• Title/Summary/Keyword: project cost

Search Result 2,429, Processing Time 0.035 seconds

Rehabilitation Ecology by Revegetation: Approach and Results from Two Mediterranean Countries

  • Martin, Arnaud;Khater, Carla;Mineau, Herve;Puech, Suzette
    • The Korean Journal of Ecology
    • /
    • v.25 no.1
    • /
    • pp.9-17
    • /
    • 2002
  • Human activities greatly affect the environment causing its degradation. Urban development and road networks construction cause main impacts on ecosystems and particularly on vegetation cover: road constructions induce complete degradation of the vegetation cover and often leaves a hare land, sometimes without even a soil cover. Reconstitution of vegetation cover is necessary to limit superficial erosion and land slipping on the road, towards a reintegration of the site in the neighbouring landscape. Many approaches have been studied over the last 30 years aiming at this reconstitution of vegetation cover. At frost, the main purpose of land reclamation was to create a new ecosystem. At this time, the environment created was rather a "garden" with a new soil adapted to the plantation of "decorative" species. Then, in early 90′s many studies on the restoration ecology concept rather focused on adapting the vegetation to the existing conditions on the site, as in a side road embankment for example. Nowadays, we notice a large tendency towards the use of such adapted native species instead of industrially produced seeds. In southern France, our team have led research on the potentials of those local species for their use in revegetation processes with hydro-seeding. We therefore developed an approach combining the use of different types of species: Industrially produced, native and wild cultivated species. This method integrates the benefits of using available low costing seeds that are already used on large scale projects with better adapted species, issued form the cultivation of native species and seed production for their use on smaller scale and more costly but more effective results. The use of wild cultivated species seeds was developed in order to limit the cost and reduce harsh natural seed withdrawal in the natural environment In the case of the use of native species. Besides, the use of such seeds allowed a larger geographical scale of use than with local native seeds. In addition, our team began two years ago a research project in Lebanon aiming at the Introduction and development of the revegetation techniques in Lebanon. In fact, this country bared since 20 years the consequences of urban pressure on its environment especially by the development of quarries and road networks. Therefore, pioneer work is necessary to aim at the adaptation of these techniques to the local environment.

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

Trend Analysis of Labor Input Ratios by Work Types in Apartment Housing Constructions (공동주택 건설공사에서 공종별 실투입 노무비율의 추이분석)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.97-104
    • /
    • 2015
  • Apartment Housing 25 in the field of construction since 2000 collected by types of labor: reinforced concrete, plaster, internal, equipment, electrics communication, the other work. And the performance of labor input was collected in the amount of construction work performed on a monthly basis. After changing the construction period in the standardization work that is 100% of the construction period, the amount was converted into labor ratio by type. Analysis of the input flow rate and the amount of labor conclusions were as follows: (1) The size of the labor rate is reinforced concrete work (38.25%), plastering work (5.10%), internal work (5.67%), equipment work (9.10%), electrics communication (8.76%), the other works (33.12%) and the size of labor rate is the largest work in reinforced concrete work. (2) The peak of labor input ratio was from 52.5% month to 62.5% month. This was when the labor rate of 3.6%. (3) The period month of the largest labor ratio% is 35% month by reinforced concrete construction, and this time it was 2.12% per month labor rate, and reinforced concrete construction is finishing from 65% month to 80% month. This showed the greatest congestion of mutual interference between each works is being continue. The results of this study are the greatest congestion in apartment housing construction has informed the high period(%months), which is essential to a successful project.

Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project (친환경 리모델링 철거공사의 경제성 평가 및 사례적용)

  • Kim, Yoon-Duk;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.45-53
    • /
    • 2010
  • When increasing quantity of construction wastes, how to deal with construction wastes and environmental problems relating to disposal of construction wastes are discussed as social issues, treatment of construction waste and subsidiary issues are raised as important problems. The demolition work produce construction wastes most in construction industry. Various researches on eco-friendly treatment of construction wastes, recycling rates and recycled materials were conducted aspect of sustainability in developed countries, however, domestic remodeling projects were performed demolition work with first-demolition and second-classification method which emphasize productivity focused on efficiency. It caused not only environmental problems, but also economical problems such as increasing disposal cost of construction wastes. Solving these problems, the previous study, suggested the process model of eco-friendly demolition work to recycle materials. This paper applied eco-friendly remodeling process to practical projects and economic feasibility on eco-friendly remodeling process. Moreover these results expect to contribute the revitalization of eco-friendly demolition work in remodeling projects.

A Study on the Design Value Analysis Methodology for Bridge Structure Using Reliability Analysis (신뢰성 해석을 이용한 교량구조물의 설계VA기법 연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Suk-Won;Jung, Jun-Hwa;Kim, Seong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.114-125
    • /
    • 2009
  • In this study, a design value analysis technique that considered stochastic LCC and stochastic performance evaluation was proposed, and by introducing the concept of reliability analysis, a decision making that secured reliability was supported. The results of this study, which was carried out according to the above objectives and methods, are summarized as follows: 1) The design value analysis procedures and value state function, improved in order to carry out a reliable analysis when evaluating alternate proposals that were extracted after the function definition was complete, were formalized, and in order to secure consistency and efficiency for value evaluation procedures, an evaluation index scheme was proposed; 2) Database collection and analysis were done for a bridge's LCC analysis. As for the collection scope of data, literature of previous research done on a bridge's LCC analysis was used as the basis for analysis, and for securing reliability regarding analysis results and dealing with uncertainty of collected data, the MCS technique was applied; 3) Weights and evaluation ranks for performance evaluation of each of the alternate proposals, as well as LCC analysis model, analysis period, discount rate, user expense, safety inspection and safety diagnosis expense conditions for LCC analysis were proposed. Lastly, a feasibility study was done and conclusion was made about "OO grand bridge and connecting road construction work execution design" project centered on value analysis execution case.

A Study on the Architectural Design Utility of Object-based CAD System (객체기반 CAD 시스템의 건축설계적 효용에 관한 연구)

  • Yoo, Chang-Geun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.2 no.1
    • /
    • pp.9-15
    • /
    • 2002
  • As architectural forms tend to be large-scaled, high-storied and complicated, use of computer for processing design information has been generalized. However, CAD use in the process of developing architectural design has been neglected greatly in the educational field of architectural field due to the surging of recognition that it may limit the essential property of architectural design. It may be resulted from the limitation of CAD system, that is, it is because of tardy speed of application development for the related areas with the lack of simplicity and clarity of flexibility to be secured on the drawing and user interface. Recent CAD systems, however, overcome such a limitation, convert into object-based design from entity-based drawing, drafting and modeling for implementing design concept of architects and it connects with internet linked to superspeed information communication network and changes process and stream of architectural design. Therefore, this study deals with utility of object based CAD system with products of Autodesk Co. and consequently obtain the following conclusions. First, it expands architect's design areas by supporting cooperative design system based on model-based architectural design and internet. Second, it reduces consumption of personal and material resources and time in the process of drawing production for improving architectural design works. Third, it can reduce the frequent design changes by improving understanding of architectural space with visualization of immediate 3D information, escaping from traditional methods to deliver design information to building owner through 2D drawing or model and perspective drawing requiring much cost and time. Fourth, it keeps exactness without omission or duplication of design information and generate and renew information of all related drawings on a drawing. Fifth, it is possible to change difficult and boring architectural design work into a pleasure owing to immediate modeling and drawing of design idea. In addition, digital drawing generated by using object-based CAD system can playa role of establishing Urban Information System to be used for protecting from building in disaster and urban disasters in connection with GIS numerical map and be used for reference of all kinds of information required fro post-management of buildings. However, what is more important is that surplus time from introduction of object-based CAD system should be used for consideration to be recognized as a good space and building built as a product of this project for comfort to urban people.

  • PDF

Study on the Application of Semi-open cut Top-Down Construction for Framework (세미 오픈컷 역타공법의 현장적용에 관한 연구)

  • Sho, Kwang-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.129-138
    • /
    • 2011
  • Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.

A Study on the Development of Standardized Nursing Care Plans for Computerized Nursing Service (간호업무 전산화를 위한 표준화된 간호계획의 개발에 관한 연구)

  • 김조자;전춘영;임영신;박지원
    • Journal of Korean Academy of Nursing
    • /
    • v.20 no.3
    • /
    • pp.368-380
    • /
    • 1990
  • A central issue in the development of nursing practice is to describe the phenomenon with which nursing is concerned. To identify the health problems which can be diagnosed and managed by the nurse is the first step to organize and ensure the development of nursing science. Therefore the academic world has been discussing the application of the nursing diagnosis in nursing practice as a means of improving quality of care. The objectives of this study were to develop a standardized nursing care plan for ten selected nursing diagnoses to form a database for computerized nursing service. The research approach used in the study was (1) the selection of the ten nursing diagnoses which occur most frequently on medical-surgical wards, (2) the development of a standardized nursing care plan for the ten selected nursing diagnoses, (3) application of the plan to hospitalize patients and evaluation of the content validity by the nurses, and (4) evaluation of the clinical effects after the use of the standardized nursing care plans. The subjects were 56 nurses and 395 hospitalized patients on two medical and two surgical unit. The results of this study were as follows ; 1) The ten selected nursing diagnoses for the development of the standardized nursing care plans were “PAIN, SLEEP DISTURBANCE, ALTERED HEALTH MAINTENANCE, ALTERATION IN NUTRITION, ANXIETY, CONSTIPATION, ALTERED PATTERNS OF URINARY ELIMINATION, DISTURBANCE IN BODY IMAGE, POTENTIAL FOR ACTIVITY INTOLERANCE AND ACTIVITY INTOLERANCE”. 2. The developed standardized nursing care plans included the nursing diagnosis, definition, defining characteristics, etiologic or related factors that contribute to the condition, recording pattern, desired outcomes and nursing orders (nursing interventions). 3. The plan was used with hospitalized patients on medical - surgical wards to test for content validity. The patient's satisfaction with the nursing care and nurses' job satisfaction were investigated to evaluate the clinical effects after the use of the standardized nursing care plans. A comparison of patient satisfaction with nursing care before and after the introduction of the standardized nursing care plans showed a statistically significant higher level of satisfaction with the standardized care plans. There was no difference in the level of job satisfaction expressed by the nursing staff before and after the standardized nursing care plans were introduced. However, when opinions about the use of the standardized nursing care plans were examined it was found that there was a positive effect on clarity in defining the nursing problems, determining nursing cost, more feasible goal setting, effective and systematic nursing records and indications for nursing research. The results of this study suggest that in order to increase the use of nursing diagnoses in the clinical area, it would be effective to select some wards as a pilot project, give the nurses training in the use of nursing diagnosis and develop and use the standardized nursing care plans. In addition to the ten diagnosis used in this study it is recommended that continual development of nursing diagnoses be done using diagnoses that are appropriate to Korea and testing them for validity through standardized care plans.

  • PDF

Does Process Quality of Inpatient Care Serve as a Guide to Reduce Potentially Preventable Readmission (PPR)? (의료서비스의 과정적 질과 잠재적으로 예방 가능한 재입원율과의 관계)

  • Choi, Jae-Young
    • Korea Journal of Hospital Management
    • /
    • v.23 no.1
    • /
    • pp.87-106
    • /
    • 2018
  • Objective: The objective of this study is to examine the association between process quality of inpatient care and risk-adjusted, thirty-day potentially preventable hospital readmission (PPR) rates. Data Sources/Study Setting: This was an observational cross-sectional study of nonfederal acute-care hospitals located in two states California and Florida, discharging Medicare patients with a principal discharge diagnosis of heart failure, acute myocardial infarction, or pneumonia January through December 31, 2007. Data were obtained from the Healthcare Cost and Utilization Project State Inpatient Database of the Agency for Healthcare Research and Quality, Centers for Medicare and Medicaid Services Hospital Compare database, and the American Hospital Association Annual Survey of Hospitals. Study Design: The dependent variable of this study is condition-specific, risk-adjusted, thirty-day potentially preventable hospital readmission (PPR). 3M's PPR software was utilized to determine whether a readmission was potentially preventable. The independent variable of this study is hospital performance for process quality of inpatient care, measured by hospital adherence to recommended processes of care. We used multivariate hierarchical logistic models, clustered by hospitals, to examine the relationship between condition-specific, risk-adjusted, thirty-day PPR rates and process quality of inpatient care, after taking clinical and socio-demographic characteristics of patients and structural and operational characteristics of hospitals into account. Findings: Better performance on the process quality metrics was associated with better patient outcome (i.e., low thirty-day PPR rates) in pneumonia, but not generally in two cardiovascular conditions (i.e., heart failure and acute myocardial infarction). Practical Implication: Adherence to the process quality metrics currently in use by CMS is associated with risk-adjusted, thirty-day PPR rates for patients with pneumonia, but not with cardiovascular conditions. More evidence-based process quality metrics closely linked to 30-day PPR rates, particularly for cardiovascular conditions, need to be developed to serve as a guideline to reduce potentially preventable readmissions.

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.