• Title/Summary/Keyword: projects

Search Result 9,565, Processing Time 0.031 seconds

Site | Structure | Architecture - Projects that Create Change

  • Chow, Leo;AIA, AIA;Sarkisian, Mark P.;LEED, PE SE
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.3
    • /
    • pp.237-248
    • /
    • 2017
  • China's rapid growth has created great opportunities for design and construction of projects that not only transform sites but cities. This work combines local, national, and international expertise in developing memorable designs that seek to humanize urban life and emphasize the importance of visionary clients. Innovative examples of work in China will be presented with emphasis on three iconic projects designed and built for Poly Corporation based in China. These projects include developments in Beijing and Guangzhou and introduce the use of locally supplied materials and construction techniques. The Poly Corporate Headquarters, the Poly Real Estate Headquarters, and the Poly International Plaza, and will be described through innovative ideas that integrate urban planning, structure, and architecture.

Causes of Schedule Delays in Building Construction Projects in Vanuatu

  • Kim, Dae Young;Chi, Seokho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.641-651
    • /
    • 2015
  • With its recent tourism boom, Vanuatu, a small country in the South Pacific, is experiencing an increasing demand for construction. However, it has been struggling with persistent schedule delays in their construction projects due to a variety of reasons. In an attempt to respond to this situation, this paper aims to identify the major causes of schedule delays in building construction in Pacific island countries, with a focus on Vanuatu. To collect data on the factors affecting schedule delays, face-to-face interviews were conducted. Based on these, seven major causes of schedule delays, as selected by the majority of the participants, were identified and discussed to provide perceptive insights for future improvement opportunities. This paper attempts to help contractors with limited resources better understand the major causes of schedule delay in Vanuatu and achieve better performance in building projects.

A Case Study of Information System Auditing of CBD Project (CBD프로젝트의 정보시스템감리 사례연구)

  • 조남재;박기호;전순천;박준호
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.2
    • /
    • pp.167-178
    • /
    • 2004
  • Different from traditional development methodologies like waterfall model, the CBD (component based development) methodology relies on a building block approach in the design and development of information system. The audit procedure and checklist for the traditional IS development methodology are required to be modified to be suitable for CBD. This research reviewed IS audit guidelines for the existing development process and analyzed multiple projects that employed the by component based development process. For the purpose of this study, we chose a governmental project and a next-generation IS project of a financial agency as sample cases. By comparing existing IS audit checklists and items actually reviewed in audit projects, this study identified appropriate check items for the CBD-centric audit program. New items were proposed as additional items such as project control in management phase, usage case and conceptual model establishment, component evaluation and design, in implementation phase, and so forth. The result of the research provides new guidelines for the audit CBD projects for the purposed of increased efficiency and qualify of application development projects.

  • PDF

The Impacts of Requirement Uncertainty and Standardization on Software Project Performance : A Comparison of Korea and USA (요구사항 불확실성과 표준화가 소프트웨어 프로젝트 성과에 미치는 영향 : 한국과 미국의 비교연구)

  • 나관식
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.2
    • /
    • pp.15-27
    • /
    • 2004
  • Most software projects inevitably involve various types and degrees of uncertainty. Without proper risk assessment and coordination, software projects can easily run out of control and consume significant additional resource. Thus, risk management techniques are critical issues to information system researchers. Previous empirical studies of U.S. software firms support the adoption of development standardization and user requirement analysis techniques in risk-based software project management. Using data collected from software projects developed in Korea during 1999-2000, we conduct a comparative study to determine how risk management strategies impact software product and process performance in countries with dissimilar IT capabilities. In addition, we offer an alternative conceptualization of residual performance risk. We show that the use of residual performance risk as an intervening variable is inappropriate in IT developing countries like Korea where the role of late stage risk control remedies are critical. A revised model is proposed that generates more reliable empirical implications for Korean software projects.

  • PDF

A Reality Analysis on the Elementary School Landscape for Environmental Education (초등학교 환경교육을 위한 학교조경 실태분석 -서울시 사례연구-)

  • 조세환;김태현
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.1
    • /
    • pp.127-135
    • /
    • 2004
  • This study aims to suggest the directions of the elementary school landscaping in terms of environmental education. The 96-case of school landscaping projects had been implemented for 2001 - 2002 in Seoul was selected, and the trends and contents of the projects for improving the school landscape was reviewed. Also, specially the 9-case among them was selected and analyzed whether or not the projects were effective for the environmental educational places. The paper showed that it was not fully matched with the environmental education programs in the textbooks that need the actual spaces and facilities including woods, outdoor class, kitchen garden, breeding farm and ecology pond etc. Also, it appeared that the teachers and students did not satisfied with the projects for improving the school landscape. Finally, this paper suggested that the species diversity of plants and animal, water and forest environment should be emphasized on the school landscaping.

The Foreign and Domestic Projects for Bridging the International Digital Divide (국제 정보격차(digital divide)해소를 위한 국내외 사업유형)

  • Choi, Seok-Beom;Lee, Jeong-Min;Jung, Jae-Woo
    • International Commerce and Information Review
    • /
    • v.5 no.2
    • /
    • pp.159-184
    • /
    • 2003
  • Information and communication technology has brought neck-breaking speed of changes to the global society in 20th century. The more the speed of change accelerated, the more widened the digital divide between the developed countries and the developing countries. In spite of the importance of solving digital divide, the current situation and status of projects for bridging the international digital divide around the world is not fully researched. Therefore, the purpose of this paper is to study the foreign and domestic projects for bridging the international digital divide and to suggest the efficient ways of domestic projects for solving the international digital divide.

  • PDF

High Strength Steel Pipe Strut Field Applicability Evaluation through case studies of Domestic Constuction Projects (국내 적용사례 분석을 통한 고강도 강관버팀보의 현장 적용성 평가)

  • La, Seung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.457-464
    • /
    • 2010
  • Ever since the introduction of high strength steel pipe strut(POSTRUT) in 2008, there has been over 50 applications domestically. The merits of construction period reduction and cost savings have been well reported abroad in countries such as America, Europe and China but ever in domestic projects or ground condidtions. 25 actual construction projects were investigated and statistically analyzed to evaluate the quantitative effects of POSTRUT. Also the construction projects along with the cautions that should be taken and the structural behavior differences between POSTRUT and H-section struts are briefly described in this paper.

  • PDF

A Study on the Design Characteristics of Arne Jacobsen based on Danish Modern - Focused on the Architectural Space Project - (데니쉬 모던을 바탕으로 한 아르네 야콥센의 공간디자인 특성 - 건축 공간 프로젝트를 중심으로 -)

  • Kim, A-Ram;Kim, Jong-Jin
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.2
    • /
    • pp.39-46
    • /
    • 2011
  • Danish Modern has been recognized as simple and comfortable design movement that was matched with its unique regional environment. There are various internationally well known designers such as Arne Jacobsen, Verner Panton. Danish Modern movement and International style had vital role to activate these designers' ideas and design quality. This paper aims to study the background and design characteristics of Danish Modern movement as well as some of the spatial projects by Arne Jacobsen. Furniture design of Jacobsen were already throughly studied in various researches. However his spatial projects such as architectural buildings and interior designs were not. This study analyzes three major architectural projects based on the four characteristics of Danish Modern: Formal Simplicity, Simple Functionality, Regional Contextuality, Reasonable Amusement. After the case study, this study discovered that Danish Modern characteristics had unique roles in the design process of Jacobsen's projects. Danish Modern is still valid design philosophy that can be applied to contemporary society.

Factors Affecting Timely Completion of Construction Projects in Nepal

  • Acharya NirmalKumar;Lee Young-Dai;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.254-257
    • /
    • 2003
  • It is common to experience delays during construction projects. Delays can ca use substantial damages to an owner as well as contractors and is the sources of frequent disputes and claims. Many studies have been carried out to assess the causes of delays in construction projects. They are found to be almost similar, except some prevailed local condition. Most of the common construction delay factors are attributed to design faults, incompetent contractor, lack of team accountability etc. To minimize or eliminate the delay we have to follow the recognized fundamental principles of management such as: cost-time relationship, time priority, accountability, rewards, innovative thinking etc. The root causes of delays found out in this paper are not so much different than other previous study. If the implementing agencies properly followed the, fundamental management principles and some other related corrections as recommended in the paper, much construction delays can be avoided.

  • PDF

An Empirical Study On Information Systems Operation Cost Estimation Model (정보시스템 운영사업 비용산정 모형 개발에 대한 실증적 연구)

  • Kim, Hyeon-Su
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.6
    • /
    • pp.1810-1817
    • /
    • 2000
  • The purpose of this research is to develop an estimation model for information systems operating costs. Current cost estimation practices and types of sytem management projects have been reviewed an analyses. Typical operating project types of information systems are determined. They are application system operation, help disk operation, network management and operation, and hardware management. For each type of projects, cost factors ar identified and a structure of cost estimation model is defined. Cost estimation models have been constructed and tested by 24 real operation projects data. Statistical analysis shows derived models are statistically significant. User groups' opinion on these draft cost estimation model has been surveyed and summarized. The results of this research can be used as a cornerstone for future research on operating cost estimation, and for cost estimation guideline of information systems operation projects.