• Title/Summary/Keyword: railway track

Search Result 1,572, Processing Time 0.029 seconds

Aggregate Criterion for Paved Track Considering Recycling of Railway Ballast (도상자갈 재활용을 고려한 포장궤도용 골재 기준)

  • Lee, Il-Wha
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.481-487
    • /
    • 2009
  • On the paved track, the railway ballast is used as aggregate for the filling layer using the pre-packed concrete method. The condition of ballast as the paved track aggregate ensure that the compressive strength, particle distribution size for the pouring and surface clearance to increase the adhesive strength with mortar. It is profitable to recycle the existing railway ballast as a economical supply. In order to increase recycling characteristic, it is necessary to apply the similar criterion which does not exceed the conventional railway ballast criterion. Consequently, this paper was to investigate physical characteristics of existing ballast, particle size distribution, compressive and flexural strength, bearing capacity and filling capacity to prepare the aggregate's recycling. As a result, optimized aggregate criterion is suggested.

Improvement of inspection system for common crossings by track side monitoring and prognostics

  • Sysyn, Mykola;Nabochenko, Olga;Kovalchuk, Vitalii;Gruen, Dimitri;Pentsak, Andriy
    • Structural Monitoring and Maintenance
    • /
    • v.6 no.3
    • /
    • pp.219-235
    • /
    • 2019
  • Scheduled inspections of common crossings are one of the main cost drivers of railway maintenance. Prognostics and health management (PHM) approach and modern monitoring means offer many possibilities in the optimization of inspections and maintenance. The present paper deals with data driven prognosis of the common crossing remaining useful life (RUL) that is based on an inertial monitoring system. The problem of scheduled inspections system for common crossings is outlined and analysed. The proposed analysis of inertial signals with the maximal overlap discrete wavelet packet transform (MODWPT) and Shannon entropy (SE) estimates enable to extract the spectral features. The relevant features for the acceleration components are selected with application of Lasso (Least absolute shrinkage and selection operator) regularization. The features are fused with time domain information about the longitudinal position of wheels impact and train velocities by multivariate regression. The fused structural health (SH) indicator has a significant correlation to the lifetime of crossing. The RUL prognosis is performed on the linear degradation stochastic model with recursive Bayesian update. Prognosis testing metrics show the promising results for common crossing inspection scheduling improvement.

Evaluation of Track Irregularity Effect due to Adjacent Excavation on Serviced Railway Line (철도시설물 인접굴착공사에 따른 운행선 궤도의 궤도틀림 영향 평가)

  • Choi, Jung-Youl;Park, Dong-Ryong;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.401-406
    • /
    • 2019
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, sleepers, and track elastic springs(ballast, rail pad). As a result of analyzing the track deformation level of the existing tracks due to the excavation work adjacent to the railway facilities, it was found that the track irregularity evaluation criteria (allowed values) of both conventional and high-speed railways lines were satisfied. Based on the numerical analysis using the track model, it was analyzed that the results of the prediction of the track irregularity due to the excavation work and the level of the track deformation occurring at the actual site could be approximated as closely as possible.

A Study on the Assessment of Track Stabilization on Ballast Cleaning work site (크리너 작업구간 선로안정화 상태평가에 관한 연구)

  • Jeon, Il-Sik;Lee, Syeung-Youl;Choi, Hyoung-Su;Kim, Han-Chip
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.268-274
    • /
    • 2011
  • In railway, Ballast plays an essential role as intermedium in transmitting train load to subgrade safely. Gyoung-Bu HSL 1st phase consists of ballasted track except for over 5km long tunnels. Ballast track occurred track irregularity by train loads and requires periodic maintenance work. However, Repetitive train operation and tamping work cause to accelerate track irregularity and ballast deterioration such as abrasion and crushing. For these reason, Track irregularity areas had occurred ballast cleaning work to improve track quality. However, for the train to run safety, ballast cleaner working area needs train speed reduction and track stabilization work due to ballast relaxation and initial settlement. In this study, according to train speed-up and cumulative traffic tonnage, we measured and analyzed the track settlement and acceleration of sleepers to evaluate of track stabilization in order to keep the ballast condition stable after cleaning work.

  • PDF

Soil and Track Interaction under Railway Loads (열차하중에 대한 지반-제도의 상호작용)

  • Kang Bo-Soon
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.2
    • /
    • pp.116-121
    • /
    • 2005
  • In this report, numerical investigations have demonstrated, that the displacement underneath a moving loading reach a maximum value, if the speed of the load is equal to propagation velocity of the maximum wave. The load speed for which the maximum displacement occurs is called critical speed. The critical speed divides the velocities in a subcritical and a super-critical region. By means of calculations the dynamic behaviour of the slab track-soil is investigated. For concrete slab track dynamic wheel load are given in dependence of relevant excitation mechanismen and speed of the train. These loads can be used for the dimensioning of the track as well as far the prognosis of the vibrations at the track and the surrounding soil.

Investigation of Thermal Stress of Continuous Welded Rail on High Speed Railway Bridge (경부고속철도 교량상 장대레일의 온도응력 계측 실험)

  • Kang, Jae-Yoon;Choi, Eun-Suk;Chin, Won-Jong;Lee, Jung-Woo;Kwark, Jong-Won;Kim, Byung-Suk
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.458-461
    • /
    • 2007
  • Recently, the continuous welded rail(CWR) track has been used for less maintenance of the High-speed railway tracks. In case of CWR track, track buckling has always been an unpredictable event under the high compressive stress in rail. The behavior and stress state of CWR track is manily influenced by its thermal variations, and it is important to understand seasonal variations of rail temperature and stress to predict the track stability. This paper describes the in-site measurement for the rail temperature and rail stress, and the correlation between the rail temperature and stress was examined.

  • PDF

A Study on the Influence of Track Stability for Ballast Resistance Force (도상저항력이 궤도 안전성에 미치는 영향)

  • 박준명;이방우;박선규;이종득
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.3
    • /
    • pp.169-173
    • /
    • 2003
  • Transportation by railroad is superior to other transport in a mass transport, stability, rapid transit, delightfulness and low-pollution etc. But, it need to ensure a track stability that supports the train-load for high-speed in transportation by railroad. Ballast resistance force resists against the buckling of track taking a rail-tie's place. So, it plays an important role in a careful train-service. So, in this papers, we forced on measuring and theorizing about the Ballast Resistance Force that play a key role in track stability and high-speed. And we studied the mechanical property. Finally, we suggested the method of securing Ballast Resistance Force and the report for a careful train-service in high-speed.

A Study on Determination of the Minimum Vertical Spring Stiffness of Track Pads in Korea High Speed Railway. (고속철도 궤도패드의 최소 수직 스프링계수 결정에 관한 연구)

  • Kim Jeong-il;Yang Sin-Chu;Kim Yun-Tae;Suh Sa-Bum
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.504-509
    • /
    • 2005
  • Railway noise and vibration has been recognized as major problems with the speed-up of rolling stock. As a kind of solution to these problems, the decrease of stiffness of track pad have been tried. However, in this case, overturning of rail due to lateral force should be considered because it can have effect on the safety of running train. Therefore, above two things - decrease of stiffness of track pad and overturning of rail due to lateral force - should be considered simultaneously for the appropriate determination of spring coefficient of track pad. With this viewpoint, minimum spring coefficient of track pad is estimated through the comparison between the theoretical relationship about the overturning of rail and 3-dimensional FE analysis result. Two kinds of Lateral force and wheel load are used as input loads. Extracted values from the conventional estimation formula and the Shinkansen design loads are used. It is found that the overturning of rail changes corresponding to the change of the stiffness of track pad and the ratio of lateral force to wheel load. Moreover, it is found that the analysis model can have influence on the results. Through these procedure, minimum spring coefficient of track pad is estimated.

  • PDF

Study of the Long-Term Behavior Characteristics of Roadbed on Concrete Track of High-speed Railway (고속철도 콘크리트 궤도상 토공노반의 장기거동 특성 연구)

  • Choi, Chan-Yong;Jung, Jae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.8-16
    • /
    • 2018
  • This study examined the long-term behavior of a roadbed using high-speed railway concrete track and roadbed measurement data and evaluated the long-term performance of the track and roadbed. Recently, high-speed railway track type has been adopted as a concrete slab. On the other hand, the concrete track is vulnerable to roadbed settlement. In the case of gravel tracks, it is easy to restore the original state by maintenance even if the roadbed settles. On the other hand, in the case of the concrete track, if excessive settlement of the roadbed occurs, cracks are generated continuously on the slabs and sleepers, resulting in greatly reduced usability. For this reason, it is difficult to restore the original state only by partial maintenance. In this paper, a long-term performance evaluation was carried out on a concrete track during operation by monitoring the measurement data of sensors buried from the beginning of construction for approximately 3 years after the high-speed railway opened. Performance evaluation methods include a performance evaluation of track/roadbed when the train passes, long-term track and roadbed performance evaluation, analysis of the track/roadbed effect on long-term settlement and analysis of the factors influencing long-term settlement. The trail response of KTX-Sancheon was greatest in the track/roadbed performance evaluation by train. The results of the long-term track and roadbed performance evaluation were measured within the standard values. The track and roadbed performance impact assessment with long-term settlement was strongly related to TCL settlement. The influences of the water content and groundwater level were verified by analyzing the external factors of long-term settlement. Through such a method, the stability of a track/roadbed can be secured.

Dynamic behavior of Track/Roadbed with Loading Frequency in Concrete Track through Full Scale Model Test (실대형 실험을 이용한 가진주파수 변화에 따른 콘크리트궤도의 동적평가)

  • Choi, Chanyong;Kim, Hunki;Eum, Kiyoung;Kang, Yunsuk
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.3
    • /
    • pp.39-47
    • /
    • 2014
  • In this study, the full scale model tests were performed with track-roadbed system such as Ho-nam high speed railway. The measured data gives good similar a roadbed pressure with equivalent depth to the Odemark's theory. In the case of earth pressures have a under 50 kPa at upper-subgrade applying 330 kN static loading. Results of cyclic loading tests did not differ significantly from those of static loading test. The elastic displacement at HSB layer has a level of 1/100 compared to the 1 mm that it was evaluation criteria for speed up of High Speed Railway. Elastic displacement at subgrade layer was measured a level of 1/175. The dynamic characteristics of track-roadbed with loading frequency level were linearly increased under 35 Hz, while the wheel loading, displacement and acceleration of roadbed were decreased loading frequency above 35 Hz.