• Title/Summary/Keyword: return cost

Search Result 452, Processing Time 0.026 seconds

Estimation of Reasonable Price of Battery Energy Storage System for Electricity Customers Demand Management (전력소비자 수요관리용 전지전력저장시스템의 적정 가격 산정)

  • Kim, Seul-Ki;Cho, Kyeong-Hee;Kim, Jong-Yul;Kim, Eung-Sang
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.10
    • /
    • pp.1390-1396
    • /
    • 2013
  • The paper estimated the reasonable market price of lead-acid battery energy storage system (BESS) intended for demand management of electricity customers. As time-of-use (TOU) tariffs have extended to a larger number of customers and gaps in the peak and off-peak rates have gradually risen, deployment of BESS has been highly needed. However, immature engineering techniques, lack of field experiences and high initial investment cost have been barriers to opening up ESS markets. This paper assessed electricity cost that BESS operation could save for customers and, based on the possible cost savings, estimated reasonable prices at which BESSs could become a more prospective option for demand management of customers. Battery scheduling was optimized to maximize the electricity cost savings that BESS would possibly achieve under TOU tariffs conditions. Basic economic factors such as payback period and return on investment were calculated to determine reasonable market prices. Actual load data of 12 industrial customers were used for case studies.

Research on Definition and Economics of Organic Farming Methods (유기농업의 정의와 경제성에 관한 연구)

  • 김종무
    • Korean Journal of Organic Agriculture
    • /
    • v.1
    • /
    • pp.19-28
    • /
    • 1992
  • The definitions of organic farming method has rather philosophical meaning than application of agricultural practices. The meaning of organic farming method has certainly basic differences in comparison with the conventional farming methods. The main definitions of organec farming method have certainly to reduce or not to apply any kinds of farm inputs materials by increasing quality of agricultural prod-ucts. However, the quality of produced food by organic farming method should be improved in compari-son with cinvethional farming method. By applying organic method, the qualith of food, envir-onment as well as spiritual attitude of human being should be improved in future. Actually, there are very wide fields of research on organic farming methods such as production tech-niques, soil and water conservation, plant and animal production, marketing and consumers behavior on organic products. In this article the present situation of organic farming methods in the United States of Americal is investigated in cimparison with conventional rice production. The production cost of rice per acre in the United States of America mde 58, 788 Won in 1986, while it was 121, 699 Won in Korea having about 107 percent higher in Korea than tham the U.S.A There is a larger rice farm cost analysis between conventional and organic rice farm in California. The cash cost pre 1 lbs of conventional rice made 4.86 $, while the organic rice was 6.96$ showing about 43.2%higher level of cost in organic products(1 lbs=0.45359kg) At present, there is less econmic advantage of organic rice production in California because of lower yields as well as price levels, Therefore, the total net return over cash cost peracer/yeat was a little lower in organic rice production than conventional rice prouction.

  • PDF

An Approach to Assessment of the Value of Black Start Service (자체기동 보조서비스의 가치평가 산정 방안)

  • Lee, Jeong-Ho;Oh, Tae-Kyoo;Kang, Dong-Joo;Ok, Ki-Youl
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.2
    • /
    • pp.256-263
    • /
    • 2009
  • For the power system to keep in a stable operating state, sufficient ancillary services must be available to respond to credible contingency events and return the power system to a satisfactory operating state in the case of contingencies as well as blackout events within specified predefined limits. The logical and reasonable bases of valuing and pricing the ancillary services are required to reach the common ground among market participants. The total amount of black start service transactions is quite small compared to the total ancillary service transactions as well as energy market transactions. Black start services must be provided as one of the ancillary services in the deregulated electricity market. In order to procure and remunerate black start services, it is necessary to quantify the value of the black start sources within the power system. In this paper, an approach to assess the value of the black start service is presented based on the cost-of-service solution. Financial simulation of the influence on market participants for the proposed approach on the service is carried out. The cost of the black start service is allocated in accordance with the principle of "causer pays", and the cost is shared by the producers and consumers equally that created the requirement for the service. Under the present electricity market, the mechanism to recover the cost is not implemented, a new approach to the ancillary services to provide incentive for the service providers has to be studied in the near future.

Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase (대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석)

  • Ham, Nam-Hyuk;Yuh, Ok-Kyung;Ji, Kyu-Hyun
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

Economic Analysis of Introduction of Third Party Logistics System in a Tertiary Hospital (상급종합병원 3자 물류외주시스템 도입의 경제성 분석)

  • Byeoung Heon Yoo;Jin-Won Noh;Sei-Jong Baek;Eun Woo Nam
    • Korea Journal of Hospital Management
    • /
    • v.28 no.1
    • /
    • pp.1-13
    • /
    • 2023
  • Purpose: This study purposed to analyze the economic feasibility of introducing a third party logistics system as a strategic alternative to hospital management. Methods: Economic analysis was performed by measuring changes in costs and benefits before and after implement the third party logistics system and estimating the size of net benefits for the next five years for the target hospital. A questionnaire survey and in-depth interview with stake-holders were conducted to find out the satisfaction and effectiveness of the system. Findings: According to results, the cost-benefit ratio for the implementation of the system was 1.18. For the next five years, the cost-benefit ratio was 1.48, the net present value was about 1.7 billion won, and the internal rate of return was 64%. The satisfaction of internal stake-holders was relatively high, in terms of improving the concentration of unique tasks and increasing the efficiency of inventory management. Practical Implications: It was found that the increase in benefits had a greater effect on the change in the cost-benefit ratio than the increase in costs resulting from the expansion of logistics, and the increase in the present value of net benefits gradually decreased as the cost increased. In addition, overall job satisfaction and satisfaction with outsourcing companies were relatively low, which means that stabilization of the new system is important. Further study is needed for more accurate economic analysis.

  • PDF

Cost-Benefit Analysis of Back School Program for Occupational Low Back Pain Patients (직업성 요통환자에서 재활 프로그램(Back School Program) 도입의 비용-편익분석)

  • Ju, Yeong-Su;Ha, Mi-Na;Han, Sang-Hwan;Kwon, Ho-Jang;Cho, Soo-Hun;Kim, Chang-Yup;Kim, Sun-Min
    • Journal of Preventive Medicine and Public Health
    • /
    • v.29 no.2 s.53
    • /
    • pp.347-357
    • /
    • 1996
  • Although occupational low back pain accounts for $20\sim40%$ of all occupational illness and injury, there are limited numbers of studies regarding the effectiveness of back school program. The objective of this study was to evaluate the economic benefit of back school program for early return to work of occupational low back pain patients in the current occupational injury compensation and management system. The cost-benefit analysis in this study was conducted to evaluate the relative magnitude of benefit to cost. The total cost was estimated by calculating the value of components in back school program according to governmental budget protocol. The back school program was consisted of three major approaches, pain center, work-hardening program and funcional restoration program and each of components had various facilities and experts. The total amount of cost was estimated as 250,866,220 won per year. The most promising type of back school program were quite intensive (a 3 to 5-week stay in a specialized center), therefore, if we adopted the 5-week stay course, 10 courses could be held in a year. Following to the medical act, 20 patients per doctor could participate in a each course, ie, total 200 patients in a year. As a result, we could estimate the cost of 1,254,331 won a patient. We estimated the benefit by using data of a few local labor offices about average medical treatment beneficiary and off-duty beneficiary of 46 occupational low back pain patients in 1994. Ullman and Larsson (1977) mentioned that the group of chronic low back pain patients who participated in back school program needed less time to recover by 48.4% of beneficiary duration. And in the trying to estimate the benefit, we asked 10 rehabilitation board certificate doctors about reduction proportion of treatment cost by introducing back school program. The answered reduction proportions were in the range of $30\sim45%$, average 39%. As a final result, we could see that the introduction of back school program in treatment of chronic occupational low back pain patients could produce the benefit to cost ratio as 3.90 and 6.28. And we could conclude that the introduction of back school program was beneficial to current occupational injury compensation and management system.

  • PDF

Economic Evaluations of DCL/ICL Processes (직·간접석탄액화공정의 경제성 평가)

  • Park, Joo-Won;Bae, Jong-Soo;Kweon, Yeong-jin;Kim, Hak-Joo;Jung, Heon;Han, Choon
    • Korean Chemical Engineering Research
    • /
    • v.47 no.6
    • /
    • pp.781-787
    • /
    • 2009
  • This report investigates the economic proprieties of commercial 50,000 barrel per day direct/indirect coal liquefaction(DCL/ICL) plants to produce commercial-grade diesel and naphtha liquids. The scope of the study includes capital and operating cost estimates, sensitivity analyses and a comparative financial analyses. Based on plant capacity of 50,000BPD, employing Illinois #6 bituminous coal as feed coal, the total capital cost appeared $3,994,858,000(DCL) and $4,962,263,000(ICL). Also, the internal rate of return of DCL/ICL appeared 13.27% and 12.68% on the base condition respectively. In this case, coal price and sale price of products were the most influence factors. And ICL's payback period(6.8 years) was longer than DCL's(6.6 years). According to sensitivity analyses, the important factors on both DCL/ICL processes were product sale price, feed coal price and the capital cost in order.

Design and Implementation of Cost-effecive Public Bicycle Sharing System based on IoT and Access Code Distribution (사물 인터넷과 액세스 코드 배포 기반의 경제적인 공공 자전거 공유 시스템의 설계 및 구현)

  • Bajracharya, Larsson;Jeong, Jongmun;Hwang, Mintae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.22 no.8
    • /
    • pp.1123-1132
    • /
    • 2018
  • In this paper, we design and implement a public bicycle sharing system based on smart phone application capable of distributing access codes via internet connection. When smartphone user uses the application to request a bicycle unlock code, server receives the request and sends an encrypted code, which is used to unlock the bicycle at the station and the same code is used to return the bicycle. The station's hardware prototypes were built on top of Internet devices such as raspberry pi, arduino, keypad, and motor driver, and smartphone application basically includes shared bike rental and return functionality. It also includes an additional feature of reservation for a certain time period. We tested the implemented system, and found that it is efficient because it shows the average of 3-4 seconds delay. The system can be implemented to manage multiple bikes with a single control box, and as the user can use a smartphone application, this makes the system more cost effective.

Analysis of Socio-economic Effects of Land Consolidation and On-farm Development Project (경지정리사업(耕地整理事業)의 사회경제적효과분석(社會經濟的效果分析))

  • Lim, Jae Hwan;Kim, Jae Hong;Yeo, Soon Duck
    • Korean Journal of Agricultural Science
    • /
    • v.27 no.2
    • /
    • pp.158-175
    • /
    • 2000
  • Up to date, the economic feasibility analysis on land consolidation and on-farm development projects were mainly depended upon the direct benefits from market value of project outputs. Therefore the projects were neglected in allocation of the government's financial funds and loans on account of undervaluation of the project benefits including socio-economic and environmental values of the projects. Accordingly the Extended Benefit Cost Analysis Method should be adapted to cover not only the benefits such as non-market values of environmental functions of the projects and but also the economic market values of the project outputs. The main objectives of this study is (1) to provision of the guideline for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits such as Productivity increase effect, labor saving effect, off-farm income increase effect during off-farm season, saving of O&M cost of farm mechanization, enhance of farmer's public health, increase of environmental public function of paddy fields, effect of food security and establishment of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible the analysis of non-market goods such as the food security value and the environmental public value of paddy fields. To carry out the study, the publication on the guideline for economic analysis of agricultural projects were reviewed and consulted and for the post evaluation of the land consolidation and on-farm development project, field survey in Jeongja area were made for the feasibility study of the project by new method. According to the initial project plan, Jeongja land consolidation and on-farm development project has 96ha of benefit area and the project was started in 1989 and completed in the spring, 1990. The total project costs were amounted to 1,052 million won and the annual project benefits were estimated at 135.4 million in 1989 constant market prices. On the other hand, the newly estimated project benefits as a part of post evaluation of the project were amounted to 602.1 million won including all the benefits from the market and non-market commodities of the project as mentioned above column. The original IRP(Internal rate of return) of the project was estimated at 15.81%. On the other hand, the IRR of the post evaluation of the project was amounted to 16.83%. In case of including the benefit from the environment public function of paddy field, the SRR(Social Rate of Return) was reached to 38.81% and when we added the benefit from food security of the project, the SRR showed very high rate as 46.41%. In conclusion, the project were verified socio-economically feasible and environmentally sustainable considering the above decision making criteria.

  • PDF

A Study on Eco-efficiency in power plants using DEA Analysis (DEA 모형을 이용한 발전회사 환경효율성에 대한 연구)

  • Han, Jung-Hee
    • Journal of Digital Convergence
    • /
    • v.11 no.5
    • /
    • pp.119-133
    • /
    • 2013
  • This study aims to provide power generating plants with eco-efficiency information. To implement the purposes, of study, both DEA(Data, Envelopment Analysis) model and interview were incorporated in terms of methodologies. To analyze the managerial efficiency, total labor cost and number of employees were considered as input factors. CO2, NOx, and water also were considered as input factors to analyze eco-efficiency. Both annual total power product and annual total revenue were used as output factors. CRS(Constant Return to Scale) and VRS(Variable Return to) model were facilitated in this analysis. According to the findings, most of the power plants were evaluated as 'Efficient'' taking into consideration of average value, both 0.928 from CCR model and 0.969 from VRS model. 7 DMUs including DMU3 and DMU12 are efficient out of 35 DMUs relatively, other DMUs are inefficient. For results of inefficient output factors distribution, it was found that inefficiency for NOx was marked relatively higher than CO2. In order to improve the eco-efficiency in the power plants in the long term, the target amount of Co2 as well as NOx reduction needs to be properly proposed in consideration of particularity of power plants. In the long run, renewable energy, alternative fuels should be adapted to reduce the eco-inefficient.