• Title/Summary/Keyword: project team

Search Result 1,101, Processing Time 0.026 seconds

Project Performance Improvement of Employees: A Psychological Empowerment Approach

  • Oh, Sung-Tae;Kim, Sodam;Kim, Hee-Woong
    • Asia pacific journal of information systems
    • /
    • v.26 no.4
    • /
    • pp.509-525
    • /
    • 2016
  • According to the dynamic changes in the business environment, the structural transformation of firms has had an observable trend. An increasingly large number of firms have been transforming into either project-based organizations or project expert groups. This study aims to investigate the antecedents required for the optimal level of empowerment with consideration of the project-based team environmental nature and job characteristic. Three factors are applied to measure the significant effects on psychological empowerment as the result variables. To determine the antecedents and consequent factors of psychological empowerment, employees' interviews and precedent studies are used. For the empirical study, four determinants of empowerment variables are modeled into a second-order reflective construct. This study finds that psychological empowerment significantly affects performance. Therefore, this study can serve as a guideline for development and operating methods for project success.

Project Learning Enablers within Fragmented Construction Projects

  • Alashwal, Ali Mohammed
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.588-592
    • /
    • 2015
  • Many studies have affirmed a negative influence of fragmentation on learning and knowledge sharing in construction projects. However, the literature overlooked enablers of learning within this context. The purpose of this paper is to explore the factors that facilitate project learning and ways to negate any unbecoming effects of fragmentation. Qualitative study used to explore the enablers through interviews administered to 11 top management individuals working in different construction projects in Malaysia. The findings revealed the following factors: participation, relationships, togetherness, and roles of project leader and coordinator. The role of boundary objects was also highlighted including information technology (IT), contract and procedures, drawings, specifications, and reports. The outcome of this paper initiates the development of a model for better knowledge creation and sharing in construction projects. The significance of this model stems from its ability to connection both the characteristics of construction project and project learning theories using the enablers. It is envisaged that future work will be to confirm the model in a quantitative study.

  • PDF

Understanding Collaborative Working Processes within Construction Project Teams Using Agent-Based Modeling and Simulation (에이전트기반 시뮬레이션을 활용한 건설프로젝트 조직 내 협업과정의 이해)

  • Son, JeongWook;Shin, Seung-Woo;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.70-77
    • /
    • 2014
  • Collaborative processes among team members including communication, coordination, and information-handling processes either during pre-construction or project execution are required in order to accomplish the objectives of construction projects. However, current construction management practice does not explicitly take the effect of organizational aspects on project performance into account. This paper introduces a method to understand collaborative processes in an explicit and systematic fashion. An agent-based simulation of collaborative working processes within construction project teams was designed from game theory perspective and implemented. The simulation produced both individual behavior and network dynamics. Individuals represented as agents made efforts to improve performance by communication and coordinating with other members, and overall team network was emerged as a result of interactions among members. Interestingly, it was found that the tendency of forming cohesive subgroups increased when sustaining relations with between-group partners incurs higher cost. The primary contribution of this paper is that it presented an explicit approach to examining collaborative working processes in construction project teams and it extended existing computational organization and network studies by integrating individual behavior models and network models.

The Busan Regional CardioCerebroVascular Center Project's Experience Over a Decade in the Treatment of ST-segment Elevation Myocardial Infarction

  • Lim, Kyunghee;Moon, Hyeyeon;Park, Jong Sung;Cho, Young-Rak;Park, Kyungil;Park, Tae-Ho;Kim, Moo-Hyun;Kim, Young-Dae
    • Journal of Preventive Medicine and Public Health
    • /
    • v.55 no.4
    • /
    • pp.351-359
    • /
    • 2022
  • Objectives: The Regional CardioCerebroVascular Center (RCCVC) project was initiated to improve clinical outcomes for patients with acute myocardial infarction or stroke in non-capital areas of Korea. The purpose of this study was to evaluate the outcomes and issues identified by the Busan RCCVC project in the treatment of ST-segment elevation myocardial infarction (STEMI). Methods: Among the patients who were registered in the Korean Registry of Acute Myocardial Infarction for the RCCVC project between 2007 and 2019, those who underwent percutaneous coronary intervention (PCI) for STEMI at the Busan RCCVC were selected, and their medical data were compared with a historical cohort. Results: In total, 1161 patients were selected for the analysis. Ten years after the implementation of the Busan RCCVC project, the median door-to-balloon time was reduced from 86 (interquartile range [IQR], 64-116) to 54 (IQR, 44-61) minutes, and the median symptom-to-balloon time was reduced from 256 (IQR, 180-407) to 189 (IQR, 118-305) minutes (p<0.001). Inversely, the false-positive PCI team activation rate increased from 0.6% to 21.4% (p<0.001). However, the 1-year cardiovascular death and major adverse cardiac event rates did not change. Even after 10 years, approximately 75% of the patients had a symptom-to-balloon time over 120 minutes, and approximately 50% of the patients underwent inter-hospital transfer for primary PCI. Conclusions: A decade after the implementation of the Busan RCCVC project, although time parameters for early reperfusion therapy for STEMI improved, at the cost of an increased false-positive PCI team activation rate, survival outcomes were unchanged.

A Study on the Effective Implementation Methodology of Evolutionary Development in Defence Weapon System Research & Development Project (국방 무기체계 연구개발 사업에서 진화적 개발의 실효적 수행 방안에 관한 연구)

  • Kim, Jung Myong;Cha, Seung Hoon;Lee, Hye Jin;Yoo, Jae Sang;Choi, Sang Wook
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.1
    • /
    • pp.35-42
    • /
    • 2021
  • Recent defense R&D projects have been required as weapons systems applied with advanced technology considering exports. As a result, the complexity of the applied technology increases, and the risk of system development increases. Under these circumstances, an effectives method of performing evolutionary development for economical and timely deployment is presented. To this end, we hope that this study, which proposed the maintenance of related laws and measures for realistic and active evolutionary development, will help the R&D of the weapons systems.

INTEGRAL METHODS OF FUZZY AHP AND DSM FOR EVALUATION IN PARTITIONING DESIGN TEAMS

  • Lou Y. Liang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1036-1046
    • /
    • 2009
  • Many construction activities are related because they share the information of working methods and resources. Generally, the design information for coupled activities needs to be constantly collaborated in the different teams. To achieve the improvement in team collaboration, it is necessary to identify the relative coupled activities in the design teams. The activity and work partitioning arrangements are also required to accommodate the appropriate team members. This paper presents an integral method to be an evaluation in improving the collaboration for teams partitioning. A model, Team Partitioning Method (TPM) was developed to clarify the relationships between activities in a team. The results show the applicability of TPM model in team partitioning for design collaboration.

  • PDF

Analysis of the Changes in the Perceived Important Capabilities of Construction Project Managers after the Global Financial Crisis

  • Lee, Na-Kyung;Bae, Ju-Lee;Jang, Hyoun-Seung
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.8-16
    • /
    • 2012
  • After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

Improvement of Child Welfare Service Using Health Impact Assessment: A Case of the Cheongju Dream Start Center (건강영향평가를 통한 아동 복지서비스 개선: 청주시 드림스타트 센터 사례)

  • Kang, Eun-Jeong;Lim, Sung-Eun
    • Korean Journal of Health Education and Promotion
    • /
    • v.28 no.1
    • /
    • pp.115-130
    • /
    • 2011
  • Objective: This study aimed to introduce Health Impact Assessment using the case of a HIA on 2008 Dream Start Project in Cheongju. Methods: We followed the typical procedure of HIA recommended by the Merseyside Guidelines on HIA. In scoping, the steering committee decided 5 key domains of child health to be assessed: prenatal care, vaccination, nutrition, access to health care, and child abuse and also the methods of collecting the evidence. The HIA appraisal team collected information from various sources including literature, community survey, and focus group interviews. The HIA appraisal team also synthesized the collected information in terms of the nature of health impacts and equity and made recommendations accordingly. Results: Positive impacts were expected in prenatal care, vaccination, and nutrition, while negative impacts were expected in access to health care. The impact of Dream Start on child abuse was uncertain. Several recommendations were made and submitted to the Dream Start team for their consideration. About 2 years later, we found many of them were implemented in 2009 Dream Start project. Conclusion: HIA was found to be applicable and effective to make decision makers in the welfare sector consider health in their work.

The Characteristic of Wind Turbine Industry of the West-South Seashore of Leading Industry Development for Honam Economic Region (호남광역경제권의 서남해안 풍력산업 특성)

  • Cha, In-Su;Kim, Tae-Hyung;Lee, Ki-Bong
    • Proceedings of the KIPE Conference
    • /
    • 2010.07a
    • /
    • pp.101-102
    • /
    • 2010
  • This paper represents about the characteristics of wind turbine industry of the west-south seashore of Leading Industry Development for Honam Economic Region. These projects have 8 R&D and 3 non R&D project. The period of these projects is from October 2009 to April 2012. The R&D projects are composed three bright prospect products (1) the base construction of MW off-shore wind turbine components and system with Outer-rotor type PMSG, (2) the Development of 3MW wind power system with accommodation of the west-south seashore, and (3) the development of hybrid wind turbine system with wind base construction. Also, the non-R&D projects are composed three parts with above three bright prospect products. Above two projects support the companies with characteristic of low speed wind turbine system. Other project supports the companies related to wind turbine with small and medium capacity of form 3 kW to 10kW.

  • PDF