• Title/Summary/Keyword: productivity measurement

Search Result 380, Processing Time 0.025 seconds

On the Measurement of Biomass and the Productivity of the Cultivated Mulberry Plants (뽕나무의 현존량추정법과 생산력에 대한 연구)

  • 김준호
    • Journal of Plant Biology
    • /
    • v.18 no.3
    • /
    • pp.122-128
    • /
    • 1975
  • With the cultivated mulberry plant which feeds silkworm on its leaves in sericulture, the measuring methods of biomass of terrestrial organs were compared and the annual net productivity was estimated. The measurement of the standing crops by means of allometric method on basis of relation between the parameter D230H, square of the diameter of the branch on 30cm high above ground($D{\frac}{2}{30}$) multiplied by its height(H), and the amount of leaves(WL) or of branch (Ws) was more accurate than other methods on basis of correlation between a character of the branch such as H, D30 or D230 and WL or Ws. The estimate of value of the net productivity of terrestrial parts of mulberry was 9.06-12.54 ton/ha.year, which was similar to that obtained from secondary forests in cool temperate zone.

  • PDF

A Case Study on Productivity Analysis and Methods Improvement for Masonry Work

  • Chang, Chul-Ki;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.372-381
    • /
    • 2013
  • In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.

Digital Pen System for Measuring the Productivity at Construction Site (건설현장 디지털 펜 활용 생산성 측정 시스템 구축)

  • Cho, Ye-Rim;Kim, Tae-Yong;Shin, Yoon-Seok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.74-75
    • /
    • 2016
  • The success of the domestic construction project is mostly judged by process and costs. It can raise the accuracy of the process and costs through productivity measurement and management. System which can increase the productivity and efficiency is required at this moment. The purpose of this study is to introduce the case of measuring productivity system using the Digital Pen System. To utilize Digital Pen System can raise construction productivity. This system is expected to more efficient to accumulation and utilization of construction site information.

  • PDF

Work Measurement through Application of Work Sampling in Hospital Dietary Departments Classified by the Productivity Level (급식생산성 유형별 병원 영양과의 워크샘플링 (Work Sampling)을 적용한 작업분석)

  • 양일선
    • Journal of Nutrition and Health
    • /
    • v.26 no.4
    • /
    • pp.443-454
    • /
    • 1993
  • The purposes of this study were to analyze the work patterns of selected hospital foodservices by Work Sampling methodology, and to investigate the relationship among operational factors affecting productivity. The hospitals were classified into 3 groups by the percentage of patient meals, and the percentage of special patient diet, and the menu items of patients meals. The groups clustered were characterized by productivity. Work Sampling methodology was utilized to analyze the work patterns of hospitals with selected 3 hospitals to investigate the productivity the productivity and labor times used in each work functions. Productivity index analyzed by Work Sampling were 10.36 min/meal, 10.95 min/meal, and 12.19 min/meal, respectively X, Y, Z hospital. Z hospital was significantly different from time used in direct work function and delay. Direct work function time was the highest, delay the lowest in Z hospital. The relation between the results of Work Sampling and the productivities of 3 groups showed not by delay but direct work function in the classification used in this study.

  • PDF

Measuring productivity improvement by Machine Guidance through work sampling in earthwork

  • Eom, Julee;Kang, Youngcheol;Lee, Yongsei;Choi, Pyungho
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.409-416
    • /
    • 2020
  • This paper proposes a study measuring productivity improvement by using a type of technology called "Machine Guidance" through work sampling in earthwork. Earthwork is the activity typically on the critical path, indicating that productivity for the activity is critical for managing schedule on time. Thanks to the development of sensing and information system technologies, productivity for earthwork has been improved. While there have been many studies investigating the application of a certain type of technology to earthwork, few studies have measured the productivity improvement and presented how the technology leads to productivity improvement. Based on the thorough literature review, it is hypothesized that Machine Guidance contributes to improving productivity of earthwork by reducing indirect workhours spent for information waiting and inspection. In addition to the literature review, this paper presents a research model to test the hypothesis by using the work sampling technique. By proving and quantifying the productivity improvement from the technology use, this study can help practitioners justify the investment for technology use, which will contribute to the deployment of technology and more effective execution of earthwork.

  • PDF

The Study on the Analysis of Factors Decreasing Construction Labor-Productivity Using AHP Method (AHP기법을 이용한 건설노동생산성 저하요인 분석에 관한 연구)

  • Pyo Young-Min;Bae Soo-Yong;Ryu Hyoung-Han;Lee Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.141-147
    • /
    • 2005
  • Usually, processing whole project or a part of frame work delays due to acceleration, changing orders, management, characters of project. overtime, worker crowding, early occupation in the field of construction. Through a whole project, these factors cause decreasing construction labor-productivity which is the most dependent in business of construction. These kind of decreasing of construction labor-productivity cause many negative effects, just as extension of time, increasing cost in project of construction. Regardless of characters of construction or decreasing labor-productivity, extension of time is a incident which needs acceleration, also it cause a high possibility of claim and dispute. The productivity has just a broad meaning in business of construction. That's why it's difficult to apply in the field of construction. Especially, factors increasing or decreasing labor-productivity is defined by analysis of working as qualitative and outlined evaluation. However, study of the each factor decreasing construction labor-productivity analysis has not researched, because of difficulty of systematic measurement and management. The existed studies about management of productivity are just focused on estimation of productivity, not on evaluation of productivity. It was true that I couldn't examine clearly about the analysis of how much important per each the factor which have influence on labor-productivity because of the characteristic as qualitative that the labor productivity have On this study, i tried to get the factors decreasing of labor- productivity with gathering opinions of panels of expert's studies about the factors decreasing of labor-productivity on project of construction through Delphi method and i evaluated the result factors as quantitatively and subjectively about importance of factors decreasing construction labor-productivity Analysis, using AHP Method by Saaty. Also, using Delphi and AHP method, 1 suggest substantiated method qualitative factors are measured by quantitative criteria.

  • PDF

A Study on the Productivity Measurement and Effect Factors of Management Evaluation in Public Firms with a Focus on the Port Authorities

  • Eom, Ki-Yong;Ahn, Ki-Myung
    • Journal of Navigation and Port Research
    • /
    • v.44 no.5
    • /
    • pp.400-406
    • /
    • 2020
  • In this study, we first measured the malmquist productivity index by DEA among the Korean public firms. Second, there are 12 public corporations whose productivity (MPI) has decreased compared to 2014. This is mainly because of a decrease in productivity, as well as a decrease in the technical efficiency change index (TECI), impacted by the internal environment, and the increase in productivity because of an increase in the technology change index (TCI) impacted by the external environment. Finally, the analysis of the impact on the management assessment scores showed that the productivity (MPI), scale efficiency (CRS), size of sales, operating profitability, and total capital investment efficiency are significantly related (+), except for the asset turnover, which is a static financial ratio. Meanwhile, the management evaluation scores between the high-productivity public corporations and low-performing public corporations were significantly discriminating. Thus, it is confirmed that the nation's state-run companies must manage their MPIs in a time series to score high in management evaluation.

Managing maritime automobile terminals: an approach toward decision-support model for higher productivity

  • Beskovnik, Bojan;Twrdy, Elen
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.3 no.4
    • /
    • pp.233-241
    • /
    • 2011
  • The article describes actions and strategies to obtain higher productivity on maritime automobile terminals. The main focus is on elaboration of efficient and effective organizational structure to model and implement short-term, mid-term and long-term strategies. In addition, with an empiric approach we combined the analyses of current findings in important scientific papers and our acknowledgments in practical research of north Adriatic maritime automobile terminals. The main goal is to propose actions towards increasing system's productivity. Based on our research of the north Adriatic maritime automobile terminals and with Lambert's model an in-deep analysis of limiting factors, user's expectations and possibilities for productivity increase has been performed. Moreover, with our acknowledgments a three-level decision-support model is presented. With an adequate model implementation it is possible to efficiently develop and implement different strategies of productivity measurement and productivity increase, especially in the fields of internal transport productivity, entrance/exit truck gates operations and wagon manipulations. According to our observation a significant increase might be achieved in all three fields.

Productivity Measurement and Analysis on Factors in Steel Erection (철골세우기 작업의 영향요인별 현장생산성 측정 및 분석)

  • Huh, Young-Ki;Lee, Ji-Yong;Yun, Seok-Heon;Tae, Yong-Ho;Ahn, Bang-Ryul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.31-38
    • /
    • 2009
  • In today's construction industry, buildings have been more complicated and higher, the demands of steel works have been increasingly concerned, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work; one tower crane operated work and two tower crane operated; and work productivity conducted in clear weather condition, cloud and rainy. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

The Development of a Construction Productivity Prediction Model Based on Data Mining (데이터 마이닝 기반의 건설 생산성 예측 모델 개발)

  • Woo, Gi-Beom;Ahn, Jy-Sung;Oh, Se-Wook;Kim, Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.813-818
    • /
    • 2007
  • Construction productivity is a key factor for efficiency evaluation of construction work process, project performance measurement, and basic data of work plan in construction industry. However, although construction productivity is important in construction industry, gathering methodology and analyzing methodology of productivity data are not well-organized therefore productivity data is not utilized in the construction industry The purpose of this study is to develop productivity prediction system using data mining technology based on activities and to suggest frameworks about productivity data collection, accumulation.

  • PDF