• 제목/요약/키워드: railway test line

검색결과 388건 처리시간 0.022초

전동차용 IGBT형 추진제어장치의 6호선 본선 만차 시험에 관한 연구 (A Study On Full Load Test of IGBT Type Propulsion System for Electric Railway in SMG 6 Line)

  • 박건태;정만규;고영철;방이석;서광덕
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.666-673
    • /
    • 2000
  • This paper describes the full load test results of IGBT VVVF inverter for the railway propulsion system. The 1,650kVA IGBT VVVF inverter has been developed. Therefore, the field test is performed in SMG 6 Line to confirm its the reliability and performance. The train consists of 4M4T(4 Motor car 4 Trailer Car) and the electrical equipment for field test are as follows VVVF inverter 4 sets, 16 traction motors and 2 SIVs. The propulsion system is composed with IC4M(1-Controller 4-Motors). The results of propulsion system which have the excellent acceleration/deceleration and the jerk characteristics as well as starting ability on slope are taken through the field test.

  • PDF

광주도시철도 전동차의 곡선추종성 및 주행안전성 평가 (Estimation of Curving Performance and Running Safety of Gwangju Electric Multiple Unit for City Subway)

  • 함영삼;오택열
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 춘계학술대회
    • /
    • pp.745-750
    • /
    • 2004
  • For the safety of railway, it should be evaluated for the running safety by measuring the derailment coefficient. Although railway has run the fixed and maintained rail, some of railway is derailed. This report shows the results that performed the static load test, wheelset manufacturing for test, main line running test on the basis of the derailment theory and experience. It is executed main line test into more than 80km/h for estimating the curving performance and running safety of Gwangju EMU. As the test results, could confirm the curving performance and running safety of Gwangju EMU from the results of the wheel unloading, lateral force, derailment coefficient etc. Derailment coefficient was less than 0.8, and lateral force allowance limit and wheel load reduction ratio were enough safe.

  • PDF

무도상 판형교의 횡방향 동적거동특성 분석을 위한 실험적 연구 (Field Test to Investigate Lateral Dynamic Characteristics of Steel Plate Girder Railway Bridge without Ballast)

  • 오지택;김현민;박옥정;박찬
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.591-595
    • /
    • 2003
  • Field measurements were conducted to analysis lateral dynamic characteristics of existing steel plate girder railway bridges without ballast. Three bridges which have 9m, 12m, 18m span length in Kyoung-Bu Line were selected for test. According to the each bridge, dynamic lateral deflections and accelerations were measured. From the present study, it was observed that dynamic lateral amplification phenomena caused by a fluctuation of lateral force were occurred under the current running circumstances. Lateral deflections were occurred below than that specified in Korean railway bridge specification, but lateral accelerations is a match for vertical accelerations. From now on, it is in need a plan to reduce lateral accelerations for the conventional railway Line speed up.

  • PDF

철도차량 주행안전성관련 미국 연방법규(CFR)에 따른 본선 Speed Qualification Test 개요 (The introduction of Speed Qualification Test as regulated by US CFR regarding railway running safety)

  • 이강운
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1-5
    • /
    • 2010
  • The Hyundai Rotem company is due to be conducted the main line Speed Qualification Test as regulated by CFR for SEPTA EMU and SCRRA Bi-level coach project. The regulated test items per 49CFR213.345 are wheel/rail interaction forces and carbody/truck accelerations during running on main line. Therefore the special two sets of instrumented wheelset (IWS) per each project have been made for measuring the interaction forces between wheel and rail at four wheels of one truck during running on main line. In this paper, regarding Speed Qualification Test, the required test items and data analysis method per 49CFR213.345 and the preparation status of instrumented wheelsets (IWS) are introduced.

  • PDF

도르래식 장력조정장치 개발 (Development of a Pulley-type Tensioning Device)

  • 이기원;조용현;박영
    • 한국철도학회논문집
    • /
    • 제12권5호
    • /
    • pp.663-669
    • /
    • 2009
  • 전기철도에서 열차의 속도향상을 위하여 전차선의 장력상승은 필수적이며, 전차선로의 집전성능은 장력에 따라 크게 좌우한다. 경부고속철도에서 사용하고 있는 도르래식 장력장치는 장력변동율이 3% 이내로 규정되어 있고, 전량 수입에 의존하고 있다. 따라서 고속선에서의 장력변동을 요구소건을 만족하는 도르래식 장력조정장치를 개발하였다. 개발한 장력조정장치의 성능을 확인하기 위하여 경부고속철도 장력조정장치의 규격에 따라 성능시험, 내하중 시험 및 파단시험을 수행하였다. 장력조정장치의 신뢰성을 확보하기 위하여 공장에서의 피로시험과 충북선 본선에서 1 년 이상을 시범설치, 운영하였다. 이들 시험을 통하여 개발된 장력조정장치가 신뢰성을 가지며 본선에 적용할 수 있다는 것을 입증하였다.

자동열차보호장치(ATP) 지상설비 시험절차에 대한 고찰 (A review of ATKP LEU System's Test procedure)

  • 장석각;김진환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1480-1483
    • /
    • 2009
  • The KNR wayside and onboard subsystem has completed commissioning tests applicable to the Pilot Line section by BOMBARDIER. Andreas Hardt/Assessor and Rod Muttram/VP, Quality & safety approved the Automatic Train Protection(ATP) System. However additional evidences are necessary to come to a Specific Application, which is mandatory to approve the Generic Applications included for commercial running on the overall main line railway with ATP. According to Factory Acceptance Test plan, CBC, CBF, LEU(Line Electronic Unit) made by domestic factory is tested by official recognition test Standards-Setting Agency. It is important to verify quality which form checklist during Factory Acceptance Test. In this paper, review the process, test item, norm and checklist for the CBC, CBF, LEU.

  • PDF

무도상 판형교의 동적거동특성 분석을 위한 실험적 연구 (Field Test to Investigate Dynamic Characteristics of Steel Plate Girder Railway Bridges without Ballast)

  • 최진유;오지택;김현민;이상배
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.678-683
    • /
    • 2002
  • Field measurements were conducted to analysis dynamic characteristics of existing steel plate girder railway bridges without ballast. Three bridges which have 9m, 12m, 18m span length in Kyoung-Bu and Ho-Nam Line were selected for test. According to the each bridge, dynamic vertical deflections and vertical and horizontal accelerations were measured. Natural frequencies, vertical deflections and accelerations obtained from field tests were compared with the limit value specified in the UC, Japanese and Korean railway bridge specification.

  • PDF

경전철 시험선용 전력공급시스템 설계 (The design of the traction power supply for the test line of Light Rail Vehicle)

  • 김국진;백병산;전용주;정상기;김남규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.322-328
    • /
    • 2001
  • In the electric railway systems, it is very important that we should design the system configuration, location and power capacity of substation. This paper presents the results of system configuration and system design of the DC traction power supply for the test line of Light Rail Vehicle. The voltage fluctuation of train and the power capacity of substation are calculated by computer simulation using the nodal equation, K.C.L/K.V.L, Ohm's law and superposition theory.

  • PDF

시운전 시험을 통한 한국형 고속전철 차체진동 특성의 분석 및 평가 (Analysis and Evaluation of Body Vibration Characteristics for Korean High Speed Train through On-line Test)

  • 김영국;김석원;박찬경;김기환;목진용
    • 한국철도학회논문집
    • /
    • 제6권4호
    • /
    • pp.286-293
    • /
    • 2003
  • The prototype of Korean high speed train (HSR350), composed of two power cars, two motorized cars and three trailer cars, has been designed, fabricated and tested. In this paper, the body vibration has been reviewed from the viewpoint of the vehicle's safety and the vibration limits for components and sub-assemblies mounted on the car-body using by the experimental method. And, the dynamic characteristics, such as jerk, natural mode and kinematic mode, have been reviewed. The KHST has been run to 300 km/h in the KTX line and the results of on-line test show that it has no problems in the vehicle's safety and the vibration limits. And the characteristics of body vibrations has been predicted at 350 km/h by fitting curve about the measured acceleration signals.

G7 고속전철 기술개발사업에서의 차량시스템 엔지니어링기술 및 시제차량 디자인 개발 (Development of Train System Engineering Technology and Exterior and Interior Design of Prototype Test Train in G7 Project for High Speed Railway Technology)

  • 정경렬;김경택;이병종;윤세균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.533-541
    • /
    • 2003
  • This paper shows the results of train system engineering technology and exterior and interior design of a prototype test train(HSR 350X) which was developed in R&D project titled 'Development of High Speed Railway Technology'. The prototype test train, which has two power cars, two motorized trailers and three trailers, is now being tested on high speed line.

  • PDF