• Title/Summary/Keyword: quantity-per-unit costing

Search Result 4, Processing Time 0.02 seconds

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF

Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method (무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석)

  • Lee, Dong Wook;Cho, Hong Jun;Lee, Keun Jo;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.457-468
    • /
    • 2011
  • Recently, the non-vibration mass excavation method is used on sewage pipes and road construction sites in Jeju. However, a construction cost estimation based on the unit quantity does not provide a proper unit price. In this study, a comparison of the productivity of the standard quantity-per-unit costing method and the one of the work crew combination method was made based on the site monitoring of the non-vibration mass excavation method that is used in construction sites near Jeju. For this, data of 35 sites were collected: a regression equation was derived from the 30 data, and verification was carried out through the remaining 5 data. The analysis concluded that a day's workload is $16.43m^3$. In addition, a combination of the equipment considering the site conditions and the amount of labor, which varies with the number of work crew was obtained in order to estimate the construction cost of the work crew combination method. The construction cost was calculated based on the one-day workload ($16.43m^3$) derived from the regression analysis. The cost then was analyzed and compared with the standard quantity-per-unit costing method.

The Fact-finding and Analysis of the Environmental Management Cost in Construction Projects (건설공사의 환경관리비용 계상 및 운용 실태 분석)

  • Choi, Min-Soo;Kang, Woon-San
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.186-192
    • /
    • 2005
  • The purpose of this study is to find the reality of environmental management cost in construction projects and to suggest some policies in order that owners appropriate the environmental management cost reasonably in the construction budget for reducing the environmental pollution at job sites. We surveyed the actual state of appropriating and expending the environmental management cost over 122 construction sites. According to the results of the survey, while the appropriated rate of the environmental management cost was 0.59% of the total construction cost. the expended rate reached at 0.94%. When examining the antipollution facilities which were operated in job sites, the investment for equipment against air-pollution such as tire washer, dust-proof device was relatively higher than other antipollution equipment. As the method appropriating the environmental management cost, we concluded that a quantity-per-unit costing method is more reasonable than appropriating at a fixed rate of total construction cost considering that there is little correlation between total construction cost and the environmental management cost. To do so, antipollution facilities that must be examined at a design or estimation stage of a construction project should be prescribed by the law. Moreover, referenced cost data for the quantity-per-unit costing should be prepared and officially published.

Proper Estimating Method for Environmental Preservation Cost in Road Projects (도로공사 환경보전비의 적정 산출 방안)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.3-10
    • /
    • 2012
  • The current enforcement regulation of "Construction Technology Management Act" prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost.