• 제목/요약/키워드: project team

검색결과 1,110건 처리시간 0.026초

6시그마의 효과 측정을 위한 성숙도 모형 개발 (Six Sigma Maturity Model for MeasuringEffectiveness of Six Sigma Activities)

  • 조지현;장중순
    • 대한산업공학회지
    • /
    • 제32권4호
    • /
    • pp.279-290
    • /
    • 2006
  • This paper proposes a model to assess the maturity level of Six Sigma activities. We classify the maturity level into 5 stages: initial, forming, storming, performing and mature stage. To evaluate the maturity level, 10 categories of Six Sigma with 3 factors each are identified: management leadership, belt system, expert training, establishing execution system, compensation, organization, corporate culture, customer focus, project selection, and management of project results. Scoring 277 items in total, the value of each factor is evaluated by weighted average of those items. Maturity level is appraised by rating the sum of scores of 10 categories that are obtained by summing up the values of its 3 factors. Values of weights and criteria of rating maturity levels are determined by analyzing 90 companies and Six Sigma exper's opinion. This study also shows the actual appraisal results of some companies.

보건소조직을 통한 고혈압관리사업 (Community-based Hypertension Control Program in Hwachon : Problems and Possibilities)

  • 이인숙;배상숙
    • 보건행정학회지
    • /
    • 제3권2호
    • /
    • pp.25-56
    • /
    • 1993
  • Hypertension has already become a serious health problem in many countries. Treatment is effective, however, and the detection and long-term management of those at risk pose sustained challenges. Community programs can be an important strategy for primary prevention of hypertention and for monitoring the progress and promoting compliance of hypertensive patients. Hwachon Health Demonstrain Project has designed community hypertention control program, especially emphasizing role of public health sector, and operate that model from 1990 at Hwachon county, Kwangwon province. This paper appraise the effectiveness of curent activities. Many paper appraise the effectiveness of curent activities. Many hypertensive persons who have not recognized his disease were identified and began hypertension treatment. However about two thirds of patients have not complied continuously with medical advice. Consequently, the project team redirects its efforts. Less emphasis is being placed screening and identification of patients, while more emphasis is being placed on increasing compliance with treatment recommendations. Some approches to improve hypertension control program are also discussed in the context of the field experience and literature on this suvjest.

  • PDF

공공프로젝트 친환경 설계지침의 변화에 따른 건축설계프로세스 연구 (Architectural Design Process by the Changes of Sustainable Design Guidelines of Public Project)

  • 태영란
    • 한국태양에너지학회 논문집
    • /
    • 제30권4호
    • /
    • pp.63-70
    • /
    • 2010
  • This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.

모래지반의 준설시 준설효율 검토 (Studies on Effects of Dredging Works in non-cohesive Soils)

  • 양태선;박홍신;민경호;이충호
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.1065-1070
    • /
    • 2008
  • The evaluation of dredging works of pump dredger considering soil conditions is a main idea in calculating construction costs in non-cohesive soil layers. For using pump dredger, on effects of pump dredger equipment, some data of overseas code for pump dredger are different to those of results and a pump dredging capability table in the field of costs. In this study, considerations of sandy soils are described for application of construction works.

  • PDF

상전도식 도시형자기부상열차(UTM-01) 개발현황 (Development of EMS Type Urban Transit Maglev System)

  • 조흥제;유문환;김봉섭
    • 기계와재료
    • /
    • 제11권2호통권40호
    • /
    • pp.111-118
    • /
    • 1999
  • Test Results and Status of development of the urban transit maglev system(UTM-O1) are reported. Maglev Project Team in KIMM, in cooperation with Hyundai Precision Company and the Korea Electrotechnology Research Institute(KERI), has successfully finished the second stage development project (1995. 5-1998. 8) and demonstrated a prototype two vehicle consisted urban maglev train operating in the speed range of 50km/h. In this paper, we report various test results of the UTM-01 system, present status of quo and future prospect, and what have been done so far to improve the performance of the maglev system overall.

  • PDF

토질변화에 따른 Pump 준설능력 산정 (Evaluation of Dredging Capability of Pump Dredger based on Soil Conditions)

  • 박홍신;유영인;김하영
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.316-321
    • /
    • 2006
  • The Prouductivity of pump dredger varies very much depend on soil conditions is one of the main factors affecting construction period. Therefore the acculate evaluation of dredging capability of pump dredger considering soil conditions is a main task in dredging projects. After assesing the results of pump dredging on several Gwangyang port projects, some data of Japan standard for pump dredger are similar to those of actual results and a pump dredging capability table is prepared for future evaluation purposes.

  • PDF

IT서비스 프로젝트의 이익개선율 영향요인에 관한 연구 (A Study on the Influencing Factors on the Profit Improvement Rate of IT Service Projects)

  • 이경배;오재인
    • Journal of Information Technology Applications and Management
    • /
    • 제17권4호
    • /
    • pp.127-156
    • /
    • 2010
  • Most companies in the IT service industry have suffered from low profitability although this industry is highly value added, which may result in losing the competitiveness of the industry. The purpose of this study is to identify the influencing factors on the profit improvement rate of IT service projects and suggest how to improve the profit improvement rate, thus recovering the competitiveness of the IT service industry. The 273 IT service projects conducted by an IT service company in Korea during the past three years were analyzed and the project managers who performed these projects responded to the questionnaire developed in this study. The result from the analysis of data collected shows that the influencing factors on the profit improvement rate of IT service projects include scheduling, experience in similar projects, the leadership of project leaders, the level of team skills, relationship with clients, and clients support.

  • PDF

Bioinformatics for the Korean Functional Genomics Project

  • Kim, Sang-Soo
    • 한국생물정보학회:학술대회논문집
    • /
    • 한국생물정보시스템생물학회 2000년도 International Symposium on Bioinformatics
    • /
    • pp.45-52
    • /
    • 2000
  • Genomic approach produces massive amount of data within a short time period, New high-throughput automatic sequencers can generate over a million nucleotide sequence information overnight. A typical DNA chip experiment produces tens of thousands expression information, not to mention the tens of megabyte image files, These data must be handled automatically by computer and stored in electronic database, Thus there is a need for systematic approach of data collection, processing, and analysis. DNA sequence information is translated into amino acid sequence and is analyzed for key motif related to its biological and/or biochemical function. Functional genomics will play a significant role in identifying novel drug targets and diagnostic markers for serious diseases. As an enabling technology for functional genomics, bioinformatics is in great need worldwide, In Korea, a new functional genomics project has been recently launched and it focuses on identi☞ing genes associated with cancers prevalent in Korea, namely gastric and hepatic cancers, This involves gene discovery by high throughput sequencing of cancer cDNA libraries, gene expression profiling by DNA microarray and proteomics, and SNP profiling in Korea patient population, Our bioinformatics team will support all these activities by collecting, processing and analyzing these data.

  • PDF

Leader-subordinate communication and leadership style in a project team

  • Oh-Kyoungjo;Lee, Jinjoo
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1990년도 춘계공동학술대회논문집; 한국과학기술원; 28 Apr. 1990
    • /
    • pp.365-373
    • /
    • 1990
  • The relationships between leader-subordinate interpersonal communication and performance were examined in conjuction with leadership for small project teams of six research institutes funded by Korean Government. The official communication was more positively related to consideration than initiating structure of leader behavior. The non-official communication was positively related to consideration but not significantly related to initiating structure. Each dimension of the performance was positively related to the official and non-official communication for total sample and related differently to the communications according to leadership types for given leadership style.

  • PDF

교통대응 신호제어 시스템의 효율성 평가 (The Assessment of TRACS(Traffic Adaptive Control System))

  • 이영인
    • 대한교통학회지
    • /
    • 제13권1호
    • /
    • pp.5-33
    • /
    • 1995
  • This paper addresses the outlines of the traffic signal timing principles engaged in TRACS and the results of field test. Research team, encompassing research institute, university, and electronic company, conducted the three-year project for developing the new system, named TRACS(Traffic Adaptive Control System). The project was successfully completed in 1994. TRACS aims at accomplishing the objectives of better traffic adaptability and more reliable travel time prediction. TRACS operates in real-time adjusting signal timings throughout the system in response to variations in traffic demand and system capacity. The purpose of TRACS is to control traffic on an area basis rather than on an isolated intersection basis. An other purpose of TRACS is to provide real-time road traffic information such as volume, speed, delay , travel time, and so on. The performance of the first version of TRACS was compared to the conventional TOD control through field test. The test result was promi ing in that TRACS consistantly outperformed the conventional control method. The change of signaltiming reacted timely to the variation of traffic demand. Extensive operational test of TRACS will be conducted this year, and some functions will be enhanced.

  • PDF