• Title/Summary/Keyword: railway safety case

Search Result 307, Processing Time 0.027 seconds

The example of the Carbon Grounding Modules installation for PSD systems at a subway station, Seoulmetro (서울메트로 PSD장비 탄소접지모듈 설치 사례)

  • Chung, Young-Ki;Hyeon, Yong-Seop;Song, Byeong-Gwon;Kim, Yong-Hyeop
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.292-298
    • /
    • 2008
  • Seoul Metro and Seoul Metropolitan Rapid Transit Corp. have started installing screen doors at subway platforms to improve the environment of subways and prevent passengers' accidents since 2006. They are still installing screen doors at subway platforms and Metropolitan Rapid Transit Corporations in other areas are also proceeding with installment of screen doors or making preparations for it. Grounding is necessary for installing PSD systems. In case that PSD grounding is connected with existing electrical equipment grounding system, it was decided to install separate grounding for safe operation of PSD system and passenger safety. However, it's very difficult to install new grounding at the subway station compound. A way to improve this condition is that we proceed with grounding by composing grounding station by carbon grounding rod. This paper will mainly deal with how to design and construct carbon ground rod, which has been applied to PSD system grounding since 2006, including its experimental examples. In this paper, ways to secure ground resistance below 5 ohms, which is resistance necessary for PSD grounding, and to compose grounding system were also discussed. Furthermore, a ground test to check the ability to fulfill a role of PSD grounding system was conducted. As a result of applying carbon grounding module, PSD system is being operated without any problem and the installment of PSD system will be continuously expanded in the future. It's also thought that a way to integrate grounding of each functional room which has been installed at the subway station compound and to arrange equipotential grounding should be reviewed and performed promptly.

  • PDF

A Study of Interference on Underground Tunnel in Radio Frequency-Communication Based Train Control System (무선 통신기반 열차제어시스템의 지하구간 전파간섭에 대한 연구)

  • Noh, Young-Un;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1370-1378
    • /
    • 2008
  • In the system necessary for safety such as the train control system, to make train control information be sent correctly is very important. In the case of the system such as RF-CBTC(Radio Frequency-Communication Based Train Control), sometimes failure in correctness of train controlling information may happen because the information is sent throughout wireless transmission between on-board system of a train and wayside transmitter, and then, it is exposed to noises. Of RF-channel interference, there are various forms. Under the environment of mobile telecommunications, adjacent-channel interference and Co-channel interference are in trouble, and under the environment of the wireless LAN, inter-symbol interference is in trouble. Also, the system of the cellular CDMA mobile telecommunication is affected on the RF-channel interference such as Doppler effect, multi-cell interference, and other users' intervention. In this paper, we analyzed the effect of the train control information related to fading, intervention and other noises made in the underground interval and explained the transmission characteristics numerically. Furthermore, we calculated the mean of the error terms by increasing users in the system of the cellular CDMA. As the method for decrease the error term of sent information, we represented the way adjusting the arrangement of antennas, and we did the model related to the system of RF-CBTC in which the location of an antenna is calculated with really measured value of the transmission characteristics and the way confirming reliability of the wireless transmission.

  • PDF

A Study on Determination of the Minimum Vertical Spring Stiffness of Track Pads Considering Running Safety (열차주행안전을 고려한 궤도패드의 최소 수직 스프링계수 결정에 관한 연구)

  • Kim, Jeong-il;Yang, Sin-Chu;Kim, Yun-Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.2D
    • /
    • pp.299-309
    • /
    • 2006
  • Railway noise and vibration has been recognized as major problems with the speed-up of rolling stock. As a kind of solution to these problems, the decrease of stiffness of track pad have been tried. However, in this case, overturning of rail due to lateral force should be considered because it can have effect on the safety of running train. Therefore, above two things - decrease of stiffness of track pad and overturning of rail due to lateral force - should be considered simultaneously for the appropriate determination of spring coefficient of track pad. With this viewpoint, minimum spring coefficient of track pad is estimated through the comparison between the theoretical relationship about the overturning of rail and 3-dimensional FE analysis result. Two kinds of Lateral force and wheel load are used as input loads. Extracted values from the conventional estimation formula and the Shinkansen design loads are used. It is found that the overturning of rail changes corresponding to the change of the stiffness of track pad and the ratio of lateral force to wheel load. Moreover, it is found that the analysis model can have influence on the results. Through these procedure, minimum spring coefficient of track pad is estimated.

Analysis on Intersection Traffic Signal Locations Change and Characteristics of Dilemma Zone (교차로 신호기 위치 조정과 딜레마존 특성 분석)

  • Lim, Sam Jin;Lee, Young-Ihn;Kim, Kyung Hee
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.1
    • /
    • pp.3-13
    • /
    • 2013
  • This paper reviews the characteristics of dilemma zone by analysing the influence exerted by actual location of intersection traffic signal on behaviour of drivers approaching signalized intersection in urban area. The analysis of approach speed was based upon a 'before and after' comparison, measured at three sites where the locations of traffic signals were changed. The study demonstrated that, when traffic signal changed to yellow, the scales of dilemma zone were narrowed in case of stopping cars by moving up the starting point of the dilemma zone due to lowered spot speed. On the other hand, in case of passing cars, the end points of dilemma zone were moved further out to the rear due to increased spot speed. Therefore, changing traffic signal locations could make an impact to increase intersection safety through reducing the scales of dilemma zone. This study also found that, in cases involving vehicles with similar approach speeds, spot speeds could be differentiated following the change of signal locations due to the fact that there can be greater differences in both braking point and deceleration rate. Thus, when considering the appropriate measuring of dilemma zone, 'spot speed' rather than 'approach speed' appeared to be more appropriate criterion.

A study on the face pressure control and slurry leakage possibility using shield TBM model test (축소 모형실험을 통한 토피조건별 이수압식 쉴드 TBM의 챔버압 및 이수분출 가능성 평가)

  • Koh, Sungyil;Shin, Hyunkang;La, You-Sung;Jung, Hyuksang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.3
    • /
    • pp.277-291
    • /
    • 2020
  • Shield TBM is a tunnelling method that has a wider range of applications in the poor ground condition compared to conventional tunnels (Drill and Blast). Currently, a 13.3 m large-diameter slurry shield TBM is preparing for construction to pass under the Han River. Shield TBM is divided into slurry and EPB shield TBM, and management items during construction are different depending on each characteristic. In this paper, the equipment type, origin, application case and trouble case were analyzed for slurry shield TBM, which is mainly constructed in soft ground. In addition, 2D and 3D model tests were conducted on the condition of soil depth for the possibility of slurry leakage into front of the equipment, with appropriate chamber pressure. Based on this paper, it proposed to provide basic and reference data for proper excavation surface pressure and chamber pressure during construction of slurry shield TBM under soft ground conditions, and proposed measures to minimize stability and environmental decline due to slurry ejection.

The Methodology of Determination of the Allotment Ratio in Maintenance Cost on the Multi-Purpose Steel Bridge (복합이용 강교량의 유지관리비 분담비율 결정을 위한 방법)

  • Kim, Kyoung Nam;Lee, Seong Haeng;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.6
    • /
    • pp.747-758
    • /
    • 2006
  • With the growth of economy, the esthetic values of bridges become significant points in the decision process of a type of new bridges. So, it is common that a long-span bridge or a multi-purpose bridge are selected as the type of new bridges. Also, the economic growth derives increase in traffic and then the increased traffic derives multi purpose bridges from the decision process of bridge types. In the multi-purpose bridges with private fund, the construction cost is simply alloted to several organizations according to the percentage of participation and usage. But the allotment of the maintenance cost is not simple. Because the loads and safety factors in design are different between the criterion of design of highway bridges and that of railway bridges. In this study, we verify the possible problems in case of allotment method of maintenance cost in foreign examples as well as domestic example. As one of the method of determination of allotment ratio in maintenance cost, the method based on the stress of structural analysis is presented and it can be an example in the similar problem later.

Accident Risk Consequences Analysis for Operating a Hydrogen Refueling Station in Urban Railway Site (도심 내 철도부지 수소충전소 운영을 위한 사고 위험 영향 분석)

  • Jae Yong Lee;Deokkyu Youn;Chul-Ho Lee;Jaeyoung Lee
    • Journal of the Korean Institute of Gas
    • /
    • v.27 no.4
    • /
    • pp.70-77
    • /
    • 2023
  • In response to climate change, each country is proposing a goal to reduce greenhouse gases in its energy supply and demand plan, and the use of hydrogen gas is a topic that is always prioritized as an energy resource for implementation. A popular way to use this hydrogen gas is the use of hydrogen fuel cell vehicles, and expansion of hydrogen charging stations is essential for using these hydrogen fuel cell vehicles. However, there are several limitations to the expansion of hydrogen refueling stations, the most representative of which is resident acceptance. Most of the hydrogen charging stations currently built in Korea are located in the outskirts with low population density, so the inconvenience to hydrogen fuel cell vehicle users has not been resolved, and as a result, there has been no progress in the spread of hydrogen fuel cell vehicles. In this paper, we analyzed the consequences of accident damage to determine the risks of constructing a hydrogen charging station on a railroad site frequently used by citizens. The target hydrogen charging station site was a railroad depot in Busan, and there are trains, national highways, and commercial facilities around this site. Assuming the worst-case scenario, we would like to consider the safety of the hydrogen refueling station site by analyzing the area affected by the accident and its consequence.