• Title/Summary/Keyword: quantity calculation

Search Result 256, Processing Time 0.022 seconds

The Characteristic of Laws on the Kind of Urban Green Spaces and the Legal Requirements for the Green Spaces of Urban Habitat in China (중국의 도시녹지 종류와 도시거주구 녹지의 설치 기준에 관한 법제도의 현황과 특성)

  • Shin, Ick-Soon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.3
    • /
    • pp.1-11
    • /
    • 2013
  • This study investigated Chinese Laws on the kind of urban green spaces and the legal requirements for the green spaces of urban habitat and analyzed the specificities of them intending to provide basic data to suggest bringing in or not the relevant Chinese Laws to Korea. This study can be summarized as follows: First, the concept of Chinese urban green spaces(g.s.) classified by 5 kinds(park g.s., production g.s., protection g.s., attachment g.s., the others g.s.) placed the park and green spaces in the same category unlike the Korean urban green spaces that only distinguishes between park and green spaces. The Chinese Urban Park is classified by 4 kinds(composite park, community park, special park, linear park) at the 'Standard for urban green spaces classification' which is below in rank of the legal system. Second, in case of calculation for green spaces ratio of urban green spaces in China, the green rooftop landscaping area should not be included as a green spaces area except the rooftop of a basement or semi basement building to which residents have easy access. The green spaces requirements and compulsory secure ratio by 3 habitat kinds(habitat, small habit, minimum habitat) of when to act as a residential plan is regulated. Third, the green spaces system is obligated to establish at habitat green spaces plan and is specified to conserve and improve existing trees and green spaces. The green spaces ratio on reconstruction for old habitat is relaxed to be lower than for new habitat and a gradient of green spaces is peculiarly clarified. The details and requirements for establishment and the minimum area intending for each classes of the central green spaces(habitat park, children park, minimum habitat's green spaces) are regulated. Especially at a garden style of minimum habitat's green spaces, intervals between the south and north houses and a compulsory security for green spaces area classifying into two groups(closing type green spaces and open type green spaces) by a middle-rise or high-rise building are clarified. System of calculation for green spaces area is presented at a special regulation. Fourth, a general index(area/person) of public green spaces within habitat to achieve by 3 habitat kinds is determined, in this case, the index on reconstruction for a deterioration zone can be relaxed to be lower to the extent of a specified quantity. A location and scale, minimum width and minimum area per place of public green spaces are regulated. A space plot principle including adjacent to a road, greening area ratio against total area, security of open space and the shadow line boundary of sunshine are also regulated to intend for public green spaces. Fifth, the minimum horizontal distance between the underground cables and the surrounding greening trees are regulated as the considerable items for green spaces when setting up the underground cables. The principle to establish green spaces within public service facilities is regulated according to the kind of service contents. It shall be examined in order to import or not the special regulations that only exist in Chinese Laws but not in Korean Laws. The result of this study will contribute to gain the domestic landscape architect's' sympathy of the research related to Chinese urban green spaces laws requiring immediate attention and will be a good chance to advance into the internationalization of Korean Landscape Architectural Laws.

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

Long-Term Outcome Of Arthroscopic Meniscectomy In Traumatic Patients (외상성 반월상 연골 파열의 관절경적 절제술 후 장기 추시 결과)

  • Seo, Jae-Seong;Min, Hak-Jin;Yoon, Ui-Seong;Kim, Hee-Seon;Kim, Yoon-Jong;Kim, Yoo-Mih
    • Journal of the Korean Arthroscopy Society
    • /
    • v.9 no.2
    • /
    • pp.174-179
    • /
    • 2005
  • Purpose: To study the long-term outcome of arthroscopic meniscectomy with regard to clinical symptoms and radiographic signs of osteoarthritic change. Materials and Methods: The materials for the investigation consisted of 79 individuals among 144 patients who underwent knee arthroscopy due to an isolated meniscal tear from October 1990 to September 1992 in our hospital. Those 79 individuals were followed up for $10{\sim}15$ years after the knee arthroscopy and were took clinical examination through the review of knee radiographies obtained with weight bearing. 52 of the 79 patients were men, and the mean age of the total materials was 34.6 years old (in the range $17{\sim}48$). Results: At follow-up, radiographic changes including Fairbank changes and joint space narrowing were seen from 45 of the 79 patients (56.2%). In other calculation, radiographic changes were seen in 23 out of 54 patients (42.6%) who had a partial meniscectomy, but were presented in 22 out of 25 patients (88.0%) who had a total meniscectomy. As a result, more radiographic changes were seen after total meniscectomy (p=0.03). In clinical results, 39 out of 54 patients (72.2%) after partial meniscectomy were satisfactory, and 14 out of 25 patients (56.0%) after total meniscectomy were satisfactory, therefore, more percentage of patients were satisfactory in partial meniscectomy group than in total meniscectomy group, but the statistical differences were absent (p=0.24). Conclusion: The frequency of radiographic changes in $10{\sim}15$ years after meniscectomy was related to the quantity of the meniscus removed, but the differences of these changes were low and had little influence on activity and knee function.

  • PDF

A Study on the Nutrients Intake and Physical Growth and Development of Junior High School Girls in Cheju Is. Area (제주지역(濟州地域) 여중학생(女中學生)의 영양실태(營養實態)와 성장발육(成長發育)에 관한 연구(硏究))

  • Hong, Yang-Ja
    • Journal of Nutrition and Health
    • /
    • v.8 no.4
    • /
    • pp.15-26
    • /
    • 1975
  • The purpose of this paper is to investigate the nutrients intake situation and the physical growth and development of junior high school girls in cheju island, the peculiar area in Korea, and to study every possible correlation ketween daily food intake and growth rate of them. Further, it made an attempt to research nutrition problems for them in this area and assist in their growth and development through proper nutritional marragement. The survey was conducted in seven sample schods selected randomly from all three districts -this is Bukcheju-gun, Namcheju-gun and cheju city-of cheju Island. Four hundred eighteen girls, aged thirteen years ald, in second year grade of junior high schools, were provided with prepared questionnaires. For six days, July $16{\sim}21$ in 1975, the respondents filled out the questionnaires. They were asked to keep record of what they ate each meat. Their mitrients intake were analyzed in accordance with their daily food intake records during a six day period. On the other side, including physical growth index calculated by means of weight and hight of the respondents, their school records were also investigated. Critical Ratio as well as percentage calculation were included for statistical analysis. The findings and results abtained are summarized as follows: (1) Living circumstance a) Average numbers of brother and sister in sampled pupils' family were five. b) Niety percent of the respondents were brought up by mother's milk at their infants and 45 percent of them were weaned at the age of 13 to 24 months. c) Fourty-six percent of them revealed irregulity in their meal time. d) The most favorite main dish was boiled rice mixed other cereals (34%), next bread (31%) and boiled noodle (26%), and kimchi was the most papular side dish (64%). (2) Nutrition survey a) The average calorie intake of a pupil per day was 1,783 cal. and the total calorie intake was composed of carbohydrate 73%, pratein 15%, fat 12% respectively. b) Carolie and nutrients were lower than the recommended level, except vitamins A,$B_1$ and Niacin, c) Average protein intake per day was 68g, which was relatively near to the recommended level, but in fact, most of them came from grain which is lacking in essential amino acids. The ratio of animal protein intake to tatal protein intake was 36%. d) Their average animal food intake was proportionated in 14% in their total food intake and the cereals consumed in the largest quantity at the level of 63% out of whole food groups. (3) The results of statistical analysis a) The correlation between the calorie intake and the physical growth index revealed statistical significancy at the level of P<.005. b) The correlation between the protein intake and the physical growth index revealed statistical significancy at the level of .01

  • PDF

Improvement of Personnel Cost and Placement Scale of Quality Manager for Construction (건설공사 품질관리자의 인건비 및 배치규모 개선)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.327-335
    • /
    • 2018
  • In order to calculate the quality management cost of construction work, the process must conform to relevant laws and regulations. In details, the cost of the various items such as quality test fee and quality control activity cost are required to be calculated. Regarding the quality management costs, the labor cost is applied to the quality examination fee and the calculation unit quantity in the construction quality management duties. The application of the unit price of the labor cost stipulates that Construction Association of Korea and Korea Engineering & Consulting Association apply the unit price which is surveyed and published. However, in the related laws and regulations, the standard of the quality manager and quality tester is not clear. This accounts for the confusion in the cost of construction management and the cost of labor. In the current law, the allocation standard of quality control personnel is specified according to the size of the construction, but the standard of placement of quality testers is not specified. At the construction site, there is no assignment criteria manpower for quality testers except quality managers, or very little work is being done. The quality control personnel conducts the quality test work to be carried out by the quality tester, and this carrying out heavy work. Therefore, it is difficult to maintain quality control activities. In this study, the labor cost of quality management expenses and the allocation criteria of quality managers and quality testers are established and presented for the purpose of securing the quality of the construction work and preventing the construction work. It is stipulated that the standards of the relevant laws and regulations, which are not clear, should be classified into quality control personnel and quality testers according to the size of the construction. Based on the unit price of Korea Engineering & Consulting Association, the personnel expenses of quality managers and quality testers are proposed to apply the unit price of engineer (professional engineer, specialist, advanced, intermediate, beginner) and skilled technicians (advanced, intermediate, beginner).

A Prediction of N-value Using Artificial Neural Network (인공신경망을 이용한 N치 예측)

  • Kim, Kwang Myung;Park, Hyoung June;Goo, Tae Hun;Kim, Hyung Chan
    • The Journal of Engineering Geology
    • /
    • v.30 no.4
    • /
    • pp.457-468
    • /
    • 2020
  • Problems arising during pile design works for plant construction, civil and architecture work are mostly come from uncertainty of geotechnical characteristics. In particular, obtaining the N-value measured through the Standard Penetration Test (SPT) is the most important data. However, it is difficult to obtain N-value by drilling investigation throughout the all target area. There are many constraints such as licensing, time, cost, equipment access and residential complaints etc. it is impossible to obtain geotechnical characteristics through drilling investigation within a short bidding period in overseas. The geotechnical characteristics at non-drilling investigation points are usually determined by the engineer's empirical judgment, which can leads to errors in pile design and quantity calculation causing construction delay and cost increase. It would be possible to overcome this problem if N-value could be predicted at the non-drilling investigation points using limited minimum drilling investigation data. This study was conducted to predicted the N-value using an Artificial Neural Network (ANN) which one of the Artificial intelligence (AI) method. An Artificial Neural Network treats a limited amount of geotechnical characteristics as a biological logic process, providing more reliable results for input variables. The purpose of this study is to predict N-value at the non-drilling investigation points through patterns which is studied by multi-layer perceptron and error back-propagation algorithms using the minimum geotechnical data. It has been reviewed the reliability of the values that predicted by AI method compared to the measured values, and we were able to confirm the high reliability as a result. To solving geotechnical uncertainty, we will perform sensitivity analysis of input variables to increase learning effect in next steps and it may need some technical update of program. We hope that our study will be helpful to design works in the future.