• 제목/요약/키워드: redevelopment

검색결과 395건 처리시간 0.024초

강원 동해안 어촌어항의 색채 현황에 관한 조사 연구 (A Study on the Investigation of Color about fishing village and harbor in Gangwon East coast)

  • 조원석;김흥기;김정현
    • 한국농촌건축학회논문집
    • /
    • 제8권3호
    • /
    • pp.75-82
    • /
    • 2006
  • Recently a lot of domestic harbor and fishing village should be established by redevelopment Thus this paper is to propose directions of color design about fishing village and harbor in East coast. Above all important color-scape in harbor, such as regional atmosphere and sea-scape are to analyze color planning. The major analysis is to take basic data about color planning for marine tourism. For the feasibility of these characteristics, hue, value, chroma can be checked and design of color-scape may be possible to work out future harbor surrounding by evaluation scale. This study suggests that harbor of contemporary is to be environmental and regional color control. To this end, it shows that the color of not uniformity but combination/harmony is one of the important of satisfaction of color environments. The result of this study, analysis of color-scape about status will be useful to plan with color data in fishing village and harbor.

  • PDF

IT 사업의 경제성 평가 모형 설계 (Economics Evaluation Model for Information Systems Project)

  • 이상원;김성현;박승범;안현섭
    • 한국컴퓨터정보학회:학술대회논문집
    • /
    • 한국컴퓨터정보학회 2014년도 제50차 하계학술대회논문집 22권2호
    • /
    • pp.97-98
    • /
    • 2014
  • Lots of investment projects of new development and redevelopment for information systems have been not taken care of in the field of administration and evaluation, for these information systems projects have unique characteristics such as technology sensitiveness, network effectiveness, embeddedness, and externality. In fact, quantitative and qualitative evaluation of investments in information systems projects are not sufficient. It is critically important to generally evaluate benefits of development or operation cost, urgency, external effects, and so on. In addition, the efficient monitoring and effective analysis of information systems are surely needed for beneficient results of investment in information systems. We propose an economics evaluation model for information systems projects.

  • PDF

정보시스템 관리를 위한 가치측정 방법론 설계 (Value Measurement Model to Manage Information Systems)

  • 이상원;김성현;박승범;안현섭
    • 한국컴퓨터정보학회:학술대회논문집
    • /
    • 한국컴퓨터정보학회 2014년도 제50차 하계학술대회논문집 22권2호
    • /
    • pp.99-100
    • /
    • 2014
  • Even though many projects of new development and redevelopment for information systems are invested, they are not taken care of from the perspective of administration and evaluation. Also, decision makers fall short of not only support the process to check alternatives and select an alternative for investment and but also provide necessary information so as to maximize the effects of investments. That is to say, the suggestion of general direction toward IT investment is debatable. Against this backdrop, we propose a value measurement model to manage information systems.

  • PDF

재건축 사업의 클레임 요인 분석에 대한 연구 (A Study of Analyzing Claim Factor on the Reconstruction Projects)

  • 신윤경;최현상;이경하;조성;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.231-234
    • /
    • 2009
  • Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, is can be extended to diverse claims when the relation with the related parties is smoothly adjusted. In particular, the association must give up many rights of invisible parts because they are short of professionalism about the business. Accordingly, the study is to analyze claim factor based on case of Supreme Court.

  • PDF

지역적 특성을 고려한 농촌주거단지계획 연구 - 경북 상주시 이안면 녹동마을 사례를 중심으로 (A Study on the Planning for Rural Housing Complex Considering Regional Characteristic - Focused on Nok-dong district, Ian Myoun, Sang-Ju, Gyeong Buk)

  • 이호정;유수훈
    • 한국농촌건축학회논문집
    • /
    • 제10권1호
    • /
    • pp.75-82
    • /
    • 2008
  • This study is about land use and site plan for resident redevelopment for districts with existing residents. The study suggests development direction focusing on preserving the regional characteristics, and presentation of suburban-style housing complex reflecting on the future tenant's individuality and demand. The preexisting development approach for suburban-style housing complex which was planned by the developer, failed to recognize taste of the future tenants. Profitability being the priority, it also resulted in a serious environmental disruption. In this development however, through a systematic direction for site development and site analysis, conducting surveys through future tenants, attempted for a continuous growth of the community. The study is presented covering the following areas; site's pathway system, nature conservation plan, lot plan, land use and arrangement plan, and community facility.

  • PDF

방재와 홍수저감 및 수자원 확보 측면에서 바라본 한반도 대운하 (The Pan-Korea Grand Waterway in view of Disaster prevention, flood decrease and water resource insurance)

  • 신은우
    • 기술사
    • /
    • 제41권2호
    • /
    • pp.45-50
    • /
    • 2008
  • At this point, the Pan-Korea Grand Waterway (PKGW) has negative views and various complicated problems, but the government chose PKGW as important project for having a benefit in physical distribution, tourism, aggregate sale and new employment as well as in view of disaster prevention, flood control, irrigation. The government makes special laws for PKGW in evaluating environment effect and the safety of existing facilities and considers countermeasures for the rehabilitation, movement and redevelopment of facilities by related company and specialist. From analyzing and investigating the collective results in detail and in stages, the PKGW is the best choice by which korea engineers can hand over pleasant and beautiful korea to next generation in world.

  • PDF

1950-1970년대 도시미화를 위한 서울 간선도로변 고층화제도의 사적 고찰 (Historical Review on High-rise Buildings-promoting Policies on the Main Roads of Seoul for Urban Beautification from the 1950s to the 1970s)

  • 박일향;전봉희
    • 대한건축학회논문집:계획계
    • /
    • 제35권10호
    • /
    • pp.41-52
    • /
    • 2019
  • The purpose of this study was to analyze the historical development of high-rise buildings-promoting policies in Seoul in terms of modern urban redevelopment. The results of this study were as follows; The maximum height of the buildings has been limited by National codes since 1934. But at the same time, Seoul Metropolitan government had limited the minimum building floors of roadside buildings through local regulations after the Korean War. The high-rise city had been regarded as a means of beautifying Seoul for a long time. However since the 2000s, the minimum height limit for buildings was removed from local regulations and the concept of high-rise restrictions was no longer significant as before.

An Overview of Time Estimation in the Appraisal of Completeness for Software

  • Kim, Yukyong
    • 한국소프트웨어감정평가학회 논문지
    • /
    • 제16권1호
    • /
    • pp.21-26
    • /
    • 2020
  • The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.

The Methods of Value Management to Support Decision-Making of Urban Regeneration Projects

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk;Son, Bo-Sik
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1503-1508
    • /
    • 2009
  • The paradigm of urban generation does not lie in physical development/maintenance such as urban redevelopment any more. The paradigm is shifting to balanced activation of administration / management functions including central commerce/business functions, broad culture/tourism functions, international functions and adequate level of residence functions. The urban regeneration project aims to restore functions of cities by physical/environmental, living/cultural and industrial/economical regeneration and is managed differently from existing projects in that it includes multiple sub-projects in it. The overall projects management should be by managing the value sought by the urban regeneration project and multiple other sub-projects. The objective of this study is to present various methods of value management in order to avoid conflicts between various objectives within the said project. It aims to provide the value management methods for decision making by understanding correlatedness between values of various projects and prioritizing them.

  • PDF

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF