• 제목/요약/키워드: project effectiveness

검색결과 855건 처리시간 0.029초

Development of an Algorithm for the Automatic Quantity Estimation of Wall Rebar

  • Kim, Do-Yeong;Suh, Sangwook;Kim, Sunkuk;Lwun Poe Khant
    • 한국건설관리학회논문집
    • /
    • 제24권5호
    • /
    • pp.83-94
    • /
    • 2023
  • In order to devise a rebar usage optimization algorithm, it is necessary to calculate the exact rebar length and revise the arrangement of rebars into special lengths. However, the process of rearranging numerous rebars and manually calculating their quantities is time-consuming and requires significant human resources. To address this challenge, it is necessary to develop an algorithm that can automatically estimate the length of rebars and calculate their quantities. This study aims to create an automatic estimation algorithm that improves work efficiency while ensuring accurate and reliable calculations of rebar quantities. The algorithm considers various factors such as concrete cover, hook length, development length, and lapping length, mandated by the building codes, to calculate the quantity of rebars for wall structures. The effectiveness of the proposed method is validated by comparing the rebar quantities generated by the algorithm with manually calculated quantities, resulting in a difference rate of 1.14% for the hook case and 1.37% for the U-bar case. The implementation of this method enables fast and precise estimation of rebar quantities, adhering to relevant regulatory codes.

Enhancing Occlusion Robustness for Vision-based Construction Worker Detection Using Data Augmentation

  • Kim, Yoojun;Kim, Hyunjun;Sim, Sunghan;Ham, Youngjib
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.904-911
    • /
    • 2022
  • Occlusion is one of the most challenging problems for computer vision-based construction monitoring. Due to the intrinsic dynamics of construction scenes, vision-based technologies inevitably suffer from occlusions. Previous researchers have proposed the occlusion handling methods by leveraging the prior information from the sequential images. However, these methods cannot be employed for construction object detection in non-sequential images. As an alternative occlusion handling method, this study proposes a data augmentation-based framework that can enhance the detection performance under occlusions. The proposed approach is specially designed for rebar occlusions, the distinctive type of occlusions frequently happen during construction worker detection. In the proposed method, the artificial rebars are synthetically generated to emulate possible rebar occlusions in construction sites. In this regard, the proposed method enables the model to train a variety of occluded images, thereby improving the detection performance without requiring sequential information. The effectiveness of the proposed method is validated by showing that the proposed method outperforms the baseline model without augmentation. The outcomes demonstrate the great potential of the data augmentation techniques for occlusion handling that can be readily applied to typical object detectors without changing their model architecture.

  • PDF

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

Virtual Reality Safety Training on Multiple Platforms

  • Bao, Quy Lan;Tran, Si Van-Tien;Nguyen, Truong Linh;Park, Chansik
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1187-1193
    • /
    • 2022
  • A construction site is a highly complex and constantly changing environment, where hazardous areas are difficult to detect if workers lack sufficient knowledge and awareness. Thus, frequent worker safety training is required. Numerous studies on using virtual reality (VR) for safety training were published. While they demonstrate the potential for improving the skills necessary to avoid accidents in the construction industry, they remain difficult to apply at actual construction sites. VR requires specialized hardware and software, limiting workers' access and restricting workers' participation in training sessions. As a result, this paper proposes multiple platforms for immersive virtual reality safety training (VRMP) based on Industry Foundation Classes (IFC) and web technologies such as immersive web (WebXR). The VRMP is compatible with mobile and desktop devices currently by workers and demonstrates scenario models familiar to workers. Also, it reduces development time by utilizing Building Information Models (BIM). Additionally, The VRMP collects data from workers in a virtual environment to assess each worker's safety level, assisting workers in effectively and comfortably gaining a better understanding and raising their awareness. This paper develops a case study based on the VRPM in order to assess its effectiveness.

  • PDF

Clinical evaluation of Laser-Assisted New Attachment Procedure® (LANAP®) surgical treatment of chronic periodontitis: a retrospective case series of 1-year results in 22 consecutive patients

  • Raymond A. Yukna
    • Journal of Periodontal and Implant Science
    • /
    • 제53권3호
    • /
    • pp.173-183
    • /
    • 2023
  • Purpose: Treatment for periodontitis has evolved over the years as new technologies have become available. Currently, lasers seem attractive as a treatment modality, but their effectiveness needs to be verified. The purpose of this project was to evaluate Laser Assisted New Attachment Procedure® (LANAP®) surgery as a single treatment modality. Methods: As part of a mandatory training program for periodontists and other dentists, 22 consecutive patients diagnosed with moderate to severe periodontitis (probing depth [PD] up to 11 mm) were treated with the LANAP® surgical approach using a 1064-nm Nd:YAG laser as part of a multi-step protocol. Following single-session active therapy, they were entered into a maintenance program. Their clinical status was re-evaluated at 12-18 months following surgery. Results: All 22 patients completed the 12- to 18-month follow-up. PD, clinical attachment level, and furcation (FURC) showed substantial improvement. Recession was minimal (mean, 0.1 mm), while 93.5% of PD measurements were 3 mm or less at re-evaluation. Furthermore, 40% of grade 2 FURC closed clinically. Conclusions: Within the limits of this case series, LANAP® was found to be an effective, minimally invasive, laser surgical therapy for moderate to advanced periodontitis.

Research on Facility Layout of Prefabricated Building Construction Site

  • Yang, Zhehui;Lu, Ying;Zhang, Xing;Sun, Mingkang;Shi, Yufeng
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.42-51
    • /
    • 2017
  • Due to the high degree of mechanization and the good environmental benefits, the prefabricated buildings are being promoted in China. The construction site layout of the prefabricated buildings has important influence on its safety benefit. However, few scholars have studied the safety problem on it. Firstly, in order to give a follow-up study foreshadowing the characteristics of prefabricated buildings are analyzed, the research assumptions are given and three types of safety buffers are established. And then a mult-objective model for the prefabricated buildings site layout is presented: taking into account the limits of noise, the coverage of the tower crane and the possibility of exceeding boundaries and overlapping, the constraints are and designed established respectively; Based on the improved System Layout Planning (SLP) method, the efficiency\cost\safety interaction matrices among the facilities are also founded for objective function. For the sake of convenience, a hypothetical facility layout case of the prefabricated building is used, the optimal solution of that is obtained in MATLAB with particle swarm algorithm (PSO), which proves the effectiveness of the model presented in this paper.

  • PDF

Critical Assessment of Programme-Based Conflict Resolution Model Applied to Multiple Stakeholders Within The Context of Industrialized Building Production and Life Cycle Supply Chain System

  • Tanaka, Koji
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.551-562
    • /
    • 2022
  • The building production system has been analysed by the dichotomy "employer-contractor" relationship, which failed to take into account of the role and function of multiple stakeholders within the life-cycle supply chain. This is further observed in the current conflict resolution model, which, in my argument, struggles to contribute to industrialize the building production and achieve better efficiency and effectiveness as expected. The purpose of this paper is to critically assess the issues of current programme-based conflict resolution model, and discuss alternative models how they can be modelled and applied to the construction projects. The conclusions of findings are; First, the current model is framed around the contracts and dispute resolutions based on the legal concept of "claimant and respondent" where one party(s) advances a claim once and the other(s) objects, as such it fails to reflect the nature of construction projects where multiple stakeholders are involved concurrently and for a long period of life-cycle of buildings. Second, an alternative is "Six-stakeholders model" which represents the multiple stakeholders and clarifies the flow of obligation-liability-monetary relationships among participants for a long period of life-cycle of buildings. Further, with reference to both historical and recent cases, a reflection and insight into pros and cons of programming method is added, especially as to why this method is considered to have become a mandate of the modern construction management, and how academics and practitioners should deal with it more cautiously and prudently.

  • PDF

City Gas Consumption Analysis per 1m2 according to Exclusive Dwelling Area in Residential Buildings - Focused on case of Ulsan -

  • Yu, YeongJin;Kim, Sangho;Yang, SungPil;Son, Kiyoung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.734-735
    • /
    • 2015
  • Currently, effective energy management of buildings is necessary because of accelerated global climate change and resource crisis. Especially, in the case of South Korea, city gas consumption occupies 11.8% of the total energy and 39.6% is residential use among them. Therefore, for reducing the city gas consumption, the effectiveness of residential use is needed. To address this issue, the objective of this study is to analyze the difference of the city gas consumption according to the space arrangement in the apartment building. To achieve this objective, an apartment complex having over 1,000 households was selected then, according to the space arrangement such as south-east and south-west, the data of 59.97m2 and 84.96m2 were analyzed by using statistics method. As a result, in 59.97m2 and 84.96m2, the total city gas amount in 2012 showed that 9.2% and 8.4% were more increased at south-west than southeast respectively. In the future, the findings of this study can be used to develop the prediction model of city gas consumption in apartment building.

  • PDF

Feasibility of Applying Mixed-Reality to Enhancing Safety Risk Communication in Construction Workplaces

  • Olorunfemi, Abiodun;Dai, Fei;Peng, Weibing
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.225-234
    • /
    • 2017
  • Mixed-reality technologies have proven to be valuable in many architecture, engineering and construction / facilities management (AEC/FM) applications. However, its potential of being adapted to facilitate hazard identification and risk communication in construction workplaces has yet to be fully explored. This paper makes an attempt to evaluate the feasibility of applying mixed-reality to enhancing safety risk communication in construction workplaces. Experiments have been designed in which Microsoft HoloLens® together with a developed application will be used to intervene in the practice of jobsite risk communication. A cross-sectional survey will then be followed to examine the effectiveness and acceptability of this technology through analysis on data collected from participants in the construction industry. The preliminary results show that this emerging HoloLens® technology, compared to the traditional communication methods (i.e., phone calls, walking up people and talk, and video conferencing), facilitates accurate, prompt safety communication on construction sites. Such findings signify the potential of applying mixed-reality to safety performance enhancement in the construction industry.

  • PDF

The effectiveness of HMD-based virtual environments through 3D camera for hotel room tour

  • Kim, Ki Han;Lee, Junsoo;Koo, Choongwan;Cha, Seung Hyun
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.117-121
    • /
    • 2020
  • Many of hotel customers obtain information from hotel websites to find the best alternative. One of the crucial information for the choice is spatial/visual information of hotel rooms. However, hotel website provides photographs only showing representative room features that may not be sufficient to give a full understanding of hotel room to customers. HMD-based 3D virtual environments (HVE) created by 3D camera could improve customers' experiences of hotel rooms by providing full virtual tours of hotel rooms. However, to the best of our knowledge, whether HVE can adequately provide similar customers' perception on spatial/visual information remains unproven as physical hotel rooms. The present study thus aims to verify how similar and reliable information on physical hotel room HVE provides to hotel customers in comparison with hotel website with 2D photograph and display-based 3D virtual environment. For this purpose, this study conducted a comparative experiment to investigate perception of three environments. As a result, the study found that HVE is more effective to provide spatial/visual information as similar as an actual hotel room. In addition, HVE increases customers' perceptions towards the reliability of information, the quality of hotel room and intention to book.

  • PDF