A Study on the Evaluation of Welding Residual Stress of Pipeline in Power Plants by Indentation Methods (연속압입시험법에 의한 발전용 배관 용접부의 잔류응력 평가)

  • 이상국;길두송
    • Proceedings of the KWS Conference
    • /
    • 2004.05a
    • /
    • pp.212-214
    • /
    • 2004
  • It is widely recognized that the residual stress of weldment affects steel construction and causes fracture initiation of welded structures. It is necessary to know since the power plants adopt a variety of welding processes distribution and magnitude of residual stresses. Therefore the purpose of present study is to investigate the validity of the indentation method to measure residual stresses of steel plates by residual stresses measured form the specimens of hot reheater pipes, cold reheater pipes and feed water lines used in power plants.

  • PDF

Mechanism Diagnosis and Avoidance Design on Transient Acoustic Vibration of Reheater Water Supply Piping in Supercritical Boiler (초임계 보일러 재열기 급수 공급배관의 과도 음향진동 진단 및 회피설계)

  • Kim, Yeon-Whan;Bae, Yong-Chae;Kim, Jae-Won;Lee, Doo-Young;Heo, Hae-Yong
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.5
    • /
    • pp.385-393
    • /
    • 2013
  • In this paper, the mechanism identification and the avoidance measures on the phenomena of transient acoustic vibration amplified at the water-supply piping system to regulate the steam temperature of the boiler reheater in 500MW class supercritical power plant are presented. The pressure pulsation waves induced by the impeller passing of two feed-water pumps with five blades are coincident with the local acoustic modes of boiler reheater water-supply piping system. There are the phenomena amplified at the peaks of 5X, 10X, 15X and 20X in spectrums of piping vibration, sound pressure, and the feed-water's pressure pulsation waves. The shut-off device is installed in the piping system for the interception of pressure pulsation waves transmitted from two feed-water pumps and the modified design change of the piping layout is applied for the acoustic resonance avoidance. The acoustic natural frequencies are separated from the harmonics of pressure pulsation waves induced by the pump impellers passing through the design change of the span length. The acoustic vibration is gone by resonance avoidance measures. As a result, more than 20 dBA reduction is achieved from 100 dBA to 80 dBA.

Intelligent 2-DOF PID Control For Thermal Power Plant Using Immune Based Multiobjective

  • Kim, Dong-Hwa
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1371-1376
    • /
    • 2003
  • In the thermal power plant, the main steam temperature is typically regulated by the fuel flow rate and the spray flow rate, and the reheater steam temperature is regulated by the gas recirculation flow rate. However, Strictly maintaining the steam temperature can be difficult due to heating value variation to the fuel source, time delay changes in the main steam temperature, the change of the dynamic characteristics in the reheater. Up to the present time, PID Controller has been used to operate this system. However, it is very difficult to achieve an optimal PID gain with no experience, since the gain of the PID controller has to be manually tuned by trial and error. This paper focuses on tuning of the 2-DOF PID Controller on the DCS for steam temperature control using immune based multiobjective approach. The stable range of a 2-DOF parameter for only this system could be found for the start-up procedure and this parameter could be used for the tuning problem. Therefore tuning technique of multiobjective based on immune network algorithms in this paper can be used effectively in tuning 2-DOF PID controllers.

  • PDF

A Study on the Evaluation of Welding Residual Stress of Pipe used in Power Plant by Indentation Method (연속압입시험에 의한 발전소용 배관의 용접잔류응력 평가에 관한 연구)

  • Park, S.K.;Choi, W.D.;Gil, D.S.;Ko, J.B.;Lee, K.C.;Lee, Y.H.
    • Journal of Power System Engineering
    • /
    • v.8 no.2
    • /
    • pp.12-17
    • /
    • 2004
  • In this study, to verify the reliability of the indentation for measuring welding residual stresses to get in method we compared the results of the method with those measured by the saw cutting method. Also for the same purpose we used a 4-point bending test and confirmed the reliability of indentation method. The specimens used in this experiment are made with the same conditions for hot reheater pipes and cold reheater pipes used in the electric power plant. Therefore we could know that the results of the methods showed the reliability of the method to obtain welding residual stresses.

  • PDF

Evaluation of Corrosion Product Behavior in NPP Secondary System with Complex Amine (복합아민 적용에 따른 원전 2차 계통 부식생성물 거동평가)

  • JUNG, Hyunjun;RHEE, In Hyoung;Kim, Young In
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.10 no.1
    • /
    • pp.96-99
    • /
    • 2014
  • The aim of the study was to evaluate the water treatment of pressurized water reactor secondary side by the mixed amine of ammonia and ethanolamine, from the standpoint of corrosion control, as compared with all volatile treatment of ammonia. The pressurized water reactor systems have switched a secondary side pH control agent to minimize the corrosion in the moisture separator/reheater and feedwater heater systems and the transport of corrosion products into steam generator. As results of field test, pH was increased in the steam generator and the wet steam area of moisture separator/reheater and the concentration of Fe were decreased by more than 50% as compared with water treatment of ammonia.

Performance Analysis of Once-through HRSG and Steam Turbine System (관류형 열회수 증기발생기와 증기터빈 시스템의 성능해석)

  • Yang, J.S.;Kim, T.S.;Ro, S.T.
    • Proceedings of the KSME Conference
    • /
    • 2001.11b
    • /
    • pp.872-877
    • /
    • 2001
  • This study analyzed the design performance of the bottoming system of combined cycle power plants adopting a single-pressure once-through heat recovery steam generator with reheat. A computer program was constructed and parametric analyses were carried out to present the criteria for determining the reheat pressure and the location of the starring point of the reheater in the HRSG. The performance of the bottoming system was presented for the range from high subcritical to supercritical pressures. It was founded that the power of the bottoming system can be as high as that of the present triple-pressure bottoming system even with a higher exhaust gas temperature. A requirement for this high performance is a proper arrangement of the reheater.

  • PDF

Vibration Reduction Method for Discharge Line of Moisture Separator Reheater (습분분리재열기 배수관 진동저감방안)

  • 이준신;손석만;김태룡
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.688-694
    • /
    • 2001
  • The 84m discharge line of moisture separator reheater(MSR) in Kori-2 had been suffered by excessive vibration from the beginning of power generation. In 1993, a complementary measure was taken to reduce the vibration level by adding several supports in the MSR pipeline. However, the piping vibration was beyond the allowable limit and an appropriate countermeasure was required to prevent the fatigue failure of the pipeline from the abnormal vibration. In this study, the vibrational characteristics of MSR pipeline and the countermeasure for abnormal vibration was investigated. Among the several vibration reduction methods, piping layout change by smoothing the pipeline was applied to the MSR pipeline in Kori-2. Applying the countermeasure, the vibration level was found to dramatically reduce from 17cm/sec to l.0cm/sec at the full-power operation condition.

  • PDF

Temperature Control of Ultrasupercritical Once-through Boiler-turbine System Using Multi-input Multi-output Dynamic Matrix Control

  • Moon, Un-Chul;Kim, Woo-Hun
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.3
    • /
    • pp.423-430
    • /
    • 2011
  • Multi-input multi-output (MIMO) dynamic matrix control (DMC) technique is applied to control steam temperatures in a large-scale ultrasupercritical once-through boiler-turbine system. Specifically, four output variables (i.e., outlet temperatures of platen superheater, finish superheater, primary reheater, and finish reheater) are controlled using four input variables (i.e., two spray valves, bypass valve, and damper). The step-response matrix for the MIMO DMC is constructed using the four input and the four output variables. Online optimization is performed for the MIMO DMC using the model predictive control technique. The MIMO DMC controller is implemented in a full-scope power plant simulator with satisfactory performance.

Operation and Improvement Cases of FGD Non-leakage Type Gas-Gas Heater(GGH) for Coal Fired Power Plants (석탄화력 탈황설비 Non-leakage Type Gas-Gas Heater(GGH) 운영 및 개선사례)

  • Seong, Kijong;Lee, Changsik
    • Journal of the Korean Society of Combustion
    • /
    • v.22 no.4
    • /
    • pp.35-42
    • /
    • 2017
  • This case covers the issues related to the operation problem, cause analysis and improvement cases of the FGD that employed the non-leakage type GGH in coal-fired power plant for the first time in Korea. In the Cooler, there was a main problem that the tube is damaged by the ash cutting due to the high velocity of flue gas in the duct and by the weak wear resistance of material. In the Reheater, there was a main problem that the tube was corroded due to chlorine and sulfur in the circumstance of the low temperature. In order to solve those problems, we have improved the Reheater tube and tube fins by coating enamel to reduce corrosion rate.