• Title/Summary/Keyword: repairable-item

Search Result 24, Processing Time 0.02 seconds

Estimation of Warranty Cost (품질하자보증비의 추정)

  • 최정호;이상용
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.357-364
    • /
    • 1997
  • After the buyer purchases the product, the seller's role does not end. If the product fails to function properly before the end of the warranty period, the seller is responsible for its repair or replacement under the seller's warranty policy. There are two common types of warranty policies: the free replacement warranty and the rebate warranty. Under the free replacement warranty policy, replacement or repairs during the warranty period are provided by the seller free of charge to the buyer. Under the rebate warranty policy, a failed item is replaced by a new one or is repaired at a cost to the age of the failed item. The rebate warranty is most often used for items such as a battery or an automobile tire which wear out and must be replaced at failure. This paper proposes a easy way of estimating the warranty cost under the free replacement warranty policy assuming an exponential product failure function on repairable products.

  • PDF

Item Replacement Policy with Minimal Repair in Stepdown Warranty Model

  • Jae Joong, Kim;Won Joong, Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.33
    • /
    • pp.87-92
    • /
    • 1995
  • This paper proposes age replacement policy in stepdown warranty policy. The replacement policy is considered in case of minimally repairable items. And renewal theory is used in analyzing warranty costs. The expected cost per unit time is presented in stepdown warranty policy, free replacement, prorata and hybrid policy. In this article it is assumed that item is replaced at the age of T but the any failure is minimally repaired before the age T. At this point the expected cost per unit time is shown in customer's view point. And numerical example is explored in weibull time-to-failure distribution.

  • PDF

A Study on the Repair Parts Inventory Cost Estimation and V-METRIC Application for PBL Contract (PBL 계약을 위한 수리부속 재고비용 예측과 V-METRIC의 활용에 관한 연구)

  • Kim, Yoon Hwa;Lee, Sung Yong
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.1
    • /
    • pp.79-88
    • /
    • 2017
  • For the PBL contract, it is necessary for the contracting parties to share information regarding the reasonable inventory-level and the cost of its repair parts for the estimated demand. There are various models which can be used for this purpose. Among them, V-METRIC model is considered to be the most efficient and is most frequently applied. However, this model is usually used for optimizing the inventory level of the repair parts of the system under operation. The model uses a time series forecast model to determine the demand rate, which is a mandatory input factor for the model, based on past field data. However, since the system at the deployment stage has no operational performance record, it is necessary to find another alternative to be used as the demand rate of the model application. This research applies the V-METRIC model to find the optimal inventory level and cost estimation for repairable items to meet the target operational availability, which is a key performance indicator, at the time of the PBL contract for the deployment system. This study uses the calculated value based on the allocated MTBF to the system as the demand rate, which is used as input data for the model. Also, we would like to examine changes in inventory level and cost according to the changes in target operational availability and MTBF allocation.

An Optimal Algorithm for the IMES (Intelligent Multi-Echelon Systems) with Finite Operating Capacity (유한 가동 능력을 고려한 IMES(지능형 다단물류 시스템)을 위한 최적 알고리듬)

  • Kim, Tai-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.98-105
    • /
    • 2011
  • 수리가능 제품은 가격 비싸고 중요성이 크면서 새 제품을 구매하기 어려운 부품을 의미하며, 항공기 또는 선박의 엔진 등을 들 수 있다. 수리가능 제품에 대하여 고장이 발생할 경우 가용성을 유지하기 위하여 즉지 교체하여야 하고, 교체된 부품은 수리에 들어가야 한다. 이러한 문제에 대한 통제 시스템은 시스템의 효율성을 결정하는 중요한 요소이기 때문에, 다양한 시스템 구성에 대하여 많은 연구가 이루어져 왔다. 본 연구에서는 우선 중앙 수리기지와 여러 지역 수리기지를 대상으로 하고 있으며, 물류량의 변화에 따라 중앙 수리기지와 지역 수리기지 간의 효과적인 운영 방안을 고려하고 있다. 각 지역 수리기지는 수리 운영 능력이 제한되어 있는 것으로 가정하고 있으며, 한정된 수의 여분의 제품을 유지하고 있다. 중앙 수리기지는 여분을 제품을 보유하거나 유지하지 않고 오직 수리 작업만을 수행하고 있다. 유한 가동에 대한 효율적인 알고리즘은 이러한 상황에 대하여 운영 능력의 한계를 고려하면서 효율성을 최대화하기 위하여 개발되었다. 지역 수리기지에서는 제품의 고장이 발생하는 속도와 현재 보유한 제품 수량에 따라 효율성이 바뀌고, 시스템이 보유할 수 있는 재고량과 수리할 수 있는 능력의 한계가 제한되어 있다. 대기행렬이론에 기반하여 고장율과 수리율에 의한 비용 함수를 정의하고, 최적해를 구할 수 있는 IMES(지능형 다단물류 시스템)을 개발하였다. 총 예상 재고량에 의한 재고 비용과 품절 비용을 최소화함으로써 최적의 보유 재고수량을 찾아내고 실제로 사용자가 활용할 수 있는 시간 내에 해를 구할 수 있는 효율성을 갖춘 알고리듬을 개발하였다. 본 연구의 목적은 전체 시스템의 총비용을 최소화하는 것이며, 예제를 통하여 알고리듬을 묘사하고 수치예제를 통한 실험을 실시하여 제안 알고리듬이 정확하고 효율적임을 보였다. 제안된 알고리즘에 의하여 매우 정확하고 효율적인 계산 결과를 얻을 수 있었으며, 이 방법을 통해 신속하고 정확하게 많은 문제를 해결할 수 있을 것으로 생각된다.