• Title/Summary/Keyword: rails

Search Result 427, Processing Time 0.032 seconds

Effect of lateral differential settlement of high-speed railway subgrade on dynamic response of vehicle-track coupling systems

  • Zhang, Keping;Zhang, Xiaohui;Zhou, Shunhua
    • Structural Engineering and Mechanics
    • /
    • v.80 no.5
    • /
    • pp.491-501
    • /
    • 2021
  • A difference in subgrade settlement between two rails of a track manifests as lateral differential subgrade settlement. This settlement causes unsteadiness in the motion of trains passing through the corresponding area. To illustrate the effect of lateral differential subgrade settlement on the dynamic response of a vehicle-track coupling system, a three-dimensional vehicle-track-subgrade coupling model was formulated by combining the vehicle-track dynamics theory and the finite element method. The wheel/rail force, car body acceleration, and derailment factor are chosen as evaluation indices of the system dynamic response. The effects of the amplitude and wavelength of lateral differential subgrade settlement as well as the driving speed of the vehicle are analyzed. The study reveals the following: The dynamic responses of the vehicle-track system generally increase linearly with the driving speed when the train passes through a lateral subgrade settlement area. The wheel/rail force acting on a rail with a large settlement exceeds that on a rail with a small settlement. The dynamic responses of the vehicle-track system increase with the amplitude of the lateral differential subgrade settlement. For a 250-km/h train speed, the proposed maximum amplitude for a lateral differential settlement with a wavelength of 20 m is 10 mm. The dynamic responses of the vehicle-track system decrease with an increase in the wavelength of the lateral differential subgrade settlement. To achieve a good operation quality of a train at a 250-km/h driving speed, the wavelength of a lateral differential subgrade settlement with an amplitude of 20 mm should not be less than 15 m. Monitoring lateral differential settlements should be given more emphasis in routine high-speed railway maintenance and repairs.

Delay and Doppler Profiler based Channel Transfer Function Estimation for 2×2 MIMO Receivers in 5G System Targeting a 500km/h Linear Motor Car

  • Suguru Kuniyoshi;Rie Saotome;Shiho Oshiro;Tomohisa Wada
    • International Journal of Computer Science & Network Security
    • /
    • v.23 no.9
    • /
    • pp.8-16
    • /
    • 2023
  • In Japan, high-speed ground transportation service using linear motors at speeds of 500 km/h is scheduled to begin in 2027. To accommodate 5G services in trains, a subcarrier spacing frequency of 30 kHz will be used instead of the typical 15 kHz subcarrier spacing to mitigate Doppler effects in such high-speed transport. Furthermore, to increase the cell size of the 5G mobile system, multiple base station antennas will transmit identical downlink (DL) signals to form an expanded cell size along the train rails. In this situation, the forward and backward antenna signals are Doppler-shifted in opposite directions, respectively, so the receiver in the train may suffer from estimating the exact Channel Transfer Function (CTF) for demodulation. In a previously published paper, we proposed a channel estimator based on Delay and Doppler Profiler (DDP) in a 5G SISO (Single Input Single Output) environment and successfully implemented it in a signal processing simulation system. In this paper, we extend it to 2×2 MIMO (Multiple Input Multiple Output) with spatial multiplexing environment and confirm that the delay and DDP based channel estimator is also effective in 2×2 MIMO environment. Its simulation performance is compared with that of a conventional time-domain linear interpolation estimator. The simulation results show that in a 2×2 MIMO environment, the conventional channel estimator can barely achieve QPSK modulation at speeds below 100 km/h and has poor CNR performance versus SISO. The performance degradation of CNR against DDP SISO is only 6dB to 7dB. And even under severe channel conditions such as 500km/h and 8-path inverse Doppler shift environment, the error rate can be reduced by combining the error with LDPC to reduce the error rate and improve the performance in 2×2 MIMO. QPSK modulation scheme in 2×2 MIMO can be used under severe channel conditions such as 500 km/h and 8-path inverse Doppler shift environment.

Evaluation of Rail Surface Defects Considering Vehicle Running Characteristics (열차주행특성을 고려한 레일표면결함 분석)

  • Jung-Youl Choi
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.3
    • /
    • pp.845-849
    • /
    • 2024
  • Currently, rail surface defects are increasing due to the aging of urban railway rails, but in the detailed guidelines for track performance evaluation established by the country, rail surface damage is inspected with the naked eye of an engineer and with simple measuring tools. It is very important to discover defects in the rail surface through periodic track tours and visual inspection. However, evaluating the severity of defects on the rail surface based on the subjective judgment of the inspector has significant limitations in predicting damage inside the rail. In this study, the characteristics of cracks inside the rail due to rail surface damage were studied. In field measurements, rail surface damage was selected, old rail samples were collected in the acceleration and braking sections, and a scanning electron microscope (SEM) was used to evaluate the rail surface damage was used to analyze the crack characteristics. As a result of the analysis, the crack mechanism caused by the running train and the crack characteristics of the acceleration section where cracks occur at an angle rising toward the rail surface were experimentally proven.

A Historical and Archaeological Study on Gabong Taesil of King Dangjong in Joseon (조선 단종의 가봉태실에 대한 문헌·고고학적 검토)

  • Shim, Hyun Yong
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.3
    • /
    • pp.80-99
    • /
    • 2012
  • It is known that there are two Gabong taesil (shrine for King's umbilical cord) of King Danjong, the 6th king of Joseon, remaining today. One of them is Mt. Sogok in Sacheon-city, Gyeongsangnam-do and the other is Mt. Beomnim in Seongju-gun, Gyeongsangbuk-do. The academic sector argued about this matter as there cannot be two Gabong taesil for one king. I once argued that Taesil on Mt. Beomnim in Seongju is King Danjong's Gabong taesil and Danjong taesil in Sacheon is the one for Prince Inseongdaegun, the eldest son of King Yejong. At that time, however, I had not examined the archaeological relics found in these places. In result of making an archaeological approach, I have come to the following conclusions :1. King Danjong had two Taesil : Agi taesil(shrine for baby's umbilical cord) and Gabong taesil. The first Agi taesil was created on Taebong of Mt. Seonseok in Seongju on November 26, 1441, but was moved to Mt. Beomnim in Seongju in 1451 to form the second Agi taesil. In 1458, King Sejo eliminated his Taesil. The stone structures of Gabong taesil still remains on Taebong of Mt. Beomnim, so it has been assumed that King Danjong established them during his reign (1452-1455). 2. Taesil in Sacheon has been known as King Danjong's Taesil because of King Danjong's reinstatement during the reign of King Sukjong. His Taesil was repaired with the reinstatement and King Sukjong was mistaken that Taesil in Sacheon was King Danjong's Taesil to fix it. The time of restoration has been assumed to be soon after the restoration of King Danjong's tomb (1699-1719). Taesil is missing the book of records and rails around the stone structure because the tombs of reinstated kings were restored without rails. 3. It is incorrect that Taesil in Sacheon was known as King Danjong's Taesil, It has been concluded that this Taesil was for Prince Inseongdaegun who was born in 1462. I focused on the fact that Prince Inseongdaegun's Taesil was in Seosamneung Taesil instead of King Danjong's Taesil. When Yiwangjik stored King Danjong's Taesil in Seoul in 1928 and moved it to Seosamneung in 1930, he found that the epitaph on the tombstone recorded that it was Prince Inseongdaegun, not King Danjong, and created Prince Inseongdaegun's Taesil in Seosamneung. I referred to "Taebong", which was created when Seosamneung Taesil was built during the Japanese imperial rule over Joseon, and the relics found in Taesil in Sacheon and Seosamneung.

The Fatigue Life Evaluation of Continuous Welded Rail on a Concrete Track in an Urban Railway (도시철도 콘크리트궤도 장대레일의 피로수명 평가)

  • Kong, Sung-Yong;Sung, Deok-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.3
    • /
    • pp.193-200
    • /
    • 2014
  • In this study, fatigue tests on existing continuous welded rail (CWR) on a concrete track were carried out. Based on the test results, a S-N curve expressing the remaining life of the CWR at a fracture probability of 50% was obtained using weighted probit analysis suitable for small-sample fatigue data sets. As rails had different histories in terms of accumulated passing tonnage, the test data were corrected to average out the accumulated passing tonnage. The remaining service life for the CWR on the concrete track in an urban railway was estimated using the prediction equation for the bending stress of rail developed in the past to estimate rail base bending stress and taking the surface irregularities into consideration. Estimating the remaining service life of the CWR in an urban railway showed that the rail replacement period could be extended over 200MGT. In addition, comparing the concrete track to the ballast track, the fatigue life of rail was analyzed as approximately 300MGT higher than. Therefore, the rail replacement criteria needs to distinguish between the ballast track and the concrete track, and not the criteria needs to be changed as a target for the maintenance, although it is necessary to remove longitudinal rail surface irregularities at welds by grinding.

A Study On the Effect of Newly-Established Inland Logistics Centers In the Capital Area (수도권 내륙화물기지 신설에 따른 효과 분석)

  • Jang, Jun-Seok;Lee, Jun;Park, Jae-Hyun;Song, Min-Ho;Kwon, Yong-Jang
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.453-460
    • /
    • 2011
  • The inland logistics center is a large scale of logistics facility that enables roads, rails, ports, and airports to carry out chained-transports and combined-transports, and the logistics center are established at the main logistics posts in order to reduce the cost of transport by mass transportation. However, it is expected that the capacity of Euiwang ICD, the only inland logistics centers in the capital area, will reach its limit before 2015, so it is required to establish another stations or to improve the existing facility. Especially, in case of Euiwang ICD, the expansion of the center is not possible because of its position, so it is required to establish new logistics centers in other places in order to raise the capacity of transport. Therefore, this study suggests to establish new metropolitan logistics centers on the western coast line in order to solve the problem of shortage of tract capacity that is brought on by the newly established inland logistics centers on the axis of the western coastline (Song-san Station and An-jung Station), and analyzes how the new logistics center will distribute railroad cargoes. By these, this study contributes to reduce the cost of transport by providing smooth railroad transport service.

  • PDF

Experimental Study on Position Control System Using Encoderless Magnetic Motion (엔코더리스 마그넷 모션을 이용한 위치제어에 대한 리니어모터 실험적 연구)

  • Kim, Hong-youn;Yun, Young-Min;Shim, Ho-Keun;Kwon, Young-Mok;Heo, Hoon
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.40 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • A position control system composed of the PMLSM(Permanent Magnet Linear Synchronous Motor), unlike conventional linear permanent magnet synchronous motor is fixed to the permanent magnet moving coil rails (permanent magnet = stator, coil = mover), the coil is fixed, moving the permanent magnet, we propose a position control system (permanent magnet = mover, coil = stator) structure. Position is measured not using conventional encoder or resolver but by adopting vector control method using 2 hall sensors generating rectangular signal. This method estimate the velocity and position of mover by using the quadruple of two hall sensor signal instead of encoder signal. Vector control of PMLSM using 2 hall sensor generating rectangular wave is proved to control the system stable and efficiently through simulation. Also hardware experiment reveals that the position control performance is measured within the range of $30{\sim}50{\mu}m$ in the accuracy of $10{\sim}20{\mu}m$, which is improved twice to the conventional method. The proposed method exhibits its economical efficiency and practical usefulness. The vector control technique using two hall sensors can be installed in narrow place, accordingly it can be implemented on the system where the conventional encoder or resolver cannot operate.

Intelligent Railway Detection Algorithm Fusing Image Processing and Deep Learning for the Prevent of Unusual Events (철도 궤도의 이상상황 예방을 위한 영상처리와 딥러닝을 융합한 지능형 철도 레일 탐지 알고리즘)

  • Jung, Ju-ho;Kim, Da-hyeon;Kim, Chul-su;Oh, Ryum-duck;Ahn, Jun-ho
    • Journal of Internet Computing and Services
    • /
    • v.21 no.4
    • /
    • pp.109-116
    • /
    • 2020
  • With the advent of high-speed railways, railways are one of the most frequently used means of transportation at home and abroad. In addition, in terms of environment, carbon dioxide emissions are lower and energy efficiency is higher than other transportation. As the interest in railways increases, the issue related to railway safety is one of the important concerns. Among them, visual abnormalities occur when various obstacles such as animals and people suddenly appear in front of the railroad. To prevent these accidents, detecting rail tracks is one of the areas that must basically be detected. Images can be collected through cameras installed on railways, and the method of detecting railway rails has a traditional method and a method using deep learning algorithm. The traditional method is difficult to detect accurately due to the various noise around the rail, and using the deep learning algorithm, it can detect accurately, and it combines the two algorithms to detect the exact rail. The proposed algorithm determines the accuracy of railway rail detection based on the data collected.

Diurnal Variation of the Dust Concentration in a Railway Tunnel (도시철도 터널 내 부유먼지의 일변화 특징)

  • Woo, Sang Hee;Kim, Jong Bum;Hwang, Moon Se;Tahk, Gil-Hyun;Yoon, Hwa Hyeon;Yook, Se-Jin;Bae, Gwi-Nam
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.280-287
    • /
    • 2016
  • In railway tunnels, dust is generated when trains run due to the contact between the wheels and the rails. The generated dust is suspended due to the train-induced airflow, with some of it deposited due to gravitational sedimentation. In this study, the diurnal variation of the dust concentration was investigated in a railway tunnel. A single lane of a tunnel was selected in which to observe more easily the dust concentration due to the passing of a train. Four particle-measuring instruments were utilized to detect dust ranging from 5nm to $20{\mu}m$. To synchronize the train passing time at the measuring location, a three-dimensional ultrasonic anemometer and a video camera were used. It was found that the dust concentration was significantly increased from $50{\mu}g/m^3$ to $150{\mu}g/m^3$ due to the train. Particularly, the dust concentration was greatly increased to more than $250{\mu}g/m^3$ during the morning rush-hour times.

The Effect and Countermeasures of the Vertical Track Settlement Caused by Expand and Contract Behavior of the High-Speed Railway Bridge Girder (고속철도 교량 바닥판의 온도신축작용이 궤도처짐에 미치는 영향과 대책에 관한 연구)

  • Kang, Kee Dong
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.6 s.79
    • /
    • pp.673-679
    • /
    • 2005
  • According to continuous welded rails on a bridge, temperature changes bring about the expansion of the bridge deck,adding axial forces on the track. Moreover, the ballast on the bridge deck expansion joint is moved due to the bridge deck. The longer the bridge deck is, the greater the influence will be, loosening the ballast, causing track irregularities, and deteriorating passenger comfort. Considering the structure of the bridge itself and tolerance for track irregularities caused by the loosened ballast on the bridge, the maximum length of the deck should be less than 80 m, which is the same as the standard of French railways. In this study, the interaction between the expansion related to the bridge length and the irregularity in the longitudinal level, referring to measurements and maintenance work performed in high-speed railways, was analyzed. This research shows that the installation of a sliding plate or a vertical ballast stopper is not a good option, since it is difficult. On the other hand, the installation of a ZLR fastener or gluing is easy, but its influence is insignificant. In conclusion, switch tie tamping or manual tamping is more effective than other methods of what?