• Title/Summary/Keyword: production scheduling

Search Result 450, Processing Time 0.034 seconds

Pallet-fixture Allocation in Reconfigurable Manufacturing Cells: An Integrative Approach (재구성형 모듈러셀의 팔레트-치구 할당: 통합적 접근)

  • Han, Su-Min;Seo, Jin-Wu;Park, Jin-Woo;Lee, Jong-Kuk;Kang, Kyung-Chul;Lee, Sang-Ho;Moon, Jum-Seang
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.4
    • /
    • pp.357-366
    • /
    • 2012
  • To schedule a Reconfigurable Manufacturing Cell (RMC), reconfiguration and setting decisions should be made first. Those decisions, together with characteristics of production orders, affect attainable performance of a system. So an integrative approach is required considering all decisions and characteristics rather than dealing with each of them separately. Pallet-fixture allocation, as a decision problem in setting, which determines the number of pallets to be equipped with each fixture type to produce different types of products, has rarely been investigated. In this study, several pallet-fixture allocation rules are proposed including both simple and novel ones. Then system performance is investigated through various combinations of setting and scheduling decisions (rules) for given system configurations and production orders, via simulation. The result shows that one of proposed pallet-fixture allocation rules which considers both configuration and order characteristic outperforms the others, justifying the necessity of an integrative approach in the RMC operation.

A Study on the Development and Application of a Small Shipyard Customized Production Process Planning and Management System (소형조선소 맞춤형 생산공정 계획관리 시스템 개발 및 적용에 관한 연구)

  • Kim, Young-Hun;Hong, Min-Jong;Baek, Seung-Ju;Lee, Won-Seok;Jo, Yong-Hwa;Lee, Dae-Hyung;Lee, Hoon-Sick;Na, Sung-Tae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.1
    • /
    • pp.79-86
    • /
    • 2022
  • In general, since the types and types of ships, so complex and various variables are included to measure the amount of construction work. In addition, it is mot easy to predict the schedule or the number of working hours before ship construction, and it is also mostly inaccurate. As a result, the master plan is manually drawn up by the expert's experience, but there are limitations due to various factors. Medium and large shipyards are operating APS(Advanced Planning and Scheduling) system that reflects industrial characteristics to improve productivity in the planning stage, and utilize information from systems such as ERP(Enterprise Resource Planning) system and MES (Manufacturing Execution System). On the other hand, small shipyards rely mostly on manual work such as Excel work based on the experience of the workers. Therefore, this study intends to develop a master plan management system that can efficiently manage the production process from the business planning stage in consideration of the characteristics of small shipyards.

A Solution of Production Scheduling Problem adapting Fast Model of Parallel Heuristics (병렬 휴리스틱법의 고속화모델을 적용한 생산 스케쥴링 문제의 해법)

  • Hong, Seong-Chan;Jo, Byeong-Jun
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.4
    • /
    • pp.959-968
    • /
    • 1999
  • several papers have reported that parallel heuristics or hybrid approaches combining several heuristics can get better results. However, the parallelization and hybridization of any search methods on the single CPU type computer need enormous computation time. that case, we need more elegant combination method. For this purpose, we propose Fast Model of Parallel Heuristics(FMPH). FMPH is based on the island model of parallel genetic algorithms and takes local search to the elite solution obtained form each island(sub group). In this paper we introduce how can we adapt FMPH to the job-shop scheduling problem notorious as the most difficult NP-hard problem and report the excellent results of several famous benchmark problems.

  • PDF

Scheduling Generation Model on Parallel Machines with Due Date and Setup Cost Based on Deep Learning (납기와 작업준비비용을 고려한 병렬기계에서 딥러닝 기반의 일정계획 생성 모델)

  • Yoo, Woosik;Seo, Juhyeok;Lee, Donghoon;Kim, Dahee;Kim, Kwanho
    • The Journal of Society for e-Business Studies
    • /
    • v.24 no.3
    • /
    • pp.99-110
    • /
    • 2019
  • As the 4th industrial revolution progressing, manufacturers are trying to apply intelligent information technologies such as IoT(internet of things) and machine learning. In the semiconductor/LCD/tire manufacturing process, schedule plan that minimizes setup change and due date violation is very important in order to ensure efficient production. Therefore, in this paper, we suggest the deep learning based scheduling generation model minimizes setup change and due date violation in parallel machines. The proposed model learns patterns of minimizing setup change and due date violation depending on considered order using the amount of historical data. Therefore, the experiment results using three dataset depending on levels of the order list, the proposed model outperforms compared to priority rules.

Spatial Scheduling in Shipbuilding Industry

  • Duck Young Yoon;Varghese Ranjan;Koo Chung Kon
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.106-110
    • /
    • 2004
  • In any large heavy industry like that of ship building, there exist a lot of complications for the arrangement of building blocks optimally for the minimal space consumption. The major problem arises at yard because of laxity in space for arranging the building blocks of ship under construction. A standardized erection sequence diagram is generally available to provide the prioritised erection sequence. This erection sequence diagram serves as the frame work. In order to make a timely erection of the blocks a post plan has to be developed so that the blocks lie in the nearest possible vicinity of the material handling devices while keeping the priority of erection. Therefore, the blocks are arranged in the pre-erection area. This kind of readiness of blocks leads to a very complex problem of space. This arises due to the least available space leading to an urgent need of an availability of intelligent spatial schedule without compromising the rate of production. There exists two critical problems ahead namely, the spatial occupation layout of pre-erection area and the emptying pattern in the spatial vicinity. The block shape is assumed be rectangular. The related input data's are the dates of erection (earliest as well as the latest), geometrical parameters of block available on pre-erection area, slack time and the like.

  • PDF

Quality Verification of Legacy Data of Manufacturing Information System to Improve Results of Shipyard Manufacturing Logistics Simulation (조선소 생산물류 시뮬레이션 결과 정도 향상을 위한 생산정보시스템 기간 정보 검증)

  • Lee, Jonghak;Lee, Philippe;Yoon, Kyungwon;Nam, Jong-Ho
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.6
    • /
    • pp.510-520
    • /
    • 2014
  • Unlike other mass production in small variety, shipbuilding process is a project-based method in single variety, which causes unpredictable volatility in the planning system. In shipyards, series of manufacturing processes from fabrication to erection is sequentially carried out. In order to predict unfavorable changes such as overload or low load of working volume, computerized simulation has been being gradually adopted. The data used in the simulation are processed from the database of the main scheduling and planning system. Thus the quality of those data is very crucial for the meaningful results. Unfortunately, research on the verification of data quality is very rare and hardly known to the authors. In this work, using the database of scheduling and product information system of a large domestic shipyard, the data required for the simulation are qualitatively analyzed and verified.

GIS Application for Planning Roadway Construction (도로 공사의 시공계획을 위한 GIS의 적용)

  • Kang Sang-Hyeok;Seo Jong-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.565-568
    • /
    • 2003
  • Roadway construction planning processes involve a large amount of information on design, construction methods, quantities, unit costs, and production rates. GIS (Geographic Information System) is a strong tool for integration and managing various types of information such as spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Spatial Analysis' and 'Visualization' functions. The proposed system cail help construction planner make a proper decision in a unique way by integrating design information and construction information within the system and creating design element modules for space scheduling purposes in real-time with its 'Interactive Planning' function.

  • PDF

Development of Heterarchical SFCS Execution Module using E-Net (E-Net을 이용한 Heterarchical SFCS 실행 모듈 개발)

  • Hong, Soon-Do;Cho, Hyun-Bo;Jung, Moo-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.25 no.1
    • /
    • pp.87-99
    • /
    • 1999
  • A shop floor control system(SFCS) performs the production activities required to fill orders. In order to effectively control these activities, the autonomous agent-based heterarchical shop floor control architecture is adopted where a supervisor does not exist. In this paper, we define functional perspective of the heterarchical shop floor control using planning, scheduling, and execution modules. In particular, we focus on an execution module that can coordinate the planning and scheduling modules and a general execution module that easily can be modified to execute the other equipment. The execution module can be defined informally as a module that downloads and performs a set of scheduled tasks. The execution module is also responsible for identifying and resolving various errors whether they come from hardware or software. The purpose of this research is to identify all the execution activities and solving techniques under the assumptions of the heterarchical control architecture. And we model the execution module in object-oriented modelling technique for generalization. The execution module modeled in object-oriented concept can be adopted to the other execution module easily. This paper also proposes a classification scheme for execution activities of the heterarchical control architecture. Petri-nets are used as a unified framework for modeling and controlling execution activities. For solving the nonexistence of a supervisor, a negotiation-based solution technique is utilized.

  • PDF

Knowledge-based Approach for Solving Short-term Power Scheduling in Extended Power Systems (확장된 발전시스템에서 지식기반 해법을 이용한 단기운영계획 수립에 관한 연구)

  • 김철수
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.23 no.2
    • /
    • pp.187-200
    • /
    • 1998
  • This paper presents an original approach for solving short-term power scheduling in extended power system with two fuels in a unit and a limited fuel using Lagrangian relaxations. The underlying model incorporates the full set of costs and constraints including setup, production, ramping, and operational status, and takes the form of a mixed integer nonlinear control problem. Moreover, the mathematical model developed includes two fuels in a unit and a limited fuel, regulation reserve requirements of prespecified group of units. Lagrangian relaxation is used to disaggregate the model by generator into separate subproblems which are then solved with a nested dynamic program including empirical knowledges. The strength of the methodology lies partially in its ability to construct good feasible solutions from information provided by the dual. Thus, the need for branch-and-bound is eliminated. In addition, the inclusion of two fuels in a unit and a limited fuel provides new insight into the limitations of current techniques. Computational experience with the proposed algorithm indicates that Problems containing up to 23 units including 8 unit used two fuels and 24 time periods can be readily solved in reasonable times. Duality gaps of less than 4% were achieved.

  • PDF

A petri-net based execution model of processing equipment for CSCW-based shop floor control in agile manufacturing

  • Hong, Soondo;Cho, Hyuenbo;Jung, Mooyoung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.04a
    • /
    • pp.193-200
    • /
    • 1995
  • A shop floor control system(SFCS), a central part of agile manufacturing, performs the production activities required to fill orders. In order to effectively control these activities, CSCW (computer supported cooperative work) is adopted where a supervisor does not exist. In this paper, we define functional perspective of CSCW-based shop floor control using planning, scheduling, and execution functions. In particular, we focus on an execution model that can coordinate the planning and scheduling functions. Execution can be defined informally as a function that downloads and performs a set of scheduled tasks. Execution is also responsible for identifying and resolving various errors whether they come from hardware or software. The purpose of this research is to identify all the execution activities and solving techniques under the assumptions of CSCW-based heterarchical control architecture. This paper also proposes a classification scheme for execution activities of CSCW-based heterarchical control architecture. Petri-nets are used as a unified framework for modeling and controlling execution activities. For solving the nonexistence of a supervisor, A negotiation-based solution technique is utilized.

  • PDF