• Title/Summary/Keyword: public water supply and sewerage

Search Result 14, Processing Time 0.026 seconds

LESSONS LEARNT IN THE IMPLEMENTATION OF DEVELOPMENT PROJECTS IN SOUTH AFRICA

  • Wellington Didibhuku Thwala
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.364-367
    • /
    • 2011
  • The levels of unemployment and poverty are extremely high and two of South Africa's most pressing problems. There is also a widely acknowledged need for housing and municipal infrastructure (water supply, sewerage, streets, storm water drainage, and electricity, refuse collection). From a theoretical perspective supported by experience elsewhere in Africa, there are reasons for considering that properly formulated employment creation programmes based on the use of labour-intensive methods could be established to construct and maintain the required physical infrastructure, thus creating employment, skills and institutional capacities. Over the past 30 years several projects have been initiated in South Africa to counter unemployment and poverty. Given the socio-economic conditions and political objectives (regarding development, employment creation and alleviation of poverty), it is anticipated that future large-scale construction projects will be proposed by the public sector (National, Provincial and Local Government). The paper will first examine the main tenets of the implementation of development projects through the use of labour-intensive construction and a description of progress elsewhere in Africa and their potential contribution which public works programmes could make to alleviate the poverty and unemployment problems. The research will then analyse the successes and challenges that have been experienced in South Africa in relation to the implementation of development projects over the past 30 years. The paper closes with recommendations and lessons for the future.

  • PDF

A Comparative Study of risk based LOS(Level of service) of the Regional Water Supply (자산관리 상수도분야 리스크 기반 서비스수준)

  • Cho, Inuh;Lee, Youngjai
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.3
    • /
    • pp.305-317
    • /
    • 2015
  • The function failure of present major facilities is likely to lead to failure of related systems and/or whole facilities, increasing the necessity for protection of infrastructures, main structures, and major industrial facilities. In addition, safe and efficient management for urban infrastructure (waterworks and sewerage facilities, electricity, telecommunications, roads, etc) installed in the basement or on large cities grounds at various public areas is required. Recently in response to this demand, efforts for vitalizing asset management are being made such as enacting related laws and developing asset management system in the U.S., Australia, Europe and other advanced countries with the concept for a new maintenance. In our county, identifying maintenance system problems such as aging and rapid increasing of existing infrastructures and decision-making about updating maintenance is required for systematic and organizational maintenance. In this study, by comparing and observing the LOS(Level of Service) of each countries' waterworks and risk-based LOS, we suggest the direction of future urban water infrastructure management systems for more effective management.

A Study on the Emission Characteristic and Improvement Plan of Domestic Sewage(NPS) in Rural Area (농촌지역 생활하수의 비점오염 유출특성 및 개선방안 연구)

  • SON, Jinkwan;KIM, Changhyun;Yun, Sungwook;KONG, Minjae;CHOI, Duckkyu;KANG, Donghyeon;Park, Minjung;KANG, Banghun
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.4
    • /
    • pp.37-46
    • /
    • 2018
  • The nonpoint pollution source (NPS) is irregular in the amount of generated and runoff. About 70% of the water pollution sources in Korea are NPS. Most of the rural areas are small towns with less than 50 families. This is where sewerage supply is poor. This is where the domestic swage of the house flows directly into the small stream. This study investigated the amount and concentration of domestic swage. And investigated NPS for public officials. We have suggested an improvement plan here. Local government officials lack the concept of NPS. Rural residents also do not know about NPS. Therefore, we proposed NPS public relations and education linked to public administration. This is an extension of the national budget and interest. The domestic swage is discharged at about 272 liters per day in a house. We proposed the introduction of small facilities. If the capacity remains, it is suggested to link to cattle shed, pigsty and so on. The BOD, COD, TN, TP, and SS concentrations were all high. This suggested a reduction in concentration in combination with natural water. Finally, NPS facilities were proposed to be put into rural areas. And it was determined that continuous monitoring was necessary. The results of this study were expected to be applied to NPS management.

Design and Construction Problems of Semi-Shield Method (SEMI-SHIELD 공법의 설계 및 시공상 문제점)

  • Kim, Jong-In;Jung, Sung-Nam;Park, Yeong-Geon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1275-1282
    • /
    • 2009
  • The tunnel excavations are used for construction of common utility tunnel, electric tunnel, communication line tunnel, water supply and public sewerage pile line in urban area. The trench cut methods were mainly used in the past, but now, tunneling method is more being used. The tunnel excavation method like as NATM, Messer-Shield, Semi-Shield Methods are being applied to small section tunnel in Korea. The actual construction results of seme-shield method are increasing due to simplified construction process and reduced noise and vibration. And also this method is being used frequently in waterway tunnel and construction of prevention flooding recently. The seme-shield method design guideline is absence except for electric line tunnel construction in Korea, because of the semi-shield method was developed in Europe and Japan. In the prescriptive design, engineer's subjects are tending to intervene, because of absence of standard and specification for details. Therefore, Design and Construction Problems of Semi-Shield Method were described and construction trouble was introduced for exam. These problem and construction troubles have to be examined thoroughly in advance.

  • PDF