along with a multinomial logistic regression model that was constructed to quantify the impact of mortality reduction in a specific cause on actuarial values. The results of analyses imply that mortality improvement due to a specific cause should be carefully monitored and reflected in mortality/longevity risk management. It was also confirmed that multinomial logistic regression model is a useful tool for analyzing cause-of-death mortality for actuarial applications.

건설업 위험성평가 실무적 적용을 위한 안전보건 인식도 조사 연구 -근로자를 중심으로- (A study on the Research & Analysis of the Health and safety Managing's Understanding for practical Application of Construction Industry Risk Assessment - Focus on worker -)

  • 최수환;오태근;이연수;이진섭
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2013년 춘계학술대회
    • /
    • pp.445-456
    • /
    • 2013
  • According to Department of labor guideline "2012-104 (2012.9.26.)" This study is to suggest the basic information and the improvement for the application of risk assessment on a construction site by group interview & survey of construction worker who is the practice of the subject and then numerical analysis about awareness and action plan of Safety and health. The result of group interview and survey of construction worker, most of construction worker feel the danger during the work. Then construction worker analysis results that risk assessment helps to change & raise awareness of safety and reduce an industrial disaster. Easy Safety management activity such as TBM & safety education active will be necessary for safe worksite and then I suggest the TBT(tool box talk) active which combines TBM & safety education.

  • PDF

임상가를 위한 특집 1 - 우식위험도평가에 근거한 한국형 치아우식증 관리 모델 (Korean Caries Management by Risk Assessment (K-CAMBRA))

  • 김백일
    • 대한치과의사협회지
    • /
    • 제52권8호
    • /
    • pp.456-463
    • /
    • 2014
  • Caries Management by Risk Assessment (CAMBRA), published by California Dental Association in 2003, is a customized caries care system that classifies individuals' caries risk into 4 risk groups based on objective evidences and provides chemical treatments targeted for each caries risk level. However, this system was not only developed but also optimized for situation in the United States, resulting into many limitations to be used in Korea, and thus Korean CAMBRA (K-CAMBRA) that considers the clinical situation in Korea needs to be developed. K-CAMBRA includes various techniques that are newly developed in order to overcome the limitations. First, Q-ray, a new optical technology, is utilized in order to avoid the subjectivity of visual inspection during assessment of disease indicators and risk factors. Moreover, Cariview? that reflects the paradigm shift in cariology as a new form of caries assessment kit is used. In addition, considering the situation in Korea, where it is impossible to use high concentration fluoride product, Oral pack with a customized tray is added to increase the contact time of chemical substance. CAMBRA is believed to be the key clinical tool that overcomes the limitations of the paradigm of the conventional restoration-based surgical model of dentistry. Furthermore, it can be expected that Korean dentists can act as oral physicians who are able to control and care individuals' caries risk rather than operative experts who only care about the outcome of caries.