• 제목/요약/키워드: project team

Search Result 1,101, Processing Time 0.031 seconds

Case Study: PBL-Driven Healthcare Data Science Specialization and Learning Performance (사례연구: PBL기반 보건의료 데이터 사이언스 특성화교육과 학습성과)

  • Hwa Gyoo Park;Jong Ho Kim
    • Journal of Information Technology Services
    • /
    • v.22 no.1
    • /
    • pp.1-14
    • /
    • 2023
  • This paper aims to share the course, performance and implications of Project-Based Learning (PBL) education in healthcare data science (HDS). The HDS team of the business group of Soonchunhyang University, which was selected for the health care field of 'University Innovation Project', considered that the health care IT-based education of the current university differs greatly from the rapidly changing health care 3.0 environment of the fourth industry, and emphasized the PBL practice-oriented specialization program as a learning model. The PBL focused on self-directed learning experiences, real analysis problems, and team-oriented classes. In other words, it was implemented with three specialized strategies: 'Field Inside Education', 'Fusion-type Track Education', and 'Training to strengthen resilience and change response'. This collaborative, practical learning experience, etc. resulted in significant results. The results were recognized as being rated A by the Korea Research Foundation and the comprehensive evaluation, and the results were significantly elevated through the analysis of the student survey and the results index.

An Analysis of Learning Achievements in Team Project-Based Computer Programming Classes (팀 프로젝트 기반 컴퓨터 프로그래밍 수업의 학습 성과 분석)

  • Ahn, You Jung
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2020.01a
    • /
    • pp.257-258
    • /
    • 2020
  • 팀 프로젝트 기반 컴퓨터 프로그래밍 수업에서 팀의 동료 학습자들은 공동의 성과물을 얻기 위해 다양한 팀 활동을 하게 되며 그 과정에서 여러 학습 능력이 향상될 수 있다. 본 연구에서는 팀 프로젝트에 참여하는 학습자들이 팀 구성, 주제 선정, 프로젝트 계획서 작성, 역할 분담, 팀 단위의 프로그래밍 개발 활동 및 평가에 참여하는 과정에서 얻게 되는 학습 성과를 분석해보고자 한다. 팀 프로젝트 수행과 관련 있는 창의력, 협동 능력, 의사소통 능력 그리고 문제해결 능력에 대해 학습자들 스스로 얼마나 향상되었다고 느끼는지 조사분석하여 다음 학기 수업 운영 시 교수법 개선에 반영하고자 한다.

  • PDF

The global standard realizing process of the Automobile Assembly Facility

  • Nashimoto, Tomoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.24-25
    • /
    • 2015
  • To realize the global standard of the assembly facility, one of key point is an influence of local characteristic. The global standardized information could be a useful input, especially at the beginning stage of the project. The content should be carefully checked against local requirements, in order to develop an Assembly Facility design to meet local regulations & characteristics. The level of input information required in each step is different depend on regions & countries. At an execution stage of the project, the global standard input needs to be updated as customized final input for the construction. There will be many issues to be clarified and coordinated so that the Assembly facilities meet the final requirements for the production technology. As a result, it is important to understand the timing to use the global standard information and the contents what is needed to adapt to the local characteristics. And close collaboration between production technology team and facility team is always required.

  • PDF

Problems and Solutions for the Private-funded Railroad Station Project Management (철도 민자역사 사업수행체계 개선방안)

  • Park Chan-Sik;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.172-180
    • /
    • 2004
  • Recently, there are growing concerns on the introduction of private financing in railroad station construction project. But private-funded station project does not have the efficient delivery system. This study is focused on the recommended solutions about the private-funded station project management. Through the literature survey and interview, it is investigated and analyzed that project management has the problems. The problems are classified as 2 areas: law & regulations and job practice. The problems in law & regulations are a lowing on the profitability, and an unreasonable project team selection process. Job practice has problems such as delaying in authorization process, and inferior feasibility analysis. The study suggests several recommended solutions related to the problem areas. That are as follows: the efficient return of investment system, the project financing system, the professional project management, the benchmarking team operation, and the cut down on discussion period

Action to Improve the Reliability of Production Planning

  • Kim Daeyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.139-144
    • /
    • 2002
  • Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.

R&D Project Team Diversity and Team Performance : Investigating the Moderating Effect of Innovative Problem Solving Style and Interdependence (R&D 프로젝트 팀 다양성과 팀 성과간의 관계: 제해결스타일 및 상호의존성의 조절효과)

  • Park, Owwon
    • Journal of Korea Technology Innovation Society
    • /
    • v.16 no.4
    • /
    • pp.913-936
    • /
    • 2013
  • As diversity has getting its significance, recent research on diversity has moved the focus from direct effects of diversity on performance to moderating effects between the two. In this paper, I analyzed the moderating effects of the innovative problem solving style and three types of interdependence (i.e., task, goal and outcome) on the relationship between diversity and performance. Empirical results using 75 project teams of R&D institute showed that the innovative problem solving style positively strengthened the effect of diversity on performance. All three types of interdependence also amplified the relationship between diversity and performance. I addressed theoretical and practical implications, and future research directions.

  • PDF

Introduction of Integrated Management of Satellite Imagery Information

  • Chae, Gee-Ju;Yoon, Geun-Won;Hwang, Tae-Hyun;Park, Jong-Hyun
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.197-201
    • /
    • 2002
  • The high prices of satellite images prevent researchers from studying remote sensing and most non-professional people doesn't have the simple and easy solutions for the manipulation of satellite images. "Integrated Management of Satellite Imagery Information" project which will be promoted by ETRI (Electronics and Telecommunications Research Institute) will provide the solutions for the above mentioned problems. We will introduce the archiving center in this study. This includes the data construction, storage, management and distribution. We first review the background for this archiving center and introduce the interior and foreign institutes which archive and distribute satellite images. We review our H/W system and S/W system briefly. Finally, the further service of our project will be suggested. Since we will distribute the satellite images (Landsat, SPOT, JERS, Corona, Kompast-1) and will receive Landsat7 ETM+ in 2003 you, this will help the professional work dealing with the satellite image and attract the non-professional people for simple and easy manipulation solutions of satellite image.

  • PDF

Comparison of Field Monitoring System in case of Automatic and Manual Type Executed in Urban Deep Excavation Site (도심지 대규모 굴착공사에서 수행된 자동계측과 수동계측의 비교 사례)

  • Kim, Tae-Seob;Chung, Won-Hong;Kim, Hyun-Mo;Kim, Woong-Kyu;Jung, Chang-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1216-1223
    • /
    • 2008
  • Displacement control of earth retaining wall is recognized as the most important item for insuring the stability of ground in urban deep excavation site near by major structure such as subway etc. The field monitoring system is classified by two types as manual system and automatic system. The application case of latter type of field monitoring is increased because real time measurement is possible in automatic system and that is correspondent with the recent constructional trend. Though the automatic monitoring system is more useful and advanced than manual monitoring system, accuracy of the system is not verified sufficiently. It was examined that the reliance of automatic monitoring system in this paper through the comparison of monitoring result obtained three urban excavation site in which the each type of monitoring system was executed concurrently. Result of the examination is that the two types of monitoring system is generally alike in view of monitoring result, so the engineering reliance of automatic system was confirmed in case site. This task was researched in restricted case site, it is expected more precise analysis from security of more data monitored and progressive study.

  • PDF