• 제목/요약/키워드: productivity and cost

검색결과 1,372건 처리시간 0.026초

품질 코스트를 적용한 생산성측정 모형 (Productivity Measurement Model Based on Quality Cost)

  • 이재웅;신용백
    • 품질경영학회지
    • /
    • 제21권2호
    • /
    • pp.48-60
    • /
    • 1993
  • We have depended upon the quantitative analysis for productivity measurement. and excluded the qualitative analysis from productivity measurement. But I think that the qualitative analysis must be considered so as to get a effective productivity measurement This paper intened to establish improvement productivity measurement adopted quality cost of all the qualitative elements.

  • PDF

수출제조기업의 생산성변화에 영향을 미치는 요인 분석 : 혁신활동을 중심으로 (Determinants of Productivity Change in Export Manufacturing Firms : Focusing on Innovation)

  • 황경연;구종순;황정현
    • 무역학회지
    • /
    • 제41권4호
    • /
    • pp.61-90
    • /
    • 2016
  • 본 연구는 수출제조기업을 대상으로 기업의 생산성변화에 영향을 미치는 요인을 분석하는데 목적이 있다. 기존 실증연구에 기초하여 수출제조기업의 생산성변화에 영향을 미치는 변수를 선정하고, 이러한 변수들과 수출제조기업의 생산성변화간의 관계를 분석하였으며, 그 결과는 다음과 같다. 첫째, 수출제조기업 355개 대상으로 생산성변화에 영향을 미치는 요인을 분석한 결과에서 수출제조기업의 혁신활동과 총자산은 생산성변화에 긍정적인 영향을 미치는 반면, 인건비비율, 자기자본비율 및 유동비율은 생산성변화에 부의 영향을 미치는 것으로 나타났다. 둘째, 수출제조대기업에서 혁신활동과 무형자산은 생산성변화에 긍정적인 영향을 미치는 반면, 인건비비율, 판매비비율 및 자기자본비율은 생산성변화에 부의 영향을 미치는 것으로 나타났다. 셋째, 수출제조중소기업에서 혁신활동은 생산성변화에 긍정적인 영향을 미치는 반면, 인건비비율 및 자기자본비율은 생산성변화에 부의 영향을 미치는 것으로 나타났다. 넷째, KOSIP 상장 수출제조기업에서 무형자산은 생산성변화에 긍정적인 영향을 미치는 반면, 인건비비율, 판매비비율 및 유동비율은 생산성변화에 부의 영향을 미치는 것으로 나타났다. 다섯째, KOSDAQ 상장 수출제조기업에서 혁신활동 및 총자산은 생산성변화에 긍정적인 영향을 미치는 반면, 인건비비율 및 자기자본비율은 생산성변화에 부의 영향을 미치는 것으로 나타났다.

  • PDF

하이테크 부품산업에서 작업분석/실행을 통한 생산성 향상의 프로젝트 방법론 연구 (A case for productivity improvement by time study in high tech industry)

  • 이원재;김중회;강성우;강경식
    • 대한안전경영과학회지
    • /
    • 제17권1호
    • /
    • pp.225-230
    • /
    • 2015
  • Productivity is the essential comparative advantage in high tech industry company in 21 century. These company endless endeavor for low cost production. Low cost production can be led by low facility operation cost and low labor cost. But reducing facility operation cost arise much investment. Thus many high tech company drive reduction of labor cost. These article suggest model for reducing labor cost and prove a effect by example of some company.

스파이럴과 스트레이트 베벨기어 가공 시 비용 및 생산성 비교연구 (Comparative Study of the Manufacturing Cost and Productivity of Spiral and Straight Bevel Gear)

  • 박창섭;양완석;김수진
    • 한국생산제조학회지
    • /
    • 제22권2호
    • /
    • pp.275-280
    • /
    • 2013
  • The tractor front axle has the lower standard for noise and vibration relatively and it increase the possibility to develop of the alternative straight bevel gear of the expensive spiral bevel gear. The purpose of this paper is to compare of the spiral vs. the straight bevel gear manufacturing process. The manufacturing cost and productivity are compared after the spiral bevel gear of the tractor front axle is replaced of to the straight bevel gear. If spiral bevel gear is replaced to straight bevel gear, the cost is reduce 4.6% and productivity is increase 18%.

Selection of a Probability Distribution for Modeling Labor Productivity during Overtime

  • Woo, Sung-Kwon
    • 한국건설관리학회논문집
    • /
    • 제6권1호
    • /
    • pp.49-57
    • /
    • 2005
  • Construction labor productivity, which is the greatest source of variation in overall construction productivity, is the critical factor for determining the project performance in terms of time and cost, especially during scheduled overtime when extra time and cost are invested. The objective of this research is to select an appropriate type of probability distribution function representing the variability of daily labor productivity during overtime. Based on the results of statistical data analysis of labor performance during different weekly work hours, lognormal distribution is selected in order to take advantage of easiness of generating correlated random numbers. The selected lognormal distribution can be used for development of a simulation model in construction scheduling, cost analysis, and other applications areas where representation of the correlations between variables are essential.

이미지 프로세싱을 활용한 생산성 정보 측정방안에 관한 연구 (Basic Study on the Measurement of Unit Productivity Data By Image Processing Technology)

  • 이찬규;이승현;손재호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.281-282
    • /
    • 2012
  • Construction performance and productivity improvement are key focus areas in construction industry for any nation. There have been frequent delays and cost overruns in construction projects and poor productivity is one of the major contributions. For this reasons, there have been many research studies performed on the improvement of construction productivity for several decades. However, measuring productivity on a construction job site is still not an easy work. Because collecting reliable data consistently from the job site requires a lot of personnel efforts causing extra time and cost. This paper provides a basic study on the application of image processing technology for measuring unit productivity. It presented the possibility of unit productivity measurement by image processing technology through case study.

  • PDF

낙엽송 개벌 임분에서 타워야더를 이용한 전목수확시스템의 작업비용 분석 (Harvesting Productivity and Cost of Whole-Tree Clear Cutting Using a Tower Yarder in a Larix leptolepis Stand)

  • 조민재;조구현;오재헌;한한섭;차두송
    • Journal of Forest and Environmental Science
    • /
    • 제30권1호
    • /
    • pp.107-112
    • /
    • 2014
  • The productivity and cost of clear cutting operations were examined to broaden our knowledge on the harvesting system in a Larix leptolepis stand of Korea. The harvesting system was divided into tree operations which were chainsaw (STIHL MS440) felling, tower yarder (Koller301-4) yarding and harvester (WOODY H50) processing. The average cycle time of felling, yarding and processing were 98 s/cycle, 245 s/cycle and 150 s/cycle. The total stump-to-pile operational productivity was 43.07 $m^3/hr$. The highest production activity was the felling 17.93 $m^3/hr$, followed by the productivity of processing 15.62 $m^3/hr$ and then by the productivity of yarding 9.52 $m^3/hr$. In addition the total stump-to-pile operational cost was 24,086 $won/m^3$. The highest cost activity was the yarding 14,557 $won/m^3$ (60.4% of the total cost), followed by the costs of processing 8,461 $won/m^3$ (35.2%) and then by the costs of felling 1,068 $won/m^3$.

거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype 개발에 관한 연구 (Development of Cost Data Prototype based on Production Crew by Productivity Analysis of Form Work)

  • 강동완;지성민;현창택
    • 한국건설관리학회논문집
    • /
    • 제13권1호
    • /
    • pp.44-52
    • /
    • 2012
  • 합리적인 방법에 의해 결정된 건설 공사비를 포함하여 계약을 체결하는 것은 공공 건설공사의 사업비 관리 측면에서 매우 중요하다. 국내에서는 건설 공사비를 산정하는 기준으로 표준품셈이 사용되고 있지만, 표준품셈에서 제시하는 품의 적정성에 대해서 문제가 제기되고 있으며, 현장의 자원 투입량과 품셈에서 제시하는 자원 투입량의 차이로 합리적이고 효율적인 공사비를 산정하는데 어려움이 있다. 본 연구에서는 건설 공사비를 합리적으로 산정하기 위하여, 공동주택 거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype을 제시하였다. 특히, CYCLONE 모델은 민감도 분석을 통해 최적의 작업인원을 제시하는 모델이므로, 거푸집 공사의 다양한 작업공간과 작업인원을 대상으로 생산성을 분석할 수 있는 도구로 활용이 가능하다. 그리고 개발된 회귀식은 거푸집 공사의 작업인원을 독립변수로 하여, 필요한 작업량을 종속변수로 예측하는데 활용이 가능할 것이다.

생산성 기반의 소프트웨어 유지보수 대가산정 모델 (A Model for Software Maintenance Cost Estimation based on Productivity)

  • 배준수
    • 산업공학
    • /
    • 제17권spc호
    • /
    • pp.122-130
    • /
    • 2004
  • Since the cost of software maintenance occupies about 50~75% in a general successful organization, the software maintenance plays an important role in software life cycle. In particular, if the managed system needs to be operated in a long term or the system is very large and complex, then the maintenance is especially more important. Software maintenance is defined as software modification activities after customer delivery, such as improvement of performance or functionality, error correction, adaptation to environmental changes, etc. In this paper, software cost estimation models are proposed, that is based on productivity of manpower in maintenance projects. In order to do this, the activities of maintenance are classified into function change, non-function change, user support and application operation. The proposed models are constructed and verified based on the real size and cost information of projects in the real world. The approach in this paper is to discriminate the heterogeneous activities in maintenance projects, and then to calculate the respective cost of each discriminated activity. By using the proposed models, the total cost of maintenance project is summed from the costs of four activities. In addition the number of conflicts between owner and order receiver about the amount of cost will be reduced and the reasonable cost estimation system will be established.

사업체 근로자의 연령구성이 생산성과 인건비에 미치는 영향 (The Effects of the workforce Age Structure on Productivity or Labor Costs)

  • 김기민
    • 경영과정보연구
    • /
    • 제37권1호
    • /
    • pp.123-138
    • /
    • 2018
  • 본 연구는 한국노동연구원의 사업체패널조사 1-5차년도 자료와 행정자료인 "고용보험 DB"를 결합하여 구축한 "사업체-근로자 연계자료"를 활용하여 사업체 근로자의 연령구성과 생산성 및 인건비와의 관계를 실증분석 하였다. 사업체의 생산성은 1인당 부가가치로, 인건비는 1인당 노동비용으로, 사업체 근로자의 고령화 정도는 근로자의 연령구성으로 측정하였으며 동적패널모형을 활용하였다. 분석 결과, 생산성과 인건비 모두 사업체의 35-39세 연령대 근로자의 비율을 중심으로 역U자의 모습을 보였다. 즉, 35-39세 연령대 근로자 대신 더 젊은층의 근로자 혹은 더 고령층의 근로자 비중이 증가하는 경우 생산성 및 인건비에 부(-)의 영향을 미치는 것으로 나타났다. 특히, 35-39세 연령대 근로자 대신 50세 이상 연령대 근로자가 증가할 때의 생산성 추정계수와 인건비 추정계수와의 차이가 30세 미만 연령대 근로자가 증가할 때의 생산성 및 인건비의 추정계수와의 차이보다 더 큰 것으로 나타났다. 이러한 분석 결과를 통해 고령근로자의 생산성 저하에 대한 기업의 우려는 타당하나, 동시에 기업은 이미 인건비 조정 등의 방법을 통해 고령근로자를 효율적으로 활용해 왔음도 확인할 수 있다.