• Title/Summary/Keyword: reinforcing bar joint

Search Result 28, Processing Time 0.025 seconds

Connection Apparatus using Coupling Device and Linking Method for Reinforcing Bar (철근연결구를 이용한 철근이음장치(LK-DK) 개발에 관한 연구)

  • Woo, Jong-Yeol;Hong, Seong-Wook;Park, Seung-Hwan;Ann, Tae-Han;Choe, Min-Kwon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.175-176
    • /
    • 2012
  • In this study, coupler on the safety of meeting the requirements and construction and economy to satisfy the number of parts to minimize an LK-DK coupler has been developed, affordability existing reinforcing bar joint, welded joint, mechanical joints, compared with a favorable one to the understanding, and also facilitate the construction and logistics, etc. I've found that there is no additional pay because the amount of product performance through the tensile test after test, if commercialization is expected to be greater ramifications.

  • PDF

A Study on Reinforcing Bar Computation of Corner Joint in Closing Moment (닫힘모멘트를 받는 우각부의 보강철근량 산정에 관한 연구)

  • Lee, Myung-Gon;Jeong, Jae-Pyong;Mo, Gui-Seok;Kim, Woo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.239-244
    • /
    • 2002
  • The reinforcing bar computation have to be reflected stress distribution and geometrical condition of a comer joint when the closing moment acted at comer joint. This study analyzes stress distribution of a corner joint with statically determinate truss model. Compared with FEM analysis and result of truss model suggested design method consider strengthening efficiency of main reinforcement.

  • PDF

Anchorage performance tests of SD700 hooked bar and headed bar with a anchorage length of 20db (20db 정착길이를 가지는 SD700 갈고리철근과 확대머리철근의 정착성능 실험)

  • Kim, Ho Young;Sim, Hye Jung
    • Journal of Urban Science
    • /
    • v.7 no.2
    • /
    • pp.21-27
    • /
    • 2018
  • With the increase of the skyscraper center, the development of large-diameter and high-strength reinforcing bars is being carried out to solve the dense reinforcement. In case of the steel reinforced concrete with a small cross section such as beam-column joints, the development length becomes short when straight bars are used. Therefore, it is possible to solve the problem that the development length becomes short by using the bearing strength of the hooked bar and headed bar. In this study, the exterior beam-column joint test of SD700 hooked bar and headed bar with anchorage length of 20db was conducted to extend the development length limitation of hooked bar and headed bar. As a result of the evaluation of the anchorage strength using the design equation by KCI, the average of the [measured value]/[predicted value] ratio was 1.31 for the hooked reinforcing bars. In the case of headed bars, the average of the [measured value]/[predicted value] ratio was 1.12. In addition, in order to compare the anchorage performance of the hooked bar and the headed bar, the measured values were divided by the square root of the compressive strength of the concrete to compare the anchorage strength. Under the same conditions, the anchorage strength of headed bars was 8.5% higher than the hooked bars.

Performance Evaluation of R/C Beam-Column Joint According to Unbonded Rebar (비부착 철근 여부에 따른 RC 보-기둥 접합부의 성능평가)

  • Kwon, Min Ho;Jung, Woo Young;Jung, Jae Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.6
    • /
    • pp.201-211
    • /
    • 2011
  • Many reinforced concrete structures have been constructed at the offshore in Korea and those are exposed in environments for long period. Due to that, the reinforcement of the structure faces possibility of corrosion by the salt damage. Such corrosions are effects on the bond performance between concrete and reinforcing bar as well as the performance of the structure. In this study, the performance of RC structure has been investigated when the reinforcing bars are totally bonded and unbonded in the structure. Through the experimental tests and finite element analyses of beam-column joint with bond and unbonded reinforcing bar, the energy dissipation capacity, strength, and crack distribution are compared and discussed.

Mechanical Bar Anchorage of the PC Beam in Beam-Column Joint Using Plates and Bolts (지지대 및 제결볼트를 이용한 프리캐스트 콘크리트 골조구조의 보 하단 철근 정착공법 개발)

  • 유영찬;최근도;김긍환;이리형
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.539-544
    • /
    • 2000
  • The purpose of this study is to develop the mechanical anchorage, namely MAB-BOP (Mechanical Anchorage of 90$^{\circ}$ Hooked Bars with BOlt nad Plate) of the beam-column joint in precast concrete framed structures. Six specimens simulating typical interior beam-column joints were tested to investigate the mechanical characteristics of MAB-BOP. Of primary interest was the measurement of the slip of the anchored bar. Th load-slip curve obtained from this test were used to compare the mechanical performances of the different anchoring methods. Based on the test results, it was found that MAB-BOP showed sufficient anchoring strength capacity compared to 90$^{\circ}$ hooked bar method. So, MAB-BOP can be used as the anchoring methods of the reinforcing bars in PC beam-column joint.

  • PDF

Evaluation on Anchorage Performance of 57mm Headed Bars in Exterior Beam-Column Joint under Cyclic Loading (반복하중을 받는 외부 보-기둥 접합부에 정착된 57mm 확대머리철근의 정착성능평가)

  • Jung, Hyung-Suk;Chung, Joo-Hong;Choi, Chang-Sik;Bae, Baek-IL;Choi, Hyun-Ki
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.6
    • /
    • pp.68-75
    • /
    • 2021
  • In this study, the anchoring performance of 57mm headed bars anchored at the external beam-column joint under cyclic loading was evaluated. A total of 6 external beam-column joint test specimens were planned, and anchorage performance was evaluated by setting concrete compressive strength, side covering thickness, lateral reinforcement ratio, and fracture type as major experimental variables. As result of cyclic loading test, it was found that the factors that had the greatest influence on the anchoring capacity of the large-diameter headed bar anchored at the joint were the side cover thickness and the transverse reinforcing bar. It was confirmed that the 57mm large-diameter headed bar anchored at the external beam-column joint showed sufficient anchoring capacity even under cyclic loading.

Effect of Flexural Performance on U-Shaped Precast Concrete Beams with Noncontact Lapped Splice (비접촉 겹침 이음된 프리캐스트 U형 보의 휨성능에 미치는 효과)

  • Ha, Sang-Su;Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.6
    • /
    • pp.119-128
    • /
    • 2008
  • In this study, new moment-resisting precast concrete beam-column joint is proposed for moderate seismic regions. It has the connection reinforcing bars, penetrated the joint and lap-spliced with the bottom bars of precast U-shaped PC beam. To evaluate the performance for noncontact lapped splice, experimental and analytical works were conducted. Major variables for tests are the length of lap, the diameter of connection reinforcing bars, and the distance between lapped bars. Analytic research was performed nonlinear finite element method. Analytic research focused on crack pattern, load-deflection curve, comparison of internal force, evaluation of ductility strains of reinforcement bar. Results of experimental and analytical works show that the these variables has much influence on flexural strength and ductility, and joint behavior.

Experimental Study on the Precast Concrete Joint using Re-bar Debonding and Cutting Technique (철근 비부착 및 절단 기법을 사용한 PC 접합부의 실험적 연구)

  • Yi, Waon-Ho;Moon, Jung-Ho;Lee, Yong-Jae;Lee, Han-Jun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.2 no.4 s.7
    • /
    • pp.131-141
    • /
    • 2002
  • Precast concrete (PC) panels are often used as retaining walls to support soil pressure. In such a case, the panels should be connected at the location where PC panels meet with a buttress. However, it is not easy to provide enough development length for the reinforcing steels due to the limited width of the buttress. If it happens, the width of buttress should be increased as large enough although it is not desirable. The critical section required for providing the development length is always located where the flexural moment is maximum. Thus it is the place the buttress width ends. Also it is the place that the reinforcing steels stressed to maximum. However, it is possible to make differentiate between the maximum moment location and the most stressed location of reinforcing steels. It means that the most stressed location of reinforcing steels, the critical section, can be moved to the other place where the moment is not maximum. New critical location will have less moment than that of buttress width ends. In consequence, the development length would be longer than that of the typical way of construction. Debonding or cutting technique make it possible to reduce the moment strength of a section. Therefore reinforcing steels are debonded or cut to have a desired flexural strength at a desired place. In this study, five test specimens in full scale were erected to examine the effects of critical section movement in PC panel joints. Test parameters were the length variations of debonded and cut reinforcing steels. The test results showed that the debonding or cutting technique could be used to lengthen the development length in the joint of PC panels.

An Experimental Study of Tension Properties on New Developed Up-Set Coupler (Up-Set Coupler 이음철근의 인장특성에 대한 실험적 연구)

  • Sim, Jong-Sung;Park, Cheol-Woo;Kang, Tae-Sung;Kim, Tae-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.5
    • /
    • pp.109-115
    • /
    • 2008
  • As structures are getting super-rise and large-sized, introducing the construction methods such as prefabrication of bar-meshes and complex method are being actively discussed to pursue the high quality of reinforced concrete, the simplification of field works, and the reduction of duration, as well as the study on how to connect reinforcing rods, which occurs while applying the same methods, is in progress Also, the pressure welded joint is a kind of method that heats the ends of reinforced bars locally and joint them, and after the pressure welding, the vulnerable part in the reinforced bar occur. Thus, in the construction field, the throughout quality control is necessary because of the delayed duration and the lowered construct ability. In this study, of the traditional lap splice method and the mechanical splice one, the screw coupler, we tried to look into through experiments the prefabrication method of bar-meshes, a typical joint method usually used for the joint parts for PSC structures applying the reinforced bar with its big diameter, and a newly-developed up-set coupler method. And we also examined the characteristic of tensile.

Stud reinforcement in beam-column joints under seismic loads

  • Abdollahzadeh, Gholamreza;Ghalani, Saeed Eilbeigi
    • Computers and Concrete
    • /
    • v.18 no.3
    • /
    • pp.297-317
    • /
    • 2016
  • Current codes recommend large amounts of shear reinforcement for reinforced concrete beam-column joints that causes significant bar congestion. Increase in congestion of shear reinforcement in joint core (connection zone), leads to increase accomplishment problems. The congestion may also lead to diameter limitations on the beam bars relative to the joint dimensions. Using double headed studs instead of conventional closed hoops in reinforced concrete beam-column joints reduces congestion and ensures easier assembly of the reinforcing cage. The purpose of this research is evaluating the efficiency of the proposed reinforcement. In this way, 10 groups of exterior beam-column joints are modeled. Each group includes 7 specimens by different reinforcing details in their joint core. All specimens are modeled by using of ABAQUS and analyzed subjected to cyclic loading. After verification of analytical modeling with an experimental specimen, 3D nonlinear specimens are modeled and analyzed. Then, the effect of amount and arrangement of headed studs on ductility, performance, ultimate strength and energy absorption has been studied. Based on the results, all joints reinforced with double headed studs represent better performance compared with the joints without shear transverse reinforcement in joints core. The behavior of the former is close to joints reinforced with closed hoops and cross ties according to the seismic design codes. By adjusting the arrangement of double-headed studs, the decrease in ductility, performance, ultimate moment resistant and energy absorption reduce to 2.61%, 0.90%, 0.90% and 1.66% respectively compared with the joints reinforced by closed hoops on the average. Since the use of headed studs reduces accomplishment problems, these amounts are negligible. Therefore, use of double-headed studs has proved to be a viable option for reinforcing exterior beam-column joints.