• Title/Summary/Keyword: production scheduling

Search Result 450, Processing Time 0.032 seconds

Intelligent Control for Job Scheduling in Manufacturing (생산계획 수립을 위한 지능형 제어)

  • 이창훈;우광방
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.39 no.10
    • /
    • pp.1108-1120
    • /
    • 1990
  • The present study is to develop an intelligent control system for flexible manufacturing system, which is suitable for a variety of manufacturing types with smaller production rates. The controller is designed to integrate heuristic rules with optimization techniques for loading as well as flow rate of parts and ultimately meeting performance indices. The control function implemented by an optimization technique is to calculate short term production rates of parts. The heuristic control determined by production rules requires knowledge base to evaluate selected loading alternatives according to short term production rate and current process information, and also to determine final decision pertaining to loading. In this case, the knowledge base is constructed using the rules for evaluating alternatives, decision criteria, and flow control of parts in manufacturing system. The database is formulated by means of managing and updating current process information. A graphic system to monitor current status of the function and operation of manufacturing system is developed, and computer simulation is carried out to evaluate the performance of the proposed controller.

Two-Level Hierarchical Production Planning for a Semiconductor Probing Facility (반도체 프로브 공정에서의 2단계 계층적 생산 계획 방법 연구)

  • Bang, June-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.159-167
    • /
    • 2015
  • We consider a wafer lot transfer/release planning problem from semiconductor wafer fabrication facilities to probing facilities with the objective of minimizing the deviation of workload and total tardiness of customers' orders. Due to the complexity of the considered problem, we propose a two-level hierarchical production planning method for the lot transfer problem between two parallel facilities to obtain an executable production plan and schedule. In the higher level, the solution for the reduced mathematical model with Lagrangian relaxation method can be regarded as a coarse good lot transfer/release plan with daily time bucket, and discrete-event simulation is performed to obtain detailed lot processing schedules at the machines with a priority-rule-based scheduling method and the lot transfer/release plan is evaluated in the lower level. To evaluate the performance of the suggested planning method, we provide computational tests on the problems obtained from a set of real data and additional test scenarios in which the several levels of variations are added in the customers' demands. Results of computational tests showed that the proposed lot transfer/planning architecture generates executable plans within acceptable computational time in the real factories and the total tardiness of orders can be reduced more effectively by using more sophisticated lot transfer methods, such as considering the due date and ready times of lots associated the same order with the mathematical formulation. The proposed method may be implemented for the problem of job assignment in back-end process such as the assignment of chips to be tested from assembly facilities to final test facilities. Also, the proposed method can be improved by considering the sequence dependent setup in the probing facilities.

5-axis Milling Machining Time Estimation based on Machine Characteristics (기계 특성에 근거한 5축 밀링가공 시간의 예측)

  • So, B.S.;Jung, Y.H.;Jeong, H.J.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.12 no.1
    • /
    • pp.1-7
    • /
    • 2007
  • In this paper, we present a machining time estimation algorithm for 5-axis high-speed machining. Estimation of machining time plays an important role in process planning and production scheduling of a shop. In contrast to the rapid evolution of machine tools and controllers, machining time calculation is still based on simple algorithms of tool path length divided by input feedrates of NC data, with some additional factors from experience. We propose an algorithm based on 5-axis machine behavior in order to predict machining time more exactly. For this purpose, we first investigated the operational characteristics of 5-axis machines. Then, we defined some dominant factors, including feed angle that is an independent variable for machining speed. With these factors, we have developed a machining time calculation algorithm that has a good accuracy not only in 3-axis machining, but also in 5-axis high-speed machining.

A Study on the IT Infrastructure of Korean Apparel Industry (국내 의류업계의 IT 인프라 구조에 관한 연구)

  • Choi, In-Ryu
    • The Research Journal of the Costume Culture
    • /
    • v.17 no.3
    • /
    • pp.512-522
    • /
    • 2009
  • The purpose of this study is to analyze IT infrastructure of Korean apparel industry in order to enhance business effectiveness and customer's satisfaction in information society with global networks. For this study, the questionnaires were distributed to 57 apparel industries in Korea. The data were analyzed by factor analysis, descriptive statistics, Cronbach's alpha coefficient, multi regression analysis. The results of this study are as follow: First, Considering the apparel industry, construction of information system is essential for assistance of information policy and utilization of information. Understanding of e-business policy affects profits of suppliers. Second, Apparel industry with higher information policy has higher productivity with flexibility. Third, Apparel industry which has close relationship with suppliers has better customer support. Flexible scheduling and production line are important factors for quick response of customer's order and need.

  • PDF

The Experimental Study of "CALS" Model in Motor's Industry (자동차 산업의 CALS 구현을 위한 실증적 연구)

  • 김귀남;김태호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.42
    • /
    • pp.193-200
    • /
    • 1997
  • For the industrialized nations, the manufacturing industries have becomes increasingly difficult to meet customers' demands and complete on the international market. Thus, manufacturing industries must be able tn react quickly to prevailing market conditions and to maximize the utilization of resources. Within recent years, computer technology, in conjunction with software technology, has made available to the manufacturer tools which can greatly improve their reaction to a new market situation, speeding up the design of products, improving process planning, maximizing resource scheduling, and streamling production flow through factories. This paper investigate "CALS" systems for motor's companies. The purpose of this study is to give some ideas of finding a better way of constructing "CALS" system in Korea motor's companies.a motor's companies.

  • PDF

A Study on Solar Radiation Prediction using Artificial Neural Network (인공지능신경회로망을 이용한 태양광 예측)

  • Zhang, Fengming;Cho, Kyeong-Hee;Lim, Jin-Taek;Choi, Jae-Seok;Lee, Young-Mi;Lee, Kwang-Y.
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.354-356
    • /
    • 2011
  • Renewable energy resources such as wind, wave, solar, micro hydro, tidal and biomass etc. are becoming importance stage by stage because of considering effect of the environment. Solar energy is one of the most successful sources of renewable energy for the production of electrical energy following solar energy. And, the solar/photovoltaic cell generators depend on the solar radiation, which is a random variable so this poses difficulty in the system scheduling and energy dispatching, as the schedule of the photovoltaic cell generators availability is not known in advance. This paper proposes to use the two-layered artificial neural networks for predicting the actual solar radiation from the previous values of the same variable.

  • PDF

A Control Model for Prototyping Virtual Factory Simulator in Computer Integrated Manufacturing Environment (통합생산환경에서의 가상공장 시물레이터 개발을 위한 제어모형)

  • Namkyu Park;Hyun Jung Lee
    • The Journal of Society for e-Business Studies
    • /
    • v.1 no.1
    • /
    • pp.227-247
    • /
    • 1996
  • Presented in this paper is a control model for developing virtual factory simulator, which is being operated under the distributed environment. The control model consists of production activity plan and information flows. To incorporate elements of the characteristics of the distributed control system, we suggested a collaboration model. This model is working under the client/server architecture, and also designed for cooperative-distributed shop control(CDSC) system in order to exploit several advantages of client/server architecture. Collaboration among each agent(or client) is done through negotiation and task sharing. Based on a contract net model, the CDSC system has three kinds of agents-order agent, resource agent, and communication forwarding agent. Each agent performs shop scheduling and control through negotiation on contract net. No node in CDSC system can have authority over other node. A bidding scheme is employed far negotiation between order agent and resource agents. The CDSC system can support re-negotiation among resource agents and an algorithm for re-negotiation is also developed. Experimental results are shown to advocate the effectiveness of the CDSC system for CIM environments.

  • PDF

A Supply Chain Management Process Modeling for an Agriculture Marketing Information System (농산물 유통 정보화를 위한 공급사슬경영 프로세스 모델링)

  • Myung, Kwang-Sick;Park, Sei-Kwon;Kang, Dae-Won
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.358-377
    • /
    • 2000
  • A supply chain is a network of facilities and distribution options that performs the functions of procurement of materials, transformation of these materials into intermediate and finished products, and the distribution of these finished products to customers. SCM(Supp1y Chain Management), by definition, encompasses all activities associated with moving goods, from the raw materials stage through to the end user. It includes source and procurement, production scheduling, order processing, inventory management, transportation, warehousing, and customer service. Importantly, it encompasses the information systems used to monitor these activities. In this paper, the present situation and problems of marketing process in Korean agricultural environments were reviewed through a systematic methodology, and then we proposed a new business process for solving these problems by appling a supply chain management. We expect this supply chain management system applied to agricultural marketing process can improve significantly the rationality and transparency of Korean agricultural marketing structure.

  • PDF

A Programming Model for Employment Planning in a Manufacturing Firm (제조기업(製造企業)의 고용계획(雇用計劃)을 위한 계획(計劃) 모델)

  • Son, Man-Seok;Lee, Jin-Ju
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.2 no.1
    • /
    • pp.85-92
    • /
    • 1976
  • In this paper, the employment planning model is developed which is a decision-making model for determining the optimum employment level with respect to varying net manpower requirement for each planing period such that total cost in a planning horizon is minimized. It is constructed as a nonlinear programming model and a dynamic programming model on the basis of studies in the areas of production smoothing and manpower scheduling. Costs for a planning period are categorized into regular wage cost, hiring cost, and overtime cost. The first is a linear function. The other two cost functions are of quadratic nature. The planning horizon of this planning model is intermediate range (five years) for which a fair planning accuracy can be guaranteed. The model considers learning period for each job class. It is simple and an optimum solution can be easily obtained by direct search techniques.

  • PDF

Branch and Bound Approach for Single-Machine Sequencing with Early/Tardy Penalties and Sequence-Dependent Setup Cost

  • Akjiratikarl, Chananes;Yenradee, Pisal
    • Industrial Engineering and Management Systems
    • /
    • v.3 no.2
    • /
    • pp.100-115
    • /
    • 2004
  • The network representation and branch and bound algorithm with efficient lower and upper bounding procedures are developed to determine a global optimal production schedule on a machine that minimizes sequence-dependent setup cost and earliness/tardiness penalties. Lower bounds are obtained based on heuristic and Lagrangian relaxation. Priority dispatching rule with local improvement procedure is used to derive an initial upper bound. Two dominance criteria are incorporated in a branch and bound procedure to reduce the search space and enhance computational efficiency. The computational results indicate that the proposed procedure could optimally solve the problem with up to 40 jobs in a reasonable time using a personal computer.