• Title/Summary/Keyword: project size

Search Result 917, Processing Time 0.032 seconds

Real Time SW Sizing Model for FP-Based Fintech Software Development Project (FP 기반의 핀테크 소프트웨어 개발 프로젝트 실시간 규모 산정 모델)

  • Koo, Kyung-Mo;Yoon, Byung-Un;Kim, Dong-Hyun
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.10
    • /
    • pp.36-44
    • /
    • 2021
  • Estimation on SW Sizing applied to fintech is very difficult, a task requiring long time, it is difficult for client companies and developer companies to accurately calculate the size of software development. The size is generally estimated based on the experience of project managers and the general functional scoring method. In this paper, propose a model that can be applied to fintech development projects by quantitatively calculating the required functions from the user's point of view, measuring the scale, and calculating the scale in real time. Through the proposed model, the amount of work can be estimated prior to development and the size can be measured, and the M/M and the estimated quotation amount can be calculated based on the program list by each layer. In future studies, by securing size computation data on existing the Fintech Project in mass, research on accurate size computation would be required.

Analysis of the Effectiveness of Government Support Project of Excellent Manufacturing Innovation Companies from the Perspective of Growth Ladder (성장사다리 관점에서의 우수제조혁신기업의 정부지원사업 효과성 분석)

  • Chan-Woo Jeong;Hae-Soo Lee;Byoung-Gi Kim;Myung-Jun Oh
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.spc
    • /
    • pp.19-30
    • /
    • 2023
  • Recently, the government has provided support such as entering new markets, expanding sales channels, and supporting manpower, not just in the form of funding, to efficiently and effectively support limited national resources to improve corporate performance. In this study, we tried to find out the effect of government support for companies that have benefited from the Excellent Technology Research Center Project (ATC Project) and the World Class 300 project using propensity score matching. As a result of the analysis, the effect of government support for the ATC project became visible after the appointment period, while the effect of the World Class 300 project was insignificant. This means that when the size of the company is small, the effect of government support is more pronounced. This suggests that in order to maximize the effectiveness of government support, appropriate national policy interventions such as government innovation funding are needed when the size of the company is small. In this study, differences in the timing, performance indicators, and company size of policy support effects were found in the growth stage of a company from a mid- to long-term time series perspective, suggesting that support policies based on this need to be adjusted and redesigned.

Implementation of Customized EPM for Collaborative Resource Procurement in Small and Medium Size Plant Construction Enterprises (중소플랜트기업의 협업자원조달을 위한 Customized EPM구현)

  • Nam, Jung-Tai;Kim, Sung-Hun;Han, Young-Geun
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.133-141
    • /
    • 2008
  • The need for total enterprise management that covers from accepting orders, design, cost, procurement, manufacture, and delivery has been recently raised in order for efficient project management of small and medium size plant construction enterprises. This trend is reflected in the introduction of EPM(Enterprise Project Management) solutions by some shipbuilding enterprises and large construction corporations. In step with the trend, small and medium size plant construction enterprises are enabled to provide knowledge base in terms of reducing cost and production period and managing portfolio for accepting orders and attaining contract by inducing customized EPM This study presents a design of customized EPM based on a case study of a company. It exhibits a collaborative/collaboration resource-supply model which can be universally applied to small and medium size job-order production enterprises. The research discusses that under the assumption that information is shared internally between departments on planning, supply, manufacture, and quality control in order to create collaborative environment and close participation is created externally between suppliers and orderers, productivity can be improved in cost reduction through planning efficient collaborative supply model.

A Comprehensive Analysis of 3D Body Scanning vs. Manual Measurements in a Large-Scale Anthropometric Survey -Insights from the 8th Size Korea Project- (대규모 인체치수조사 사업에서 3차원 측정치와 직접측정치의 차이 분석 -제8차 사이즈코리아 사업을 중심으로-)

  • Sunmi Park
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.48 no.2
    • /
    • pp.233-253
    • /
    • 2024
  • This study analyzed differences between three-dimensional (3D) body scanning and manual measurements, aiming to assess whether 3D scanning can replace traditional anthropometric tools, such as tape measures and calipers. Data from 4,478 participants in the 8th Size Korea Project were analyzed, covering 43 measurement items. Since Given that the 3D and manual measurements were performed on the same subjects in the 8th Size Korea Project, it was possible to determine the correlation more accurately between the two measurement methods more accurately. Using Applying ISO 20685-1(2018) standards, 15 out of the 43 items fell within allowable error limits. When classified into six types, "small circumferences" and "segment lengths" showed averages of 3.35 mm and 3.10 mm, respectively, within acceptable range. "Body heights" and "body depths" slightly exceeded the limit, with averages of 5.28 mm and 6.58 mm. "Body widths" and "large circumferences" surpassed the limit, with means of 16.77 mm and 16.18 mm. The study offers an objective basis to for validate validating 3D measurements' measurements' reliability and accuracy, addressing various industries' needs for information on the human body's dimensions information.

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

A Study on the Critical Success Factors for the Efficient Management of Defense Acquisition Program (효율적인 무기체계 획득을 위한 사업 관리 핵심성공요인 연구)

  • Jeon, Nam-Hee;Kim, Byung-Sam;Kim, Dong-Ho;Gim, Gwang-Yong
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.2
    • /
    • pp.53-69
    • /
    • 2010
  • The long-term purpose of Military Acquisition Program Management (MAPM) is to fulfill requested performance, budget, and timing of military capability building. The Defense Acquisition Program Administration was established in 2006 and it adopted Integrated Control System. Moreover, there have no much studies done to examine the condition of Defense Capability Improvement Project in Korea through an empirical research although there are sixty one organizations are operating currently under Defense Capability Improvement Project. The objective of this study is to recognize Military Acquisition Program Management as a single project and to critically review relationship between Critical Success Factors (CSF) and Military Acquisition Program Management. Accordingly, three determinants to lead to successful Military Acquisition Program Management are "Communication" "User Participation" and "User Requirement." This study also demonstrates that Critical Success Factors have distinctive influences on successful Military Acquisition Program Management based on characteristic, size and phase of project. In retrospect, it is meaningful that Integrated Project Team (IPT) could classify priority of management according to characteristic, size and phase of project in the course of implementation.

Trend Analysis for Risk Management of Construction Project using P.M.I. Techniques (P.M.I. 기법을 이용한 국내 건설업체 리스크관리 실태 분석)

  • 정병화;정영식
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.115-122
    • /
    • 2001
  • Recently construction enterprises involves more occurred with increase of size and complxity of construction works. Risk management is one of the key project management process. Numerous tools are available to support the various phases of the risk management process. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and in effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are mon likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

  • PDF

A Study of Optimal Effort Allocation over Software Development Phase (소프트웨어 개발노력 치적 분배에 관한 연구)

  • Lee, Sang-Un;Kim, Young-Soo;Han, Pan-Am
    • The KIPS Transactions:PartD
    • /
    • v.9D no.5
    • /
    • pp.865-876
    • /
    • 2002
  • Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort varies according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differs from one project to another. This paper suggests models for effort allocation in planning, specifying, building, testing and implementing phases followed by the project size and development types. These models are derived from 155 different projects. Therefore, these models can be considered as a practical guideline in management of project schedule and effort allocation.

An Analysis on the Employment Determinants of University Graduates in NURI Project Teams -the Case of the Universities in Busan Region- (누리사업단 대학졸업자의 취업결정요인 분석 - 부산지역대학의 사례 -)

  • Jun, Hyunjoong;Ryu, Jangsoo;Cho, Jangsik;Park, Sungik;Kim, Jonghan
    • Journal of Labour Economics
    • /
    • v.32 no.1
    • /
    • pp.31-56
    • /
    • 2009
  • This paper analyzes the determinants of the employment status of the NURI-project-teams' college and university graduates in Busan area. The major results are as follows: First, education level, household income, grade point average and certificate turn out to be significant variables to decide employment or spell of unemployment. Second, parents' education level, household income, the size of project team, the firm size are shown to affect employment in Busan. In particular, the bigger the firm is, the probability of getting job in Busan is getting smaller. And there are two sides of provincial university graduates' moving into the Metropolitan area; the voluntary move and the involuntary move. Third, sex., education level, major, grade point average, the size of project team etc, are found to be significant determinants of wage level.

  • PDF