• Title/Summary/Keyword: project benefits

Search Result 553, Processing Time 0.033 seconds

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

A Case Study of Resolving Conflict in Energy Infrastructure Siting by the Solar PV Project

  • Lee, Jonghwan;Shin, Dong-hwi;Han, Soohee;Roh, Jae Hyung
    • Current Photovoltaic Research
    • /
    • v.8 no.3
    • /
    • pp.79-85
    • /
    • 2020
  • The growing demand for new energy infrastructure has often been encountered with the difficulties of siting in power plants and electric transmission lines. Siting such large-scale and complex facilities produces so many-sided issues that it is highly necessary to develop an approach to resolving the related problems and conflicts. This paper introduces how the stakeholders have handled the issues and resolved conflicts with residents opposed the construction of 765 kV transmission line. The solar photovoltaic power generation, called "Hee-Mang Sunlight Power project", is used for persuading residents to agree with constructing high-voltage transmission line and sharing benefits. It is considered how the project performance such as generation output and resident's profits is and proposed what the project should be revised and supplement. The project is shown that the intractable spiting in energy systems can be smartly resolved with cost-effective institutional solutions instead of relatively expensive technical ones.

The Problem/Project-Based Learning (PBL/PjBL) at Online Classes

  • Kim, Yangsoon
    • International Journal of Advanced Culture Technology
    • /
    • v.9 no.1
    • /
    • pp.162-167
    • /
    • 2021
  • The aim of this paper is to analyze the development of effective online Problem-Based Learning (PBL) and Project-Based Learning (PjBL). The collaborative PBL/PjBL become one of the hot issues with the rapid growth of online learning in the era of COVID-19. Educators try to get innovative to continue instruction without sacrificing student engagement, thus adopting an instructional model of PBL/PjBL. The PBL process involves clarifying terms, defining complex problems, brainstorming, structuring and hypothesis while PjBL includes project-planning, implementation, communicating the results of a project in a presentation and evaluations with immediate individually tailored feedback within a predetermined period. Despite the differences between online and offline learning, the benefits of learning online or offline are practically the same if enough bidirectional interactions between instructors and students are possible. We argue that online qualifications are just the same as those of offline ones in PBL/PjBL models, therefore, the standards of online/offline learning are identical since education is a two-way communication.

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

A Study on the Non-market Economic Value of Marine ranches and Marine Forests Using Contingent Valuation Method (조건부가치측정법(CVM)을 이용한 바다목장과 바다숲의 비시장 경제가치 연구)

  • Kim, Soon-Mi;So, Ae-Rim;Shin, Seung-Sik
    • The Journal of Fisheries Business Administration
    • /
    • v.51 no.3
    • /
    • pp.1-15
    • /
    • 2020
  • The Korean government has been carrying out the marine ranch development project since 1998 with the purpose of responding to the decrease in coastal fishery resources and fishery income, preparing a systematic management system for the sustainable use of fishery resources and realizing advanced fisheries power by expanding and upgrading fisheries resource development projects. In addition, the government established the Korea Fisheries Resources Agency and promoted projects for the protection and management of fishery resources by increasing basic productivity by artificially creating marine forests in areas where whitening events occur. Since the project of building marine ranches and marine forests requires immense government financial support, it is important to estimate the economic value and thoroughly evaluate the feasibility of the project. In this paper, the project of non-market economic value of the development of marine ranches and the development of marine forests was estimated. CVM (Contingent Valuation Method) was applied as a methodology for benefits estimation. Prior to the analysis, a one-on-one interview survey was conducted with participation of 512 residents and 514 residents respectively for the project of creating a marine ranch and developing a marine forest. A DBDC (Double-Bounded Dichotumous Choice) model was applied in the WTP (Willingness To Pay) analysis model and the socioeconomic variables of the surveyor, such as sex, age, education and income, were reflected in the model. The economic benefits from the two projects, namely, building of marine ranches and developing marine forests were estimated to be equal to 4,608 won and 7,772 won per household per year, respectively. According to the results of the survey, it seems that respondents think that marine forests are more valuable than marine ranches. This is as a result of ordinary citizens' thought that the marine ranches are more cost-effective than the marine forests. The benefits estimated through this study can be used for analysis of economic feasibility prior to carrying out the project of building marine ranches and developing marine forests, and are considered to be the valuable for policy-making purposes and finding social and economic consensus.

Measurement of the Greenhouse Gas Emission Benefits from the Marine Bio-Energy Development Project (해양바이오에너지 개발사업의 온실가스 저감편익 추정)

  • Kim, Tae-Young;Pyo, Hee-Dong;Kim, Hye-Min;Park, Se-Hun
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.3
    • /
    • pp.217-225
    • /
    • 2013
  • It is time to develop new renewable energy that could fundamentally replace fossil fuel, which has been increasingly needed due to environmental pollution and energy security. Korean marine bio-energy development project is planned to produce 50% of total bioenergy. This study attempts to measure the greenhouse gas emission reduction benefits of marine bio-energy development project through contingent valuation method. Single bounded dichotomous choice (SBDC) is applied with spike model. The results show that the average willingness to pay are estimated to be KRW 4,190 at SBDC, per household per year. If the result has been expanded to the region which is survey conducted, KRW 50.1 billion annually. These quantitative information can be usefully utilized in the cost benefit analysis to implement project and policy-making for the industrialization of marine bio-energy development project.

Hands-on Education Module for Modular Construction, 3D Design, and 4D Schedule

  • Kithas, Kyle A.;Choi, Jin Ouk
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.484-491
    • /
    • 2022
  • A paradigm shift in teaching modular construction in higher education and K-12 is proposed as a means to increase the future adoption of the modular construction technique. To this effect, a new education module is presented to STEM educators. This education module is based on LEGOs and directed towards educators in the architecture, engineering, and construction (AEC) industry. The main objectives of the education module are to increase interest and knowledge of modular construction, acknowledge the benefits of using 3D design with 4D scheduling, and create a simulating hands-on educational opportunity. The education module is designed to allow participants to experience a hands-on simulation of modular construction and stick-built construction through building a LEGO project. Participants are challenged to find the advantages and disadvantages in both construction systems first-hand and record their findings. Results are presented from the preliminary testing of this education model on a group of construction management students at the University of Nevada, Las Vegas. Overall, the survey results showed that the LEGO education module was successful at achieving the project's three main objectives: 1) increasing the participants' interest and knowledge of modular construction through an interactive project; 2) increasing the participants' understanding of the benefits of 3D design with 4D scheduling over the use of 2D drawings; and 3) creating a simulating hands-on educational opportunity to help participants compare modular construction to stick-built construction. In the end, this proposed a new LEGO education module addressing the problems identified from this study with more participants.

  • PDF

A Study on the Effect of Relationship Benefits on Customer Value, Customer Satisfaction and Loyalty - For Parents Using Early Childhood Education Institutions (관계 혜택이 고객 충성도에 미치는 영향에 관한 연구 - 영유아 교육기관을 이용하는 학부모를 대상으로)

  • Kim, Eun Joung;Park, Jong Woo
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.2
    • /
    • pp.235-250
    • /
    • 2022
  • Purpose: The main purpose of this study was to explore the factors that can increase parental loyalty from the perspective of management marketing in order to acquire information on strategies related to early childhood education institutions. Methods: For this purpose, frequency analysis, reliability and validity analysis, correlation analysis, hypothesis testing, and mediating effect analysis were performed using SPSS 22.0. Results: As a result of this study, first, among the sub-factors of relationship benefits, economic benefits, psychological benefits, and customerization benefits were found to have a significant influence on customer value. Second, among the sub-factors of relationship benefits, economic benefits, psychological benefits, and customerization benefits were found to have a significant effect on customer satisfaction. Third, customer value was found to have a significant effect on customer satisfaction. Fourth, customer value was found to have a significant effect on loyalty. Fifth, customer satisfaction was found to have a significant effect on loyalty. Conclusion: The results of this study suggest the necessity and importance of forming a relationship that considers the psychological aspect, economic aspect, and customerization aspect in the relationship with parents who use early childhood education institutions. This study sets the relational benefit as an independent variable among the variables of management marketing as a factor that affects loyalty, identifies the relationship between the variables through customer value and customer satisfaction, and intends to use it as basic data for qualitative improvement of educational institutions for infants and toddlers.

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project (대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 -)

  • Choi, Mi-Hee
    • Journal of Environmental Impact Assessment
    • /
    • v.11 no.2
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.