• Title/Summary/Keyword: reasonable contract construction period

Search Result 2, Processing Time 0.016 seconds

A Case Study and Analysis on Reasonable Construction Period and Appropriate Number of Persons for Works According to Reconstruction (재시공발생에 따른 적정계약공기 및 적정출력인원 추정에 관한 사례조사 및 분석)

  • So Young-Sung;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.301-304
    • /
    • 2001
  • The purpose of this study is presume that reasonable construction period of constract and appropriate number of persons for works according to reconstruction. This study is presume reasonable construction period of constract and appropriate number of person of reconsruction with a case study out of apartment R.C construction. The result of this study are as follows: 1. In case of four building of apartment Resonable constrution period: 750days$\sim$800days, the average(1day) number of persons under working: 63.5 persons. 2. In case of four building of apartment Resonable constrution period: 850days$\sim$900days, the average(1day) number of persons under working: 100.6 persons. 3. In case of four building of apartment Resonable constrution period: 1000days$\sim$1050days, the average(1day) number of persons under working: 145.0 persons.

  • PDF

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.