• Title/Summary/Keyword: protruded pile

Search Result 3, Processing Time 0.017 seconds

Behavior of integral abutment bridge with partially protruded piles

  • Park, Min-Cheol;Nam, Moon S.
    • Geomechanics and Engineering
    • /
    • v.14 no.6
    • /
    • pp.601-614
    • /
    • 2018
  • This study presents structural and parametric analyses on the behavior of an integrated and pile-bent abutment with mechanically stabilized earth wall (IPM) bridge. The IPM bridge is an integral abutment bridge (IAB) with partially protruded piles, which excludes earth pressure by means of a mechanically stabilized earth wall developed by the authors. The results of the analysis indicate that the IPM bridge, as any other IAB, is influenced to a large extent by temperature and time-dependent loads. When these loads are applied, the stress on a pile in the IPM bridge decreases as the displacement of the pile top increases, because the piles protrude from the ground surface and no soil reaction is generated on the protruded pile. Because the length of an IAB is restricted by the forces acting on its piles, the IPM bridge is an effective alternative to extend its length.

[Retracted]Analysis of Minimum Penetrated Depth of Pile bent of IPM Bridge ([논문철회]토압분리형 일체식 교대 교량의 파일벤트에 대한 최소근입깊이 해석)

  • Kim, Hongbae;Kim, Taesu;Park, Jongseo;Han, Heuisoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.5
    • /
    • pp.45-53
    • /
    • 2017
  • IPM bridge was developed to revise the problems of IAB bridge by Nam et al, (2016). This research conducted the p-y analysis to examine the parameter traits among the protruded length (H), penetrated length (L) of pile bent and soil conditions. From the results, the maximum bending moment happened in the top segment of pile bent, because it is integrated to the upper structure. Also, the maximum shear force was shown in the boundary of the sand and weathered soil zones according to the analysis soil conditions. The maximum member force and unbraced length is converged when the ratio (L/H) of protruded length (H) and penetrated length (L) is 1.0. The larger material force is happened, if the pile bent is penetrated shallowly compared to the protruded length. The definite inflection points were shown in the horizontal displacement curve from the p-y analysis, also the smaller penetrated length made the curve grade slower.

Examination of Allowable Displacement by Structural Analysis of IPM Bridge (토압분리형 교량의 구조해석을 통한 허용 변위량 검토)

  • Kim, Hong-Bae;Han, Heui-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.534-544
    • /
    • 2019
  • Because the pile-bent of IPM Bridge is projected from the soil surface, excessive displacement of abutment can be induced. According to design guide of IPM Bridge, the shape of the bridges used in this study was applied to the maximum applicable 120.0m span, 30-degree for skew angle, and 10.0m for the protruded pile-bent height. The maximum displacement by the maximum span application condition of the IPM Bridge was calculated using this bridge model, and the safety of a horizontal displacement of the IPM Bridge was investigated based on the allowable displacement presented by Bozozuk. The maximum horizontal displacement of the IPM Bridge was calculated to be larger in the winter shrinkage condition than in the summer expansion condition, the horizontal displacements were more affected by the length of a bridge than by the skew angle. And the vertical displacement was not affected by the skew angle and length. As the span increases, the horizontal displacement increases significantly, the horizontal displacement at 120.0m span length was found to exceed the allowable displacement proposed by Bozozuk. However, the moment generated in the pile-bent did not exceed the plastic moment.