• Title/Summary/Keyword: railroad construction

Search Result 646, Processing Time 0.038 seconds

A Study on Survey Procedures and Method Applications for Advancing the Railroad Design-Based Data (철도설계 기반데이터의 고도화를 위한 측량절차 및 방법적용에 관한 연구)

  • Moon, Jae-Woo;Lee, Tae-Gyun;Ko, Dae-Hyeob;Han, Chun-Deuk
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.343-352
    • /
    • 2011
  • For optimizing railroad designs, setting up shape and specifications of facilities harmonized and coincide with local topography based on absolute location information, correct construction quantity's output and proper land's security etc are key matters, and also clear and advanced surveying standards and technical provision shall become priority so as to satisfy them. Therefore, this study analyzed and researched on surveying standards and technical provision's status in current railroad design's cases, and then attempts to suggest establishment of design surveying standard, procedures, and methods together with its practical scheme.

  • PDF

A Study on Isolation of Mixed Heavy Metal-Contaminated Soil and the Waste in Railroad Workshop (철도 정비창의 폐기물과 혼합된 중금속 오염토 분리에 관한 연구)

  • Son, Woohwa;Lee, Seungho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.59-66
    • /
    • 2012
  • In this study, it was sampling from heavy metal-contaminated soil with the waste in railroad workshop. And, the pollution concentration and analysis of particle-size distribution were conducted to design efficient purification process that it was aimed at high contaminated area, low contaminated area and samples containing waste foundry sand. But, it was the other signs of general soil contamination, as construction waste of waste concrete and waste wood, waste foundry sand, incinerator ash, etc is overall buried on the grounds. Thus, the common heavy metal purification technology has not decreased the pollution. However, heavy-metal contamination was reduced by magnetic separation utilizing the magnetic component of the mixed waste.

The Study of Efficiency of Train Control System Using Communication

  • Baek, Jong-Hyen;Kim, Yong-Kyu
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.107-109
    • /
    • 2004
  • Assuming that life of urban transit signaling is about 20 years with the flow of technology development, Seoul urban transit will be required to prepare for improvement soon. The highly developed countries preceding several levels rather than Korea are faced with commercial service, which uses RF, ATC and ATO in Train Control System. European highly developed countries in the field of railroad have been progressing standardization and technology development of signaling associated with related manufacturers for direct operation between nations. For that, a effective train control system with radio beyond control levels by the existing wayside-onboard communication is in a developed and used stage. The systems, which advanced countries have been progressing, seem to be applied to domestic within 5 years from now. At present, there are no countries using CBTC for service throughout the world. So, this is investigated to focus on the routes ready to be installed with completed CBTC and trying to introduce the technology. Especially, considerations for economic aspect are mainly reviewed about controlling ability of headway, flexibility, extension aspect and construction cost on the basis of paper examined in NYCT.

  • PDF

Characteristic Analysis of Superconducting LSM for the Wheel-rail-guided Very High Speed Train according to Winding Method of the Ground 3-phase Coils (휠-레일 방식 초고속열차용 초전도 선형동기전동기의 지상권선 방식별 특성 분석)

  • Park, Chan-Bae;Lee, Byung-Song;Lee, Chang-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.8
    • /
    • pp.1164-1169
    • /
    • 2014
  • Recently, an interest in a hybrid system combining only the merits of the conventional wheel-rail system and Maglev propulsion system is growing as an alternative to high-speed maglev train. This hybrid-type system is based on wheel-rail method, but it enables to overcome the speed limitation by adhesion because it is operated by a non-contact method using a linear motor as a propulsion system and reduce the overall construction costs by its compatibility with the conventional railway systems. Therefore, the design and characteristic analysis of a coreless-type superconducting Linear Synchronous Motor (LSM) for 600km/h very high speed railway system are conducted in this paper. The designed coreless-type superconducting LSMs are the distributed winding model, the concentrated 1 layer winding model and the concentrated 2 layer winding model, respectively. In addition, the characteristic comparison studies on each LSM are conducted.

Measurement and Analysis of Ground Borne Vibrations Resulting from Railroad Operation (열차 주행에 의한 지반진동의 계측 및 분석)

  • 목영진
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.06a
    • /
    • pp.15-54
    • /
    • 1993
  • Ground Vibrations were measured at one location near the railroad track at a site about 3.2 kilometers north of Chapel Hill, Tennessee, U.S.A., Measurements were made during the passage of 18 freight trains over the six-day period. The objective of this study was to evaluate ground vibration levels from train and other traffic at possible construction depths for the Superconducting Super Collider(SSC), The criterion with which the vibration levels are compared is the more stringent one : that is, 0, 0005 inchs(about 0.0127 m) at 3H2, The measurements show conclusively that vibration levels generated by railroad traffic in the rock at the depth of 100 it (30m) or more are at least 10 times smaller than the criterion.

  • PDF

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

A Study on Construction Contractors in Daegu During the Japanese Colonial Rule (일제강점기 대구의 토목건축청부업자에 관한 연구)

  • Lee, Jin-Hyun
    • Journal of architectural history
    • /
    • v.19 no.6
    • /
    • pp.173-186
    • /
    • 2010
  • This article is about the study on construction contractors in Daegu during the Japanese Colonial Rule. The first construction contractors who involved with Kyong-bu railroad work in 1904 personally. But, after they go through the bidding method, changed by the Japanese Government General of Korea in 1922, and the second bid rigging in 1932, contractors was changed gradually the organization into unlimited partnership, limited partnership or stock corporation. The number of them was increased. Most contractors were Japanese, and organized a limited partnership which has been capitalized at 30,000 won. On the other hand, Korean contractors couldn't work at an important part, except for the personal activities of Youngsil Lee(李永實). They were usually employed as consultants or field deputies by Japanese contractors. After the Liberation, Japanese construction contractors returned to Japan, however Tatuoka-kumi(龍岡組), Yasiro-kumi(屋代組) and Sakano-kumi(坂野組) that was leading the business which were took over by Koreans. They were leading architecture field in Daegu.

The Study for execution procedural to apply CBTC(Communication Based Train Control) on the subway (통신을 이용한 열차제어시스템의 기존 도시철도 적용을 위한 시행절차연구)

  • Kim, You-Ho;Lee, Hoon-Koo;Lee, Soo-Hwan;Kim, Jong-Ki;Baek, Jong-Hyen
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.357-360
    • /
    • 2003
  • Improvement is required to solve problems depending on long term use of signal equipment in the existing city railroad and to raise quality of passenger services. Accordingly, for more efficient improvement, we examined the procedure of executing construction of the communication based train control system in Korean city railroads, which is globally studied. The procedure of executing construction of the system is to present a plan for construction first of ail and then to prepare a strategy for construction of the system. It is required to establish a procedure for execution in each step depending on the prepared strategy and then to establish a detailed execution plan. We studied such an execution procedure, divided the execution procedure for application of the train control system through five steps to prepare the execution procedure.

  • PDF

The Improvement Plan on Fare and Ticketing System of Seoul Metropolitan Subway Considering Construction and Operational Costs (건설.운영비를 고려한 수도권 전철의 운임체계 및 승차권제도 개선방안)

  • Lee, Tai-Sik;Ryu, Jong-Won;Chung, Chul;Lee, Dong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.327-336
    • /
    • 2007
  • Operation a subway company requires high amount of early construction, operation and maintenance costs. Seoul Metro, one of the public subway companies in Seoul, Korea, has undergone operational deficit from its establishment, and the main reason is that the early construction and operation cost exceed the total revenue. Therefore, detailed researches on current operation system and possible alternatives are conducted to settle down finance trouble of the company. In particular, problems on operation and ticketing systems are analyzed, and based on that, necessity and detailed plan of railroad pass for one day are introduced and analyzed.

An Analysis on Economic Effects of Sectoral SOC Investment (부문별 사회간접자본(SOC)의 경제적 파급효과 분석)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.120-127
    • /
    • 2014
  • Currently Welfare is emphasized and the trend of SOC investment shows downwards slopping. The pattern of SOC investment also changes focusing on railroad as environmental issues are critical. This study analyzes and compares the effects of sectoral SOC investments based on Input-Output Tables published by BOK (Bank of Korea). The production inducement, value-added inducement, and employment inducement effects of each sector SOC, which consist of road, railroad, port, and airport, are investigated. First, in view production inducement, sectoral SOC investments have stronger economic effects than manufacture sector. The investment of port and road show the highest value-added inducement in construction process. The investment of road records the highest employment inducement in construction and operation process. The empirical ananlysis of regional economic effects, using Regional Input-Output Tables, supports these explanation showing almost same results. As synthesizing these results, the SOC stocks have to be invested consistently for long periods. Especially the road investment is inevitable for employment. Which sector of SOC is invested depends on circumstances. If government emphasizes production inducement, railroad is invested. If focuses on value-added inducement, port.