• 제목/요약/키워드: project effectiveness

검색결과 853건 처리시간 0.028초

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

지속가능한 친환경농업을 위한 광역친환경농업단지의 발전방향 (Developing Strategies of the Large-scale Districts for a Sustainable Environment-friendly Agriculture)

  • 김호;양성범
    • 한국유기농업학회지
    • /
    • 제23권2호
    • /
    • pp.233-245
    • /
    • 2015
  • The objective of this study is to analyze the properness, effectiveness and sustainability on the large-scale environment-friendly agricultural districts (LEAD). For this, we survey 11 public officers who manage the LEAD. Most of them aware necessities of LEAD project. They have a higher satisfaction and think that the project affect ripple effect and contribution on environment-friendly agriculture. Main performance expected of the LEAD project is a spread of natural circulation agriculture in connection with cultivation and stockbreeding. For continuance of environment-friendly agriculture after the project, it is necessary to find markets of products. Also policy making related with environment-friendly agricultural technique is required. The results of this study show that the LEAD project need a modification based on field and change of agricultural issues.

학교도서관 활성화 사업의 추진 현황 분석 및 평가연구 (An Evaluation Study on the School Library Revitalization Project)

  • 노영희;홍강표
    • 한국문헌정보학회지
    • /
    • 제41권1호
    • /
    • pp.243-271
    • /
    • 2007
  • 본 연구는 2006년에 추진된 학교도서관 활성화 사업의 분석 평가를 통해 사업 진행의 안정성과 향후 사업 방향을 제시하는데 목적이 있다. 본 연구의 목적을 달성하기 위한 연구 내용은 학교도서관 활성화 사업의 종합적인 분석을 위해 사업 1차년도부터 4차년도까지의 현황을 연도별로 분석하면서 사업의 성과를 알아보고자 하였으며, 사업 마무리해인 2007년도에 중점적으로 추진해야 할 부분을 발견해 내고자 하였다.

최소자승몬테카를로 시뮬레이션을 이용한 풍력발전설비 투자계획 (Economic Assessment of a Wind Farm Project Using Least Square Monte-Carlo (LSMC) Simulation)

  • 김진아;이종욱;이재희;주성관
    • 전기학회논문지
    • /
    • 제60권1호
    • /
    • pp.32-35
    • /
    • 2011
  • The economic value of a wind farm project is influenced by various risk factors such as wind power output and electricity market price. In particular, there is uncertainty in the economic evaluation of a wind farm project due to uncertain wind power outputs, which are fluctuated by weather factors such as wind speed, and volatile electricity market prices. This paper presents a systematic method to assess the economic value and payback period of a wind farm project using Least Square Monte-Carlo (LSMC) simulation. Numerical example is presented to validate the effectiveness of the proposed economic assessment method for a wind farm project.

LINC사업의 기업지원 프로그램에 대한 만족도와 효과성에 대한 융·복합 영향요인 연구 (A study on converged influence factors with regard to satisfaction and effectiveness of the programs to support enterprises proceeding with LINC project)

  • 여석호
    • 디지털융복합연구
    • /
    • 제14권11호
    • /
    • pp.13-26
    • /
    • 2016
  • LINC 사업의 기업지원 프로그램에 대한 성과를 측정하기 위하여 기업의 만족도와 효과성 인식에 관한 유의성과 이에 대한 영향요인을 알아보았다. 이를 위하여 설문 방법을 활용 하였으며 설문 변수를 가설에 따라 연구모형을 정리한 다음 검증하였다. 분석결과 기업지원 프로그램에 대한 만족도와 효과성은 유의한 것으로 나타났으며, 프로그램에 대한 참여도가 높은 기업과 대학의 행정체계가 우수할수록 만족도가 높았다. 본 연구로 기업지원 프로그램에 대한 참여도와 대학의 행정체계는 만족도와 효과성에 융복합 영향요인으로 연구결과가 나타났다. 다만, 본 연구에서는 효과성 측정을 설문에만 의존하였는데 이후에는 참여기업의 매출액 추이를 분석한 보다 발전된 연구가 계속 되기를 바란다.

공학중심의 융합프로젝트 교수학습모형의 교육적 효과 (Educational Effects of an Instructional Model for Engineering-Centered Convergence Project)

  • 최지은;진성희;김학일
    • 공학교육연구
    • /
    • 제21권1호
    • /
    • pp.3-13
    • /
    • 2018
  • The purpose of this study is to propose a teaching and learning model that can effectively manage convergence education, which is one of the concerns of university education, at the level of course. The pre-collaborative instructional design stage is to prepare the operation of the convergence project course. It shares the common goal and establishes a team of relevant professors to set up the actual convergence project topic and establishes cooperation relationships with industry or community as needed. In the convergence project activity, students will be able to understand the learning objectives, learning activities, evaluation methods, and explain the subject of the convergence project by proceeding with the whole orientation. Students organize teams of interest and conduct learning and design activities on convergence technologies and present their results. In the educational improvement activities, professors will share the lesson process and results and discuss improvements through the improvement seminar. As a result of analyzing the effectiveness of the proposed convergence project based teaching and learning model, the convergence project experience has improved the cooperative self - efficacy for the learners and the results were confirmed that students perceived to achieve the expected learning goal and satisfied with their experience.

농촌 고령자 공동시설지원 시범사업 주민만족도 조사 연구 (A Study on the Inhabitant's Satisfaction of Community Facilities Demonstration Project for Rural Elderly)

  • 김진환;박중신;송서호
    • 한국농촌건축학회논문집
    • /
    • 제17권4호
    • /
    • pp.9-16
    • /
    • 2015
  • This study examined the current conditions of the community facilities constructed by demonstration project for rural elderly that were promoted for the last two years by the ministry of agriculture, food and rural affairs. The type of community facilities are community living home, community food service facility and small bath house. And it was accomplished satisfaction survey for analyzing the effects of demonstration project focused on inhabitants and users of community facilities constructed by demonstration project. The results are as follows. First, The satisfaction index of community facilities was evaluated high level in generally. Second, Inhabitants and users of facilities were presented high level satisfaction in humanity sector, especially. Third, It should be to establish maintenance and management plan such as supporting of linkage program and operation cost for secure the sustainability. Consequently, the implementation of community facilities demonstration project to improve the living conditions of rural elderly is entirely appropriate. The results of this study were considered to promoting demonstration project for improving quality of the facilities and securing effectiveness of the project.

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • 차희성
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.

Assessing Critical Quality Metrics for Successful Baseline Construction Scheduling

  • Bivans, John;Choi, Jin Ouk
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1241-1241
    • /
    • 2022
  • In the current construction industry, difficulty arises in creating an adequate baseline schedule to establish a fundamental plan for construction. This presentation will present the research findings which investigated industry-recognized schedule metrics that aid in the successful implementation of said schedule. Industry organizations (Association for the Advancement of Cost Engineering, the Government Accountability Office, the Project Management Institute, and local city, state, and county government offices) provide standardized guidelines with specific metrics requirements to ensure successful implementation. However, most of those metrics are substantiated or validated in their effectiveness. The study examined the impact between these industry-recognized critical metrics and three distinct scheduling characteristics: Project Type, Project Duration, and Project Density (number of activities within a schedule). The research results showed that, among the 12 various schedules evaluated in parallel with 20 industry-recognized critical metrics, seven metrics substantially demonstrate a significant impact on a project schedule's success. Furthermore, six of the seven metrics directly correlate to at least one of the three scheduling characteristics outlined. As a result, this research has established more predictable outcomes based on impacts between three distinct project characteristics and 20 of the most discussed/researched critical scheduling metrics in the field. This allows management teams to have more confidence in establishing critical milestones and accurate turnover dates from the start of the project through its final completion.

  • PDF

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF