• Title/Summary/Keyword: railroad construction

Search Result 646, Processing Time 0.028 seconds

A study on the Multipurpose Usage of Incheon International Airport Railway - Focusing on the Improvement of Connecting Systems - (인천국제공항철도의 다목적 활용방안 - 연계체계 개선을 중심으로)

  • Park Jeong-Soo;Won Jai-Mu;Han Woo-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.610-616
    • /
    • 2005
  • The Incheon International Airport Express(I'Rex) is the railroad that connects Incheon International Airport, Gimpo Airport and Seoul Station. I'Rex is now under construction, and it will be connected to Gimpo Airport by 2007, to Seoul Station by 2010. However, there has been no discussion on how th connect different routes of railway Systems. Therefore it seems likely that rail passenger demand will be lower than that of limousine bus. Therefor, this paper proposes 4 effective connecting methods for I'Rex - (1) Shuttle transport, (2) Short-distance connecting transport (Inside I'Rex, Seoul Subway Line 9, 'Han-River line') (3) Mid-distance connecting transport (Jung-ang, Tae-baek, Young-dong line) (4) Long-distance connecting transport (Korean Train Express (Korean high speed railroad)) These methods can increase the connectivity of I'Rex with existing railroads and the competition power of I'Rex against a highway.

The Advanced Generic BOM for Urban Transit (개선된 Generic BOM의 도시철도차량 적용방안)

  • Ahn, Tae-Ki;Park, Kee-Jun;Chung, Jong-Duk
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1646-1648
    • /
    • 2005
  • This paper proposes the Advanced Generic BOM(AGBOM) which is more flexible BOM system than existing GBOM. The existing GBOM system has the limitation of Result BOM construction and selecting options by choosing only one Variant under given Cluster. In order to overcome this limitation, AGBOM can make more various Result BOM by selecting several Variants under given Cluster. Also, this paper describes UT-AGBOM which can use to rolling stock through constructing urban transit BOM using the proposed AGBOM. The last, this paper describes the various Result BOM examples constructed from Source BOM of UT-AGBOM, such as rolling-stock maintenance BOM, individual car BOM, etc.

  • PDF

Analysis of Shear Behavior of Shear Key for Concrete Track on Railway Bridge Considering Construction Joint (타설 경계면을 고려한 철도교 콘크리트궤도 전단키의 전단 거동 해석)

  • Lee, Seong-Cheol;Kang, Yun-Suk;Jang, Seung Yup
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.341-350
    • /
    • 2016
  • Concrete track on railway bridges should be designed to effectively respond to the movement of the superstructure of the bridge. In the design procedure, shear keys are generally placed on the protection concrete layer (PCL) before casting the concrete track so the shear force due to slip between the concrete track and the bridge super-structure can be transferred. In this paper, a nonlinear structural analysis procedure that considers the construction joint has been developed to predict the shear behavior of a shear key. With the developed analysis procedure, it was possible to predict the shear force-shear slip response at the construction joint in a shear key by considering the friction of concrete surface and the dowel action of the rebars. The analysis results showed good agreement with the test results for 4 specimens.

A Case Study on the Cause and Reinforcement of Railroad Facilities Settlement According to the Ground Excavation (지반굴착에 따른 철도시설물의 침하 원인 및 보강 사례연구)

  • Oh, Beyung-Sam
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.10
    • /
    • pp.85-94
    • /
    • 2012
  • Recent development trend of construction projects in the urban area is the efficient use of insufficient land, however caused to difficult construction conditions because of many adjacent structures. This paper presents the case study that analyzed the ground settlement of railroad structure for the double track railway project of Gyeongui line, adjacent to the high rise building under ground excavating for substructure work, considering interaction of soft ground characteristics. Field survey and measurement works were carried out during construction of station and excavation of high rise building, and field data were analyzed to find the source of settlement of platform and railway. In addition, the soil reinforcement and foundation restoration were performed using in-situ injection method, i.e., D-ROG(Digitalized Restoring On Grout) method which filled the pore of bottom and around of foundation with micro-cement.

Long-term Settlement of High Speed Railway Embankment Compacted under Dry/Wet Condition (고속철도 토공구간 쌓기 재료의 다짐함수비 조건에 따른 장기침하 특성)

  • Lee, Sung-Jin;Lee, Il-Wha;Lee, Jin-Uk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1268-1277
    • /
    • 2008
  • Recently, the high speed railway comes into the spotlight as the important and convenient traffic infrastructure. In Korea, Kyung-Bu high speed train service began in about 400km section at 2004, and the Ho-Nam high speed railway will be constructed by 2017. The high speed train will run with a design maximum speed of 300-350km/hr. Since the trains are operated at high speed, the differential settlement of subgrade under the rail is able to cause a fatal disaster. Therefore, the differential settlement of the embankment must be controlled with the greatest care. Furthermore, the characteristics and causes of settlements which occurred under construction and post-construction should be investigated. A considerable number of studies have been conducted on the settlement of the natural ground over the past several decades. But little attention has been given to the compression settlement of the embankment. The long-term settlement of compacted fills embankments is greatly influenced by the post-construction wetting. This is called 'hydro collapse' or 'wetting collapse'. This wetting collapse problem for the compressibility of compacted sands, gravels and rockfills, has been recognized by several researchers. For this wetting settlement problem, we showed the test results carried out with 4 fill materials. These tests were performed under the condition that the fill materials were inundated at the first wetting. Subsequently, in this study, we investigated the long-term settlement characteristics of the fill materials under the repeated partial wetting and rising of the ground water table happend by rainfall.

  • PDF

Performance Assessment of 3D Printed Mechanically Stabilized Earth Retaining Wall Backfilled with Recycling Soil (3D 프린팅 기술 기반 보강토 옹벽 순환토사 적용 뒤채움재의 성능 평가)

  • Kim, Jae-Hwan;Oh, Jeongho
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.2
    • /
    • pp.81-93
    • /
    • 2024
  • In Korea, numerous large-scale infrastructure construction projects and housing site developments are being undertaken. However, due to limited land availability, sourcing high-quality backfill materials that meet the standards for railroad and road embankment compaction and mechanically stabilized earth (MSE) retaining wall construction poses significant challenges. Concurrently, there has been an increase in structural failures of many MSE retaining walls, attributed primarily to reduced bearing capacity and impaired drainage performance, resulting from inadequate backfill compaction. This study aimed to analyze the structural performance and safety of an MSE retaining wall using recycled soil as backfill. We conducted small-scale model tests utilizing 3D printing technology combined with two-dimensional numerical analysis. The study quantitatively evaluated the MSE retaining wall's performance concerning the recycled soil mixing ratio and reinforcement installation methods. Furthermore, the utility of 3D printing was confirmed through the production of an experimental wall designed to facilitate easy reinforcement attachment, mirroring the conditions of actual MSE retaining wall construction.

A Study On The Construction Methods In PSC Rail Beams (PSC 궤도빔의 가설공법에 대한 검토)

  • Ahn, Yong-Mo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1293-1299
    • /
    • 2010
  • Daegu urban railroad line 3 is introduced with straddle-type monorail system within the country at the first time. This system is long line with 24km in total length which has not the results of construction in Korea. The rail beam of monorail bridge to be constructed/ installed in the city is adopted on the basis of the PSC rail beam. It is required to apply the steel rail beam at rapid/ curved line parts or location to be required the long span bridge as passing river and intersection. The composition of span bridge is various and the height of bridge is change with each section and exist the different curve radius due to all section is passes in the city. The rail beam shall be considered the ground conditions and then consider the construction methods. It is analyzed to construction period of PSC rail beam to be linked with period of infrastructure construction and construction of steel rail beam, structure construction of station etc. It is compared to crane construction methods and launching girder as alternative construction methods and propose to upper construction methods which is superior in economic and construction.

  • PDF

Evaluating New Track Construction Costs of Two Different Options: Conventional Trains vs. Tilting Trains

  • Rho, Hag Lae;Han, Seong Ho;Kim, Gang Seog
    • International Journal of Railway
    • /
    • v.5 no.3
    • /
    • pp.103-113
    • /
    • 2012
  • Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.

RIMS project application raising for a public transportation immediacy operation (공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용 제고)

  • Son Young-Jin;Lee Kang-won;Bang yeon-goon;Lee do-sun
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.897-901
    • /
    • 2005
  • 21 century as the knowledge information anger society now our society industry of all fields the rolling stock maintenance conservative standardization enterprise where information anger is being turning out construction Ministry of Transportation supported with continuous development of the supply section substitution quantity information processing system which the information highway is quick and the Korean railroad technical research worker propelled the enterprise as the subjective agency, it contracted this for a vehicle field information anger system construction in link of the enterprise our construction and an agreement, information technique composed the consortium t9day and it propelled a system codevelopment. The SMSC who is a front-runner of Maj loach city railroad operation agency to 'here business relates with a vehicle field maintenance conservativeness an immediacy operation and generally and information anger it will plan it will integrate it will own jointly and business efficiency and in the dictionary an obstacle occurrence electromotive car maintenance conservative information and it will improve only maintenance conservativeness of preventive maintenance of the electromotive car it knows it will prevent to construct the maintenance conservative system of the preventive maintenance, it applied the RIMS project to sleep.

  • PDF

Development for Motion Evaluation of Tilting Simulator (틸팅 시뮬레이터의 운동판 설계에 관한 연구)

  • Song, Yong-Soo;Kim, Jung-Suk;Lee, Su-Gil;Han, Seong-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2004.07d
    • /
    • pp.2631-2633
    • /
    • 2004
  • This paper describes the construction of a half sphere screen driving tilting simulator that can perform six degree-of-freedom( DOF) motions simmulator to a tilting train. The mathematical equations of Tilting Train dynamics are first derived from the 6-DOF bicycle model and incorporated with the bogie. carbody, and suspension subsystems. The equations of motion are then programmed by visual C++ code. To achieve the simulator functions. a motion platform that is constructed by six electric-driven actuators is designed. and its kinetics/inverse kinetics analysis is also conducted. Driver operation signals such as carbady angle, accelerator. and tilting positions are measured to trigger the Tilting dynamics calculation and further actuate the cylinders by the motion platform control program. In addition. a digital PID controller is added to achieve the stable and accurate displacements of the motion platform. The experiments prove that the designed simulator is adequate in performing some special rail mad driving situations discussed in this paper.

  • PDF