• 제목/요약/키워드: project process

검색결과 4,130건 처리시간 0.034초

Plan of Sapti Community Garden-Park by Design Charrette

  • Lee, Kyoungjin;Sung, Junghan
    • 휴양 및 경관연구
    • /
    • 제12권4호
    • /
    • pp.79-90
    • /
    • 2018
  • Yesan-gun was selected to receive a "Village Community Garden Project" in 2018 to foster a sense of community and improve the urban landscape by working with neighbors to create a happy living space for residents. Yesan-gun selected Sapti Park, located in Yesan-eup, as the project site. The project was carried out through the design charrette method (an intense period of collaborative creativity) to allow residents to propose and design park concepts themselves for the community garden construction project to ensure that that the park facilities would provide something for everyone to enjoy. This study followed the actual design project that actively introduced the design charrette in planning the community garden, describing the entire design process from planning to construction and revealing how the opinions of residents were projected onto the design drawings. The purpose of the project was to advance user-participation design methods by reviewing the progress of the design charrette process and to examine how storytelling, the act of conveying ideas through a fun and persuasive story, transformed the plans for the community garden.

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

C-PLM: 토목 프로젝트 관리를 위한 PLM 시스템 설계 및 구축 (C-PLM: Design and Implementation of a PLM System for Effective Management of Civil Projects)

  • 강형석;이상석;노상도;이광명
    • 한국CDE학회논문집
    • /
    • 제15권2호
    • /
    • pp.124-135
    • /
    • 2010
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of constructions to design C-PLM system which is a PLM system for effective management of civil project and engineering activities. Also, we implement C-PLM system based on commercial PDM system, and applied it to civil project as case studies.

경량전철사업의 시스템엔지니어링 적용 실태분석 연구 (A Study on the Analysis of SE Process Implementation for the Light Rail Transit Project)

  • 김철환;한명덕;이재홍
    • 시스템엔지니어링학술지
    • /
    • 제8권2호
    • /
    • pp.1-10
    • /
    • 2012
  • This paper aims to analyze the result of SE Process Implementation on Light Rail Transit(LRT) Project. Currently the Light Rail Transit Project of Korea applies SE to the intermediate phase, that is, E&M phase which is a manufacturing and designing procedure. More seriously, the application effect of SE is not remarkable because it applies to some specific engineering fields like RAMS and it depends on superficial consulting of foreign companies with low SE support capability and investment capital. This study points out that the "Requirement Analysis" and "System Alternative Review" has not been conducted from the initial phase (basic plan and basic design) of the LRT projects. Several projects indicate that the amount of investments for SE activities through the Korea LRT project is relatively very small in comparison with the global capital which is about 10% of total project budget. Furthermore, Korea LRT projects have very few SE professionals and weak SE organization with no government directions and guide book for the efficient implementation of SE for the LRT projects.

철도종합안전기술개발사업의 성과물 검증 프로세스 구축 (Construction of verification process for the railway total safety technology development project)

  • 윤혁진;한순우;김상암;최경진;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1187-1192
    • /
    • 2007
  • Recently, many organizations such as, including government, railroad operational, railroad facilities managemental and research authorities have made a lot of efforts to identify and prevent hazards from leading to accidents and solve them all over the railroad industry. Railroad total safety technology development project conducted as one of national R&D projects has established business formation structure based on system engineering as an effort to define and give a solution to facing problems in the field of railroad. This paper is building procedures to verify the outcomes derived from this project. The verification process is the one for verifying the outcome produced in the final stage of the project or during the project. It makes sure that the system is satisfying the system requirements through verification of the outcomes produced after conducting the project for verification. We've made verification plan for technically reasonable verification using verification process developed through this research, and established master verification plan in the level of 15 detailed projects for interim and final outcomes produced.

  • PDF

군용항공기 연구개발 사업의 리스크 관리 (Risk Management for R&D Projects in the Military Aircraft Systems)

  • 김성훈;이현철
    • 산업경영시스템학회지
    • /
    • 제44권4호
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링 (3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique)

  • 와카스 아샤드 타놀리;하스나인 라자;이승수;박상일;서종원
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 - (Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project)

  • 최미희
    • 환경영향평가
    • /
    • 제11권2호
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

공공 소프트웨어 프로젝트의 관리 행태에 관한 탐색적 연구 (An Exploratory Study on the Management Behavior of the Public Software Project)

  • 김용경;김필중
    • Journal of Information Technology Applications and Management
    • /
    • 제13권4호
    • /
    • pp.237-255
    • /
    • 2006
  • This study was exploratively performed to demonstrate the management behavior of the public software project in korea. In this study, 167 auditing reports on the public software project which were carried out during $1999{\sim}2003$, were employed and surveyed. Survey reveals that quality management was the most neglected in process of software project management relative to other 12 management areas. And configuration management, risk management, time management, and scope management follow up in order in its vulnerability in software project management.

  • PDF