• Title/Summary/Keyword: railway engineering

Search Result 2,444, Processing Time 0.026 seconds

Considerations of emission noise standard for railway vehicles (철도차량 방사소음 기준에 대한 국외동향 고찰)

  • Cho, Jun-Ho;Koh, Hyo-In;You, Won-Hee;Kim, Jae-Chul;Koo, Dong-Hoe
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.529-533
    • /
    • 2008
  • Recently in Korea, noise is one of the most important social issues because the living standard becomes more higher. Railway noise is also annoying one in our society, although railway has very positive role in our country. The major measures for mitigation of railway noise in Korea are rail welding and installation of noise barrier on the noisy area. But these measures have its own limit for the calm and comfortable living environment. In Europe the railway noise problem has been treated more systematically and aggressively, there has been emission noise standard for Trans-European rail network. In this paper, the trend of noise standard for railway vehicles will be reported and the check point for our country will be discussed.

  • PDF

Parametric Study on Rail and Bridge Interaction (레일과 교량의 상호작용 매개변수 분석 연구)

  • Kim, Jong-Min;Han, Sang-Yun;Lim, Nam-Hyoung;Kim, Jung-Hun;Kang, Young-Jong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.445-450
    • /
    • 2007
  • CWR(Continuous Welded Rail) and bridge interaction produce rail force, bridge displacement and rail/bridge relative displacement. Each of these has limitation by many codes. In this paper, analysis of interaction has been carried out by using foreign codes(UIC 774-3 R code of Europe etc.) because there is no code about interaction between rail and bridge in Korea. Recently, railway bridges with CWR has been constructed for structural and economical reasons. When designer plans railway bridges, design a bridge model first and then investigate railway forces and displacement by interaction analysis. If these results go out bounds from limitation, designer plans railway bridges again and again. In this paper, using the parametric study on CWR and railway bridge interaction, railway bridge parameters such as length of bridge span, area of bridge, moment of inertia, stiffness of pier, etc. are presented. It helps preliminary design of railway bridges.

  • PDF

A study on the statistical analysis and implications cases of obtaining international safety certification in safety critical railway products (안전성 중시 철도제품의 국제인증 획득 사례를 통한 통계적 분석 및 시사점에 관한 연구)

  • Choi, Yo Chul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.2
    • /
    • pp.114-121
    • /
    • 2021
  • Today, it is a time when self-help efforts are being made to increase the demand for international certification by domestic and foreign railway orderers and develop excellent railway systems for railway system and railway construction projects. Since 2011, cases of obtaining international certification related to the domestic railway system/products have been collected and analyzed through literature and Internet data and based on the analysis results, evaluation results on the acquisition of international certification in Korea are presented. Through these results, the government, research institutes, and industries will be practical reference materials for international certification-related work.

A Case study of the requirement verification model development for High Speed Railway Systems (고속철도시스템 요구사항 검증 모델 개발 사례)

  • Jeong, Jae-Deok;Lee, Jae-Cheon;Kim, Chan-Muk;Yun, Jae-Han;Wang, Jong-Bae;Choe, Yo-Cheol
    • 시스템엔지니어링워크숍
    • /
    • s.6
    • /
    • pp.126-129
    • /
    • 2005
  • Systems engineering requirement verification model developmetn for High Speed Railway systems in progress is a national large system development program that is not only large-size and complex but also multi-disciplinary in nature. For the High Speed Railway TEP development, verification requirements that could verify system function, performance, and constraint, should be derived from SSS(system Segment specification). Hereafter, this could be referred to as verification requirements. System engineering process establishes traceability between verification requirements and system requirements. These tasks could be accomplished by the schema. using computer-aided Systems Engineering tool(CORE), High Speed Railway program can become a database and other system related to High Speed Railway program will be developed effectively and efficiently.

  • PDF

Mapping vertical bridge deformations to track geometry for high-speed railway

  • Gou, Hongye;Ran, Zhiwen;Yang, Longcheng;Bao, Yi;Pu, Qianhui
    • Steel and Composite Structures
    • /
    • v.32 no.4
    • /
    • pp.467-478
    • /
    • 2019
  • Running safety and ride comfort of high speed railway largely depend on the track geometry that is dependent on the bridge deformation. This study presents a theoretical study on mapping the bridge vertical deformations to the change of track geometry. Analytical formulae are derived through the theoretical analysis to quantify the track geometry change, and validated against the finite element analysis and experimental data. Based on the theoretical formulae, parametric studies are conducted to evaluate the effects of key parameters on the track geometry of a high speed railway. The results show that the derived formulae provide reasonable prediction of the track geometry change under various bridge vertical deformations. The rail deflection increases with the magnitude of bridge pier settlement and vertical girder fault. Increasing the stiffness of the fasteners or mortar layer tends to cause a steep rail deformation curve, which is undesired for the running safety and ride comfort of high-speed railway.

RAMS evaluation for a steel-truss arch high-speed railway bridge based on SHM system

  • Zhao, Han-Wei;Ding, You-Liang;Geng, Fang-Fang;Li, Ai-Qun
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.1
    • /
    • pp.79-92
    • /
    • 2018
  • The evaluation theory of reliability, availability, maintainability and safety (RAMS) as a mature theory of state evaluation in the railway engineering, can be well used to the evaluation, management, and maintenance of complicated structure like the long-span bridge structures on the high-speed railway. Taking a typical steel-truss arch bridge on the Beijing-Shanghai high-speed railway, the Nanjing Dashengguan Yangtze River Bridge, this paper developed a new method of state evaluation for the existing steel-truss arch high-speed railway bridge. The evaluation framework of serving state for the bridge structure is presented based on the RAMS theory. According to the failure-risk, safety/availability, maintenance of bridge members, the state evaluation method of each monitoring item is presented. The weights of the performance items and the monitoring items in all evaluation levels are obtained using the analytic hierarchy process. Finally, the comprehensive serving state of bridge structure is hierarchical evaluated.

The influence of convoy loading on the optimized topology of railway bridges

  • Jansseune, Arne;De Corte, Wouter
    • Structural Engineering and Mechanics
    • /
    • v.64 no.1
    • /
    • pp.45-58
    • /
    • 2017
  • This paper presents the application of topology optimization as a design tool for a steel railway bridge. The choice of a steel railway bridge is dictated by the particular situation that it is suitable for topology optimization design. On the one hand, the current manufacturing techniques for steel structures (additive manufacturing techniques not included) are highly appropriate for material optimization and weight reduction to improve the overall structural efficiency, improve production efficiency, and reduce costs. On the other hand, the design of a railway bridge, especially at higher speeds, is dominated by minimizing the deformations, this being the basic principle of compliance optimization. However, a classical strategy of topology optimization considers typically only one or a very limited number of load cases, while the design of a steel railway bridge is characterized by relatively concentrated convoy loads, which may be present or absent at any location of the structure. The paper demonstrates the applicability of considering multiple load configurations during topology optimization and proves that a different and better optimal layout is obtained than the one from the classical strategy.

Study on seismic strengthening of railway bridge pier with CFRP and concrete jackets

  • Ding, Mingbo;Chen, Xingchong;Zhang, Xiyin;Liu, Zhengnan;Lu, Jinghua
    • Earthquakes and Structures
    • /
    • v.15 no.3
    • /
    • pp.275-283
    • /
    • 2018
  • Seismic strengthening is essential for existing bridge piers which are deficient to resist the earthquake. The concrete and CFRP jackets with a bottom-anchoring method are used to strengthen railway bridge piers with low reinforcement ratio. Quasi-static tests of scaled down model piers are performed to evaluate the seismic performance of the original and strengthened bridge pier. The fracture characteristics indicate that the vulnerable position of the railway bridge pier with low reinforcement ratio during earthquake is the pier-footing region and shows flexural failure mode. The force-displacement relationships show that the two strengthening techniques using CFRP and concrete jackets can both provide a significant improvement in load-carrying capacity for railway bridge piers with low reinforcement ratio. It is clear that the bottom-anchoring method by using planted steel bars can guarantee the CFRP and concrete jackets to work jointly with original concrete piers Furthermore, it can be found that the use of CFRP jacket offers advantages over concrete jacket in improving the energy dissipation capacity under lateral cyclic loading. Therefore, the seismic strengthening techniques by the use of CFRP and concrete jackets provide alternative choices for the large numbers of existing railway bridge piers with low reinforcement ratio in China.

Watt-Hour Metering Characteristics at Scott Transformer in AC Electric Railway Systems

  • Lee, Hansang;Lee, Kyebyung;Kim, Kisuk;Park, Yong-Up;Jeon, Young-Soo;Joo, Sung-Kwan;Jang, Gilsoo;Park, Chang-Hyun
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.3
    • /
    • pp.1398-1406
    • /
    • 2018
  • Owing to the consistent increase in accurate analysis issue for energy consumption of the AC electric railway systems, there is controversy about the adequacy of the present watt-hour metering configuration. Due to the unusual load characteristics and facilities, the discussions have not been active. Therefore, in order to achieve more accurate watt-hour metering for AC electric railway system, this paper proposes numerical formulas for watt-hour metering that reflects the highly-varying characteristics of the railway load and the structural characteristics of the Scott transformer. The proposed formulas have been verified by comparison with site-measured data, and a more suitable metering configuration for AC railway system has been proposed.

Random vibration analysis of train-slab track-bridge coupling system under earthquakes

  • Zeng, Zhi-Ping;He, Xian-Feng;Zhao, Yan-Gang;Yu, Zhi-Wu;Chen, Ling-Kun;Xu, Wen-Tao;Lou, Ping
    • Structural Engineering and Mechanics
    • /
    • v.54 no.5
    • /
    • pp.1017-1044
    • /
    • 2015
  • This study aimed to investigate the random vibration characteristic of train-slab track-bridge interaction system subjected to both track irregularities and earthquakes by use of pseudo-excitation method (PEM). Each vehicle subsystem was modeled by multibody dynamics. A three-dimensional rail-slab- girder-pier finite element model was created to simulate slab track and bridge subsystem. The equations of motion for the entire system were established based on the constraint condition of no jump between wheel and rail. The random load vectors of equations of motion were formulated by transforming track irregularities and seismic accelerations into a series of deterministic pseudo-excitations according to their respective power spectral density (PSD) functions by means of PEM. The time-dependent PSDs of random vibration responses of the system were obtained by step-by-step integration method, and the corresponding extreme values were estimated based on the first-passage failure criterion. As a case study, an ICE3 high-speed train passing a fifteen-span simply supported girder bridge simultaneously excited by track irregularities and earthquakes is presented. The evaluated extreme values and the PSD characteristic of the random vibration responses of bridge and train are analyzed, and the influences of train speed and track irregularities (without earthquakes) on the random vibration characteristic of bridge and train are discussed.