• Title/Summary/Keyword: railway test line

Search Result 388, Processing Time 0.031 seconds

Performance Verification of WAVE Communication Technology for Railway Application (차량용 무선통신기술(WAVE)의 철도 적용을 위한 성능검증)

  • Kim, Keum-Bee;Ryu, Sang-Hwan;Choi, Kyu-Hyoung
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.456-467
    • /
    • 2016
  • Wireless Access in Vehicular Environments (WAVE) communication technology, which provides vehicleto-vehicle and vehicle-to-infrastructure communication and offers safe and convenient service, has been developed for application to an Intelligent Transport System (ITS). This paper provides field test results on a study of the feasibility of WAVE technology application to railway communication systems. A test railway communication system based on WAVE technology has been built along the Daebul line and a newly developed EMU. Field tests have been carried out according to the communication function requirements for LTE - R. The test results show that the railway communication system based on WAVE technology meets the functional requirements: maximum transmission length is 730m, maximum transfer delay is 5.69ms, and maximum interruption time is 1.36s; other tests including throughput test, video data transmission test, VoIP data test, and channel switching test also produced results that meets the functional requirements. These results suggest that WAVE technology can be applied to the railway communication system, enabling Vehicle-to-Wayside communication.

Study on Real-Time Load Simulator for Testing Propulsion Inverter Test (추진인버터 시험을 위한 실시간 부하 시뮬레이터에 관한 연구)

  • 김길동;신정렬;이우동;한석윤;박기준
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.1
    • /
    • pp.1-8
    • /
    • 2004
  • A newly-built inverter has to undergo a series of stress tests in the final stage of production line. This can be achieved by connecting it to a dynamometer consisting of a three-phase machine joined by a rigid shaft to a DC load machine. The latter is controlled to create some specific load characteristic needed for the test. In this paper a test method is proposed, in which no mechanical equipment is needed. The suggested test stand consists only of a inverter to be tested and a simulator converter. Both devices are connected back-to-back on the AC-side via smoothing reactors. The simulator operates in real-time as an equivalent load circuit, so that the device under test will only notice the behaviour of a three-phase machine under consideration of the load. In oder to prove rightness of the suggested test method, the simulation and actural experiment carried out emulation for a 2.2kW induction motor.

Estimation of Ride Comfort for Korean High Speed Train at High Speed (고속에서 한국형 고속철도 차량의 승차감 추정)

  • Kim, Young-Guk;Kim, Seog-Won;Mok, Jin-Yong;Kim, Sang-Su;Kim, Ki-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.146-152
    • /
    • 2007
  • The ride comfort is more important in the train speedup. Generally, it is defined as the vehicle vibration. There are many studies on evaluation method of ride comfort for railway. But the ride comfort for Korean high speed train(HSR 350x) has been assessed by statistical method according to UIC 513R. It is impossible for HSR 350x to run at constant speeds above 310km/h during 5 minutes required in UIC 513R because of the same operational condition as KTX and the design limitation of infrastructures. The ride indices data had been acquired from 80 to 310km/h through the on-line test. The present study has suggested the methodology for the estimation of the ride indices at high speed above 310km/h by using those obtained below 310km/h and reviewed the ride comfort for HSR 350x in these speeds.

Estimation of the Dynamic Behavior for Korean High Speed Train at 350km/h using the Accelerations according to the UIC Code 518OR (UIC 518의 진동 가속도 계측을 통한 한국형 고속전철의 350km/h 주행 동적 거동 평가)

  • Kim, Ki-Whan;Kim, Young-Guk;Kim, Seok-Won;Mok, Jin-Yong;Park, Chan-Kyoung
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.544-549
    • /
    • 2006
  • The characteristics of dynamic vibration are generally analyzed by an acceleration of a car body of high speed train and the acceleration can be applied to evaluation of running safety. The test of process and the analysis method about it are well explained on UIC Code 518 OR which is the spacial international standard about running safety and dynamic behavior on the line test for railway vehicle. Korean High Speed Train designed to operate at speed 350km/h has been tested on high speed line since it was developed in 2002 and it recorded the highest speed 352.4km/h at the 16th Dec. 2004 in Korea. This paper includes the analysis of running behavior of this train at speed 350km/h and the analysis of dynamic safety is presented in it, extending to the range of high speed while the UIC 518 limit the speed below 200km/h.

Estimation of Harmonics on Power System of AC Electric Railway (교류 전기철도 전력계통의 고조파 예측량 계산)

  • 송진호;황유모
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.52 no.2
    • /
    • pp.68-79
    • /
    • 2003
  • We estimated harmonics on power system of AC railway based on quantitatively measured harmonics and investigated the need of facilities for harmonics reduction. In order to analysis harmonics which inflow into power system due to increase in collector voltages and harmonic currents generated from the train when the railway is in operation, the railway system Is sectioned into power supply, railway line, AT, sectioning Post and subsectioning post. For analysis of extension of currents resulting from the railway loads, PWM converter, VVVF inverter and the feeder system are modeled based on the dynamic node technique(DNT). In order to test the usefulness of the DNT for analysis of harmonic effects, the measured harmonic currents and harmonic magnification ratios at the S/K substation are compared with simulation results using DNT modelling, which include the results for two cases with and without filters for suppression of harmonic currents. When 8 cars(4M4T) are in operation, the total sum of harmonic currents resulting from the train at M and T phases, which inflow into the substation along with the railway line, is calculated. Using the harmonics analysis program for railway feeder system with these data, the total harmonic distortion factor(710) at the outgoing point of KEPCO substation is computed. The calculation shows that when the maximum THD at the receiving point of H/K substation was 0.0443% which is much lower than 1.5% which is the allowable value of KEPCO at 154kV as well as IEEE-519 above 132kV This result indicates that any measure for harmonics reduction in Incheon International Airport Railway is not needed.

Study for Safety on the Curve in the High-speed Railway Track (고속철도 궤도의 곡선부 주행안전성 평가)

  • Seo Sa-Bum;Lee Dong-Ho;Koo Bong-Kue
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.354-360
    • /
    • 2005
  • The railway track and the substructures constructed in the field test section of Kyongbu High Speed Line are the structures for HSL, for the first time designed and constructed by domestic technical group. It is very important to verify the local design criteria and specifications for these structures and also to assure the recordings for vibration or deflection produced on the essential parts of the structures. The study to verify the high-speed railway track performance and to ensure the run in safety on the track in curved section during the KTX run. Finally, the conclusion are drawn as follows. The measuring values of the deflection effort of the rail and displacement for verifying the track performance in the field test section of Kyoungbu HSL satisfy the criteria of the foreign countries (Japan and Germany). The measured value for the wheel load and the presumed value show the consistent tendency. The wheel loads of the exterior and interior of the rails at the speed superior to 300km/h are measured same. Finally, the comparison between the theoretical value presented during the verification of the derailment to evaluate the safety of the train run at the time of the detailed design of the track and the measured value in the field shows that the correct design of track structure was applied.

An Experimental Study on the Aerodynamic Effects Generated by a Train Passing near by Platform(Conventional Railway Station Field Test) (철도차량의 승강장 통과 시 발생하는 공기역학적 영향에 대한 실험적 연구(기존철도역 현장 시험))

  • 김동현;권혁빈;김문헌;송문석;김도훈
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.2
    • /
    • pp.137-141
    • /
    • 2004
  • A series of filed tests have been performed to investigate the aerodynamic effects on platform of the railway station during the passage of train that can be unpleasant and even dangerous to the pedestrians. To assess the aerodynamic effects on the platform, two aerodynamic properties has been measured; one is the wind gust induced by the train and the other is the pressure pulses generated when the nose and the tail of train passes. To measure these aerodynamic properties during the train passage, an array of hot-wire type anemometers and several sets of pressure transducers have been used, respectively. This paper deals with the filed test on conventional railway at about 100km/h operational speed, in which total 34 measurements has been made at the Bugok station in Seoul-Busan line for Saemaul-ho and Mugungwha-ho train. The results showed dramatic differences in the aerodynamic features between the two trains that are supposed to originate from the contrasting nose shapes of the trains.

Implementing a network infrastructure in an advanced EMU test line (차세대전동차 시험선로 통신망 구축)

  • Won, Jong-Un;Joung, Eou-Jin;Lee, Han-Min;Kim, Gil-Dong;Hong, Jai-Sung;Lee, Jang-Mu;Sung, Chang-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1695-1700
    • /
    • 2011
  • In this paper, we introduce the network infrastructure in an advanced emu test line in Deabul. New technology has been applied to advanced EMU(DMU, integrated broadcasting system, black box and etc). In order to efficient and safely test of new developed train, failure, operation, status of test line and weather information should be monitored in real time. We has implemented a wireless and optical network infrastructure for reliability and scalability. The wireless communication capability between a car and ground is 20Mbps and back-hole network has 50Mbps of the communication performance. The network between test tracks and control office was established in the optical network. That can improve communication reliability.

  • PDF

Development of Load Cell to Measure Contact Force of Pantograph (판토그라프 접촉력 측정을 위한 스트레인 게이지 내장형 센서 개발)

  • Park, Chan-Kyoung;Paik, Jin-Sung;Kim, Young-Guk;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.947-953
    • /
    • 2010
  • The KTX-Sancheon has been commercially operating on the high-speed line since March. 2. In order to verify the performance of high-speed train and core equipments such as current collection system, sophisticated tests and evaluating procedures should have been considering. In this paper, the load cell with a built-in strain-gauge which developed to improve measuring method of contact force between the pantograph and catenary system is introduced. The static test results of the load cell shows that its design is very suitable and applicable for the dynamic test and on-line test. After the test and evaluation of load cell's dynamic calibration with pantograph, we will be applied to test interaction characteristics between the pantograph and catenary system on the high-speed line.

  • PDF

Plan of Test-line Construction for Performance Evaluation of the KRTCS (무선통신기반 열차제어시스템 성능평가 시험선 구축 방안)

  • Yun, Hak-Sun;Kim, Dae-Won;Jang, Sa-Sul;Choi, Jin-Sig
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1041-1048
    • /
    • 2011
  • For "Standardization and Performance Evaluation of the Korea Radio Train Control System(KRTCS) for Urban railway" being driven as a national R&D project, this paper presents the requirements for the performance evaluation of the construction of the demonstration line for the driverless train control system based on radio train control for the urban railways system, which will be installed along the 11.7 km section between the Illo Station, Muan-gun, and Daebul Station(Daebul Line) in Yeongam-gun, Jeollanam-do.

  • PDF