• Title/Summary/Keyword: reconstruction project

Search Result 183, Processing Time 0.032 seconds

Misdiagnosis of ameloblastoma in a patient with clear cell odontogenic carcinoma: a case report

  • Park, Jong-Cheol;Kim, Seong-Won;Baek, Young-Jae;Lee, Hyeong-Geun;Ryu, Mi-Heon;Hwang, Dae-Seok;Kim, Uk-Kyu
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.45 no.2
    • /
    • pp.116-120
    • /
    • 2019
  • Clear cell odontogenic carcinoma (CCOC), a rare tumor in the head and neck region, displays comparable properties with other tumors clinically and pathologically. In consequence, an incorrect diagnosis may be established. A 51-year-old male patient who was admitted to the Department of Oral and Maxillofacial Surgery at Pusan National University Dental Hospital was initially diagnosed with ameloblastoma via incisional biopsy. However, the excised mass of the patient was observed to manifest histopathological characteristics of ameloblastic carcinoma. The lesion was ultimately diagnosed as clear cell odontogenic carcinoma by the Department of Oral Pathology of Pusan National Dental University. Therefore, segmental mandibulectomy and bilateral neck dissection were performed, followed by reconstruction with fibula free flap and reconstruction plate. Concomitant chemotherapy radiotherapy was not necessary. The patient has been followed up, and no recurrence has occurred 6 months after surgery.

A Competitive Core Technology Proposal for a Remodeling Project (경쟁력 있는 리모델링 공사를 위한 요소기술 도출)

  • Han, Ju-Yeoun;Kim, Ki-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.785-789
    • /
    • 2008
  • As people pays more attention to remodeling as a method to effectively improve, maintain, and manage building properties, it is important to ensure the economic feasibility of remodeling compared to reconstruction, instead of focusing on systematic regulations. In order to identify core technologies, the study set criteria to survey cost of a remodeling project by analyzing current status of remodeling projects. Based on the criteria, the study calculated average construction cost for five remodeling projects that were conducted recently, compared the cost with new construction projects, and examined major level works that are essential in a remodeling project. Based on the major level works, the study conducted interviews with construction experts to draw core technologies in design, structure and construction of a remodeling project.

  • PDF

Proposed a Checklist for the Classification of Construction Business Model by Utilizing the Price Influence Factors and the Construction Regulation - As Focus on Aged Public Rental Apartment - (가격영향요인과 건설제도를 활용한 건설사업 유형분류 체크리스트 제안 - 노후공공임대주택 중심으로 -)

  • Park, Seongsik;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.132-141
    • /
    • 2019
  • 1990s, Construction market continued to grow in South Korea exceeding 20% of GDP. In 2015, more than 30 years of old multi-family dwellings amounted to 4.93 million and it continues to increase until 2019. In Particular, the share of Public rental Housing accounts for 90.6% of South Korea's Total aging housing. Before checking the feasibility of Construction Project Management such as Renovation and Reconstruction, Checklists were presented through price impact factor analysis and analysis of housing construction system(Regulation). Based on 32 Price Influencing factors and 20 Indicators based on the housing construction system The Construction project management seems appropriate. As a result, the 22 complexes were found to be suitable for remodeling. This study is meaningful enough to be used for Domestic rental Housing construction and Construction project management and to suggest specificity. Future Research is needed to Quantify the checklist.

A Decision Making Method between Reconstruction & Remodeling for Improvement of the Apartment Housing (공동주택 개량을 위한 재건축과 리모델링의 사업 추진 결정 방법)

  • Kim Hyung-Man;Yoon Suk-Ho;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.476-479
    • /
    • 2004
  • In the process of industrialization of our country in 1970's, Korea's housing strategy has focused on housing supply. Rapid completion and supply of apartment house buildings have caused a problem of their early deterioration due to their poor quality. In 1987 Housing Construction Promotion Act, therefore, included new regulations on housing re-construction. In July 2001, other new regulations on remodeling apartment buildings were also included in the Act. Reconstruction and remodeling have been considered to deal with such problems. This study suggests an appraisal criteria if they can select reconstruction or remodeling method in conducting their apartment building project. At first, evaluation items should be selected by the criteria of function31ity and economical efficiency. Second, the selected item is screened by AHP and multi-criteria decision-making methods. The result of study shows that the owners of apartment units will be able to select reasonable alternatives through the suggested appraisal method

  • PDF

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

A Study on Reconstruction and Remodeling's Selection Factors of Old Apartment Houses Using AHP (AHP를 활용한 노후 공동주택의 재건축과 리모델링의 사업선택결정에 관한 연구)

  • Son, Sung-Hyun;You, Seung-Min;Lee, Ki-Seok;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.12-21
    • /
    • 2015
  • Reconstruction and remodeling have been introduced as a part of renewal (redevelopment) projects for old apartments built after the mid-1970's and government policies for revitalizing each project has been changed continually. However, the frequent changes of the policies have caused conflicts among business entities in selecting business methods. The conflicts from their early stages have made serious problems in the entire business process. Therefore, this study deduced factors of business selection by applying comparison analysis between the two business projects on how certain factors have an influence on selecting reconstruction and remodeling business projects. Based on the analysis, four categories and 26 factors were finally selected. After then, the priority of each selection factor was deduced through the AHP method used for analysis of relative importance and impact values regarding to the business selection. It is expected to resolve conflicts among owners and select rational directions for reconstruction and remodeling business, based on the conclusion through analysis of influence on selection factors.

Decision-Making Process in Rural Reconstruction Project - An Evaluation Technique for Village Planning in Newly Reclaimed Land - (농촌개발사업의 의사결정기구 -간척지 취락계획을 위한 평가체계의 수립-)

  • 최수형;황한철
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.35 no.4
    • /
    • pp.86-94
    • /
    • 1993
  • In this study, a tentative decision-making matrix for village planning in reclaimed land was proposed. The evaluating conditions in the matrix are reclaimed farming acreage and distance. And the indexes for evaluation works are farming acreage required for increasing present farm size to target size in the base of, allowable commuting distance for farming from and effective controlling distance of each village. The village planning strategies are considered into four categories ; upkeep of present village scale, transfer of its superfluous farming acreage to a neighbouring village, enlargement of present village scale and new village construction in reclaimed land. As a case study, the proposed decision-making matrix was applied to 69 villages, which are contiguous to the potential farming area from reclamation works of Yongsan River Basin Comprehensive Development Project Phase Ill and so considered in this study as future farming villages there. From the application results, the following tactics for village planning may be proposed ; principally, upkeep or enlargement of present village scale, but, in an exceptional few cases of standard farming size being 3~5ha, new village construction of normal or satellite scale.

  • PDF

The Investigation on Application of Construction Waste Unit to Establish Resource Recycling System through Case Study (건설폐기물 자원순환체계 구축을 위한 발생원단위 적용에 관한 연구)

  • Son, Byeung Hun;Hong, Won Hwa
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.181-186
    • /
    • 2010
  • Research on construction waste unit was in progress in the 1995 when 'Proper Disposal and Recycling Measures for Construction Waste' was made by the Seoul Development Institute. Such an effort has been made in order to cope with the lack of natural resources in Korea and to utilize the reusable resources. Furthermore, these efforts have also increased due to the improved standing of Korea in the international community. A large number of residential buildings were built in the response to the government's policy by increasing the supply of houses between the 1970's and 1980's. In 2000, more reconstruction and redevelopment was done because of the aged buildings and change of use for those buildings. And the project has been actively promoted until now, which caused a sharp increase in the generation volume of construction waste. In Korea, 8 kinds of construction waste unit, including the standard construction manpower and materials estimation, are introduced. Currently, they provide standards to different building categories and waste properties while for construction sites different standards are applied. This study aims to measure the actual amount of construction waste after sample buildings are dismantled and analyzes the estimation of the waste quantity by using various standard units. Through comparison, this study will figure out the differences among the standard units in order to find out how to apply the standard units properly. Moreover, this research will provide practical measures to apply such units to construction sites.

COST BENEFIT ANALYSIS OF HIGHWAY SYSTEMS

  • Darren Thompson;Don Chen;Nick Walker;Neil Mastin
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.494-496
    • /
    • 2013
  • Cost-Benefit Analysis (CBA) is a systematic optimization process that allows users to compare different alternatives and to determine if a project is a solid investment. Many state DOTs have included CBA in their pavement management systems (PMSs) to help allocate state funds for maintenance, rehabilitation, resurfacing, and reconstruction of pavements. In a typical CBA, each pavement type has an assigned weight factor which represents the level of importance of this pavement type. To conduct an accurate CBA, it is essential to select appropriate weight factors. Arbitrarily assigning weights factors to pavements can lead to biased and inaccurate funding allocation decisions. The purpose for this paper is to outline a method to develop an ideal set of weight factors that can be utilized to conduct more accurate CBA. To this end, a matrix of all possible weight factors sets was developed. CBA was conducted for each set of weight factors to obtain a population of possible optimization solutions. Then a regression analysis was performed to establish the relationship between benefit and weight factors. Finally, a multi-objective genetic algorithm was applied to select the optimal set of weight factors. The findings from this study can be used by state DOTs to strategically manage their roadway systems in a cost effective manner.

  • PDF

Evaluation of the Accuracy of Distance Measurements on 3D Volume-rendered Image of Human Skull Using Multi-detector CT: Effects of Acquisition Section Thickness and Reconstruction Section Thickness

  • Haijo Jung;Kim, Hee-Joung;Lee, Sang-Ho;Kim, Dong-Wook;Soonil Hong;Kim, Dong-Hyeon;Son, Hye-Kyung;Wonsuk Kang;Kim, Kee-Deog
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.457-460
    • /
    • 2002
  • The image quality of three-dimensional (3D) images has been widely investigated by the qualitative analysis method. A need remains for an objective and quantitative method to assess the image quality of 3D volume-rendered images. The purpose of this study was to evaluate the quantitative accuracy of distance measurements on 3D volume-rendered images of a dry human skull by using multi-detector computed tomography (MDCT). A radiologist measured five times the twenty-one direct measurement line items composed among twelve reference points on the skull surface with a digital vernier caliper. The water filled skull specimen was scanned with a MDCT according to the section thicknesses of 1.25, 2.50, 3.75, and 5.00 mm for helical (high quality; pitch 3:1) scan mode. MDCT data were reconstructed with its acquisition section thickness and with 1.25 mm section thickness for all scans. An observer also measured seven times the corresponding items on 3D volume-rendered images with measuring tools provided by volumetric analysis software. The quantitative accuracy of distance measurements on the 3D volume-rendered images was statistically evaluated (p-value < 0.05) by comparatively analyzing these measurements with the direct distance measurements. The accuracy of distance measurements on the 3D volume-rendered MDCT images acquired with 1.25, 2.50, 3,75 and 5.00 mm section thickness and reconstructed with its section thickness were 48%, 33%, 23%, and 14%, respectively. Meanwhile, there were insignificant statistical differences in accuracy of distance measurements among 3D volume-rendered images reconstructed with 1.25 mm section thickness for the each acquisition section thickness. MDCT images acquired with thick section thickness and reconstructed with thin section thickness in helical scan mode should be effectively used in medical planning of 3D volume-rendered images. The quantitative analysis of distance measurement may be a useful tool for evaluating the quantitative accuracy and the defining optimal parameters of 3D volume-rendered CT images.

  • PDF