Research status of the development of genetically modified papaya (Carica papaya L.) and its biosafety assessment (GM 파파야 개발 및 생물안전성 평가 연구 동향)
-
- Journal of Plant Biotechnology
- /
- v.45 no.3
- /
- pp.171-182
- /
- 2018
Papaya (Carica papaya L.) is one of the crops widely planted in tropical and subtropical areas. The papaya fruit has low calories and are plentiful in vitamins A and C and in minerals. A major problem in papaya production is a plant disease caused by the papaya ringspot virus (PRSV). The first PRSV-resistant GM papaya expressing a PRSV coat protein gene was developed by USA scientists in 1992. The first commercial GM papaya cultivars derived from the event was approved by the US government in 1997. Development of transgenic papayas has been focused on vaccine production and limited agricultural traits, including insect and pathogen resistance, long shelf life, and aluminum and herbicide tolerance. Approximately 17 countries, including the USA and China, produced transgenic papayas and/or commercialized them, which provoked studies on biosafety assessment and development of GM-detection technologies. For the biosafety assessment of potential effects on human health, effects of long-term feeding to model animals have been studied in terms of toxicity and allergenicity. Studies on environmental safety assessment include influence on soil-microbial biodiversity and transfer to soil bacteria of GM selection markers. Many countries, such as Korea, the European Union, and Japan, that have strict regulations for GM crops have serious concerns about unintended introduction of GM cultivars and food commodities using unauthorized GM crops. Transgene- and/or GM event-specific molecular markers and technologies for genomics-based detection of unauthorized GM papaya have been developed and have resulted in the robust detection of GM papayas.
The multi-layer insulating curtains used in the experiment was produced in six combinations using non-woven fabric containing aerogel and compared and analyzed by measuring heat flux and heat perfusion rates due to weight, thickness and temperature changes. Using silica aerogel, which have recently been noted as new material insulation, this study tries to produce a new combination of multi-layer insulating curtains that can complement the shortcomings of the multi-layer insulating curtains currently in use and maintain and improve its warmth, and analyze the thermal properties. The heat flux means the amount of heat passing per unit time per unit area, and the higher the value, the more heat passing through the multi-layer insulating curtain, and it can be judged that the heat retention is low. The weight and thickness of multi-layer insulation curtains were found to be highly correlated with thermal insulation. In particular, insulation curtains combined with aerogel meltblown non-woven fabric had relatively higher thermal insulation than insulation curtains with the same number of insulation materials. However, the aerogel meltblown non-woven fabric is weak in light resistance and durability, and there is a problem that the production process and aerogel are scattering. In order to solve this problems, the combination of expanded aerogel non-woven fabric and hollow fiber non-woven fabric, which are relatively simple manufacturing processes and excellent warmth, are suitable for use in real farms.
Florence is the cradle of the Italian Renaissance. It is the result of a combination of medieval humanists' exploration of ancient Greek and Roman knowledge and culture, the leadership of great monarchs and priests, patronage of the Medici family, etc., free-thinking and creativity of artists, and critical consciousness and cultural needs of citizens. However, the Florentine Renaissance could not have blossomed unless the Medici family had collected ancient manuscripts and translations, and built libraries to preserve and provide literature. Based on this logical basis, this study outlined the Florentine renaissance and historic libraries, analyzed the collection and composition of favorite books of the Medici family, and traced the architectural characteristics and metaphors of the Medici libraries, The San Marco Library (Michelozzo Library), Library of Badia Fiesolana, and the San Lorenzo Library (Laurentian Library) were the priming and birthplace of the Florentine Renaissance despite of many difficulties, including earthquake, fire, restoration, transfer, seizure, and closure. In particular, the San Marco Library, which was opened in 1444 based on the financial support of Cosimo de' Medici, Michelozzo's design, and Niccoli's private collections was the first common library in the Renaissance period. And the architectural highlight of the Laurentian Library, which opened in 1571 under the leadership of Giulio (Papa Clemente VII), is Michelangelo's staircase, which symbolizes 'from ignorance to wisdom', and the real value of the content is the ancient manuscripts and early printed books, which were collected by the humanist Niccoli and the Medici family. In short, when discussing the Florentine Renaissance, Medici's collection and historic libraries are very important points. The reason is that the ancient collections were not stuffed products, but syntactic semiotics, and the libraries are telescopes that view the history of human knowledge and culture and microscopes that create knowledge and wisdom. If records dominate memories, libraries accumulate records. Therefore, long breathing and time capsule strategies are also required for the development and preservation of retroactive books in domestic libraries with a relatively long history.
The wall shear stress in the vicinity of end-to end anastomoses under steady flow conditions was measured using a flush-mounted hot-film anemometer(FMHFA) probe. The experimental measurements were in good agreement with numerical results except in flow with low Reynolds numbers. The wall shear stress increased proximal to the anastomosis in flow from the Penrose tubing (simulating an artery) to the PTFE: graft. In flow from the PTFE graft to the Penrose tubing, low wall shear stress was observed distal to the anastomosis. Abnormal distributions of wall shear stress in the vicinity of the anastomosis, resulting from the compliance mismatch between the graft and the host artery, might be an important factor of ANFH formation and the graft failure. The present study suggests a correlation between regions of the low wall shear stress and the development of anastomotic neointimal fibrous hyperplasia(ANPH) in end-to-end anastomoses. 30523 T00401030523 ^x Air pressure decay(APD) rate and ultrafiltration rate(UFR) tests were performed on new and saline rinsed dialyzers as well as those roused in patients several times. C-DAK 4000 (Cordis Dow) and CF IS-11 (Baxter Travenol) reused dialyzers obtained from the dialysis clinic were used in the present study. The new dialyzers exhibited a relatively flat APD, whereas saline rinsed and reused dialyzers showed considerable amount of decay. C-DAH dialyzers had a larger APD(11.70
The wall shear stress in the vicinity of end-to end anastomoses under steady flow conditions was measured using a flush-mounted hot-film anemometer(FMHFA) probe. The experimental measurements were in good agreement with numerical results except in flow with low Reynolds numbers. The wall shear stress increased proximal to the anastomosis in flow from the Penrose tubing (simulating an artery) to the PTFE: graft. In flow from the PTFE graft to the Penrose tubing, low wall shear stress was observed distal to the anastomosis. Abnormal distributions of wall shear stress in the vicinity of the anastomosis, resulting from the compliance mismatch between the graft and the host artery, might be an important factor of ANFH formation and the graft failure. The present study suggests a correlation between regions of the low wall shear stress and the development of anastomotic neointimal fibrous hyperplasia(ANPH) in end-to-end anastomoses. 30523 T00401030523 ^x Air pressure decay(APD) rate and ultrafiltration rate(UFR) tests were performed on new and saline rinsed dialyzers as well as those roused in patients several times. C-DAK 4000 (Cordis Dow) and CF IS-11 (Baxter Travenol) reused dialyzers obtained from the dialysis clinic were used in the present study. The new dialyzers exhibited a relatively flat APD, whereas saline rinsed and reused dialyzers showed considerable amount of decay. C-DAH dialyzers had a larger APD(11.70
As our economy grows and the number of aircraft increase, the number of civil execution against aircraft cases are likely to increase as well in the future. The purpose of this article is to present the legal theory on the civil execution against aircrafts by drawing on the legal theory on the civil execution against vessels which constitute a relatively large number of cases thus observed. The provisions of the civil execution against immovables or vessel, shall basically apply mutatis mutandis to the civil execution against aircraft or light aircraft. The civil execution against ultra-light flying devices or a foreign aircraft shall be executed in conformity with the civil execution against movables. There are a compulsory auction, an auction to execute a security right to aircraft, and an auction under the right of retention, etc. in the civil execution against an aircraft. A compulsory execution against an aircraft means an execution carried out by a creditor against a debtor's aircraft to obtain satisfaction of claims for the purpose of payment of money. The court of execution of a compulsory execution against an aircraft shall be the district court having jurisdiction over the airport of stoppage or storage of such aircraft at the time of seizure. The forums of execution of a compulsory execution against an aircraft shall be exclusive forums. When a court has rendered an order on commencing an auction, it shall order an execution officer to receive a certificate of the aircraft's registration and other documents as required for its operation, and to submit them to the court. A court may revoke the procedures for a compulsory auction when an execution officer fails to obtain a transfer of the aircraft's registration certificate, etc. and the location of the aircraft is not evident, not later than an elapse of 2 months from the date on which an order on commencing an auction has been rendered. In the case where it is deemed that there exists a business-related need or other based on proper reasoning, the court may permit the aircraft's operation, upon the motion submitted by the debtor. In this case, there shall be a consent from the creditor, the highest bidder, the next highest bidder and successful bidder. A court may, upon a motion submitted by the creditor, make the dispositions required for observing and preserving the aircraft. When a debtor has submitted the documents under subparagraph 2 or 4 of the Article 49 of the Civil Execution Act, and furnished the guarantee equivalent to the claims of the execution creditors and the creditors demanding a distribution and to the costs for execution, before a declaration of bid, the court shall, upon request, revoke other procedures than those for distribution. The provisions of a obligatory auction against vessel or aircraft and an auction to execute a security right to real estate or vessel, shall apply mutatis mutandis to an auction to execute the security right to aircraft. In an auction to execute the security right to aircraft case, an executive title is not necessary. An executory exemplification is not necessary in an application for an auction to execute the security right to aircraft. A court should examine the existence of security right and claim secured. No order on commencing an auction procedure shall be issued with non-existence or invalidity of the security right and absence or extinguishment of the claim secured. Furthermore, these prohibitions are the reason of a decision on non-permit for sale, the court overlooked these prohibitions, and the decision on a permit for sale became final and conclusive, the successful bidder who paid the price and registered of ownership could not acquire ownership of the aircraft sold. A court may render a ruling to put plural aircrafts up for a blanket auction, only when they are in restraint and related matter (Supreme Court Order 2001Ma3688 dated on August 22, 2001). A righter of retention on aircraft may file a request for an auction against the aircraft. The provisions of an auction to execute a security right to aircraft shall apply mutatis mutandis to the formal auction. Airport facility fee and an aircraft are not in restraint and related matter, so an airport management corporation does not hold the right of retention on the aircraft (Supreme Court Decision 2011Da29291 decided on April 10, 2014). In an auction in accordance with the right of retention, all encumbrances (e.g., mortgages) on the sold aircraft shall be extinguished by a sale under the legal conditions for sale. Not only creditors who have claims for preferential payment but also general creditors could demand for distribution. The precedence of the claim of the right of retention on aircraft and that of general creditor's claims are equal.