• Title/Summary/Keyword: reclamation projects

Search Result 123, Processing Time 0.031 seconds

Investigation on Ongoing Tideland Reclamation Projects in Western Coast of North Korea using Satellite Image Data (인공위성 화상데이터를 이용한 북한 서해안지역의 미완공 간척지 조사)

  • 조병진;안기원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.43 no.1
    • /
    • pp.75-86
    • /
    • 2001
  • North Korea reported that tideland reclamation projects had been successfully constructed and/or under construction during the period of the third development scheme(1987∼1993), which were 28,400ha in 9 project areas: 8 projects along the western coast and one in the eastern coast. In this study eight projects located in western coast were investigated in order to confirm the detail of works, construction stages and difference from our project formulation methods using the topographic maps published in different years and the recent sattelite image data especially Lansat TM and SPOT PN. Intensity-hue-saturation (IHS) method was adopted to merge two sattelite data for the image enhancement of remote sensing. Construction stages of sea-dikes, land consolidation for paddy and salt pan, reservoir for irrigation and desalinization and the present land use were investigated and estimated the acreage of the development areas. The total gross project areas of 38,105 ha: 16,555 ha completed for paddy or salt pan, 16,826 ha under construction, and 4,724 ha under planning were confirmed, although the area of 27,100 ha in 8 projects were reported to be completed or ongoing on the bimonthly journal of N. Korean Trend published in 1994.

  • PDF

Characteristics and Reasonable Management Approaches of Coastal Reclamation in Korean (우리나라 연안매립의 특성 및 합리적 관리방안)

  • Eom, Ki-Hyuk;Lee, Dae-In;Kim, Young-Tae;Kim, Gui-Young
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.15 no.3
    • /
    • pp.227-237
    • /
    • 2012
  • This paper analyzes the current status, characteristics, and problems of coastal reclamation in Korea and suggests effective management approaches. Reclamation is concentrated from the West Sea to the South Sea. In the 1980s and 1990s, most projects were intended for agricultural use, whereas in recent years reclamation for industrial and harbour sites(e.g., ship-building) have been increasing. The continuous onslaught of reclamation and development projects threatens the coastal environment, especially tidal flats and fishing areas, and fishery production has been reduced in some areas. The largest tidal flats have been used for dumping sites of dredged coastal sediments, urban development projects, and industrial complex composition. Thus, it is necessary to assess current policy using top-down approaches after establishing appropriate directions and standards for coastal management. Both short-term development profits and long-term conservation should be considered when attempting to balance development and conservation. In addition, improvements of marine environmental impact assessment and in the legal system are necessary.

A Critical Analysis on Korea's Tidelands Policy : From a Sustainable Development Point of View (한국의 갯벌정책에 대한 비판적 소고: 지속가능한 발전의 관점에서)

  • Moon, Seogwoong
    • Environmental and Resource Economics Review
    • /
    • v.16 no.3
    • /
    • pp.575-605
    • /
    • 2007
  • Korea's tidelands policy IS examined and criticized in the paper. Korea's major tidelands in the west coast might disappear within a decade. The anachronistic development IS driven by the political interest group, forming coalition for reclamation and busily fulfilling its own profits under the facade of public good and regional development. But all regions of the world have been gradually scrapping the massive reclamation projects since the 1970's and active movements to reverse the reclamation and restore the nature are on the rise. In 1978, the U.S. Supreme Court decided to suspend the construction of the dam and to protect the snail darter despite that over 100 million dollars had been injected. This court ruling became famous and caused the American public to change their perception about the environment. In the Netherlands, following a prolonged discussion on pros and cons of reclamation, open type seawall was adopted to strike a balance among the available alternatives. Japan's Ministry of Environment was praised for forming the National Wetland Committee in order to designate 20 new Ramsar sites by 2008, with an objective to reach 33 designated Ramsar sites. Away from the large-scale reclamation projects, Korea has to move towards smaller-scale projects focusing on the knowledege intensive and circular economy society that are more in harmony with the environment.

  • PDF

A Study on Digitization and Figuration Analysis of the Underground Mine Cavity Using MIRECO EYE System (MIRECO EYE 시스템을 활용한 광산 지하공동의 수치화 및 형상화 분석 연구)

  • Kim, Soo Lo;Park, Jay Hyun;Yang, In Jae
    • Tunnel and Underground Space
    • /
    • v.28 no.5
    • /
    • pp.387-399
    • /
    • 2018
  • Mine reclamation project is closely related to human's past mining activities and the current human's living environment. It is a reason for the national management. In order to efficiently carry out mine reclamation projects, a precise investigation and analysis of the underground space of the abandoned mine is required. Korea MINE RECLAMATION Corp. is developing a practical technology that is effective in investigating and actually measuring underground cavities. MIRECO EYE system is an exploration equipment for 3D digitization and figuration of underground cavities. As combining a laser, sonar and image acquisition technology, it enables access to information about inaccessible underground cavities and effective management of subsidence risk of mined area. and currently it is also utilized for various purposes in related areas such as investigating urban sinkholes. This article is precise numerical and geometric information analysis obtained through MIRECO EYE system.

Hwaong Eco-park Land Use Plan in Consideration of Reclamation (화옹지구 간척생태공원 토지이용계획)

  • Sung, Ji-Young
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.443-449
    • /
    • 2005
  • As sustainable development and environment-friendly efforts in large-scale development projects emerge as major interests at home and abroad, man-made wetlands and eco-park facilities have been newly planned or created when developing reclamation districts recently. In this study, based on findings from a comprehensive review of relevant studies and planning cases, the basic direction and objectives of the plan were developed. A comprehensive analysis on the status of ecological environment and demographic and social environment showed that the planned site is in a process of migrating from early stages of reclamation to middle stages. It was planned for the eco-park to function as a major base along an ecological network consisting a freshwater lake and rivers and streams flowing into the lake in Hwaong District. Through a master plan and sectoral plans were planned according to desalination levels after reclamation. Then, habitats for livings organisms were also planned. The eco-park, the planned site, is also in a process of migrating from the early stages to middles stages. By creating an eco-park that considers post-reclamation ecological environment changes, natural succession processes will be preserved, which is expected to help local ecosystems to restore their functions on their own over a relatively long period of time and enable to observe the restoration process.

  • PDF

A Study on Rational Alternative Comparison of Prior Review on Environmental Conditions for Basic Plan of Public Waters Reclamation (공유수면매립 기본계획 사전환경성검토의 합리적인 대안비교에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo;Byon, Seong-Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.6
    • /
    • pp.563-571
    • /
    • 2010
  • In carrying out the prior review on environmental conditions for basic plan of public waters reclamation, the important item is review on conditions of location on prearranged reclaimed land. In this study, environmental assessment which needs careful consideration in the first stage of selecting location is presented by analyzing environmental impact assessment on public waters reclamation projects for about 10 years. The assessment index for alternative comparison is divided into two parts according to importance level. What is most important in alternative comparison is the comparison on direct influence due to reclamation. In other words, it figures out damaged extent of natural shoreline as well as intertidal and infralittoral zones. Comparing influence extent due to reclamation through the 1st comparison on this is regarded as to be important. In case there is no significant difference by alternatives through the 1st assessment, the 2nd assessment should be carried out. In the 2nd assessment indexes are damaged quantity of benthic organism, change in seawater current, erosion, accumulation and exchangeable rate of seawater. The plan for selecting optimal location which minimizes environmental influence in establishing public waters reclamation plan is demonstrated through model cases. For this, 3 districts which have similar environment and scale are selected, and then comparison on location alternative is made through environmental assessment index. In addition, the comparison on 3 arrangement alternatives are conducted, targeting certain areas. It is thought that carrying out comparison review on respective areas in the same cities and counties, not merely comparing arrangement plan by selecting 1 targeting area in advance, is the most appropriate. Besides, selection of arrangement plan considering environment, which minimizes damage of natural shoreline and influence due to change of seawater current is required in alternative comparison on arrangement plan as well. In case of the prior review on environmental conditions though alternative comparison method presented in this study is carried out, it is safely said that the influence on ocean environment due to public waters reclamation can be minimized.

The Study on the Engineering Characteristics by Self-Hardening of Coal Ash (석탄회의 자경성에 따른 공학적 특성연구)

  • Sang, Jung-Hyuk;Shin, Woong-Gi;Kim, Ji-Won;Chun, Byung-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09b
    • /
    • pp.81-87
    • /
    • 2010
  • As enormous construction projects of land development are carried out around Korea, useful construction materials are needed to perform the construction projects. However, there are no more enough of fill and reclamation materials in our country. That is why the coal ash is expected to be utilized as an alternative material. Since the coal ash has the characteristics of a pozzolan and a selfhardening material, it is adjudged that coal ash has a great possibility to be used as a fill and reclamation material. In this study, grain size analysis, Atterberg limit test, and specific gravity test were performed to examine the physical characteristics of the coal ash about a self-hardening material before utilizing the coal ash in the construction. Compaction test, unconfined compression test were conducted to investigate the engineering characteristics according to mixture ratios of fly ash and bottom ash. As a result of the tests, it was confirmed that the mixing ratio 1:1 of fly ash and bottom ash is the most effective to use as a fill and reclamation material. If the mixture of coal ash is used as a backfill material with light weight around structure, it is expected to play a significant role in reducing earth pressure on the back of the structure. As described above, the coal ash should be considered as an alternative material of fill and reclamation materials since the result of the tests indicates that the coal ash is suitable to a useful material on the construction design.

  • PDF

Simulation of Tidal Flow and Water Quality in Onsan Harbor System (온산 항만 시스템에서 조류와 수질 변화 시뮬레이션)

  • Kim, So-Yeon;Park, Seok-Soon
    • Journal of Environmental Impact Assessment
    • /
    • v.8 no.3
    • /
    • pp.13-22
    • /
    • 1999
  • Tidal flow and water quality were simulated in this paper to assess environmental impact caused by pier construction projects in Onsan harbor system. The Surfacewater Modeling System (SMS) was applied to the Onsan harbor system, where coastal reclamation and dredging were planned to build the piers. A finite element mesh was constructed and refined to cover the complicated geometry of the Onsan harbor and the proposed reclamation area. The time variable change of tidal height at harbor inlet was given as an input condition to tidal simulation. The water quality simulation was based on the discharge rate of suspended solids at the reclamation area. The simulation results have shown reasonable agreements with real situations in both tidal flow and water quality. According to the proposed plan, tidal flow and water quality were predicted during and after the pier construction. The tidal simulation study showed that there would be no discernible change of tidal current in the harbor except for the dredged area. The water quality simulation, however, predicted that suspended solids would increase significantly near the reclaimed and dredged areas during construction.

  • PDF