• Title/Summary/Keyword: procurement management

Search Result 484, Processing Time 0.025 seconds

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF

A Study on the Prediction of Referral Intension based on Customer Satisfaction in Construction Management (CM에서 고객만족도에 기반한 추천의향 예측에 관한 연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.100-110
    • /
    • 2010
  • The main roots of CM service contracts include existing customer repurchases and those made by new customers by existing ones. The study on customers and loyalty can be factors to strengthen CM's competitiveness. However, there have been little attempt to study customer satisfaction and customer loyalty. Construction Management (CM), the advanced construction management method, was introduced 15 years ago in the mid 1990's in the domestic market. The aim of this research is to build a model that can predict customer loyalty based on how much customers are satisfied with CM service. To measure customer satisfaction and loyalty, this research surveyed 135 decision-makers who have experienced CM services. Customer satisfaction was tested and analyzed according to different phases: planning, designing, procurement, construction, and post construction. Referral intention was tested based on NPS theory. Customer types were divided into detractors, passively satisfied and promoters according to the tested measurement and multinomial logistic regression between the satisfaction by construction phases and customer types. This research resulted to a model that can predict customer types: detractors, passively satisfied and promoters, which were determined according to satisfaction level. The initial planning phase also revealed which factor is most influential for a customer to become promoter. These results can be used to acquire customer loyalty by managing the satisfaction of customers through a project under an Internet-based environment. Such can provide the needed information in quickly exploring positive and negative word-of-mouth feedbacks.

Analysis of Construction Policy System for Quality Assurance of Construction Used Steels (건설용 강재의 품질확보를 위한 건설제도 분석 연구)

  • Yoon, Jongsik;Yu, Ilhan;Kim, Kyungrai;Jung, Daewoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.3-13
    • /
    • 2019
  • Recently, quality problems of steel used for construction have been raised as a cause of building collapse and safety accidents. Accordingly, it becomes more important to secure quality through material management, procurement management, and construction management for construction used steels. However, the quality management for construction used steels is confined to technical production and process control. So, it does not provide a solution of various non-conforming steel products issues. Therefore, this study suggests improvements of the construction system to secure quality of the construction used steels. Through expert interviews, we identify the items for system improvement and derive the top priority items by considering utility through a structured Analytic Hierarchy Process (AHP). It also divided the respondents into enterprise and research groups to analyze differences, implications and future improvement issues and suggest a road map. It is expected that the priority items derived in this study could be useful as a basic data for making policy decisions to assure the quality of construction used steel.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

Development of Web-based Facility Management System by utilizing Information in Construction Phase (시공단계 정보 활용을 통한 웹 기반 유지관리 시스템 개발)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.99-106
    • /
    • 2004
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility, Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from an asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

Risk-Based Performance Evaluation and Prediction Tool by Characterizing Construction Projects in Pre-Project Planning (초기 단계 프로젝트 특성을 고려한 리스크 평가 및 예측 툴 개발)

  • Shin, Kang-Yong;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.168-175
    • /
    • 2008
  • Project risk factors are major triggers in cost performance in construction projects. Both owners and contractors are highly concerned in managing their risks in earlier times. As such, it is needed to provide a robust risk evaluation methodology in identifying and assessing the potential risks before project execution. In previous research, risk identification was conducted only in specific phases, i. e., design, procurement, construction. Therefore, the comprehensive approach in risk management was limited and their quantifying method was not well-defined. Since the benefit of planning in earlier times are maximized compared to later times, the risk management should be implemented in earlier planning stage. This study provide a new risk evaluation method by incorporating previous research and extensive literature review. By quantifying each risk factor from an extensive industry survey, the proposed tool can enhance the reliability of each factor weight and also the weights are categorized from a various perspectives, i.e., owners, contractors, lager-scale company, smaller-scale company, building projects. The proposed tool can be also useful in deciding on whether to proceed a particular project and How much the project contingency would be set aside in project execution. The study findings can also expedite the risk management procedure in a more systematic approach.

Development of a Safety and Health Expense Prediction Model in the Construction Industry (건설업 산업안전보건관리비 예측 모델 개발 - 일반건설공사(갑)의 공사비 50억미만 공사를 대상으로 -)

  • Yeom, Dong Jun;Lee, Mi Young;Oh, Se Wook;Han, Seung Woo;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.63-72
    • /
    • 2015
  • The importance of the appropriate use and procurement of Safety and Health Expense has been increasing along with the recent increase of construction projects in height, size and complexity. However, the current standards for deducting the Safety and Health Expense have shown limitations in applying the properties and environment of the construction project due to its Safety and Health Expense Rate's classification method. Therefore, the purpose of this study is to develop a prediction model for the Safety and Health Expense that enables the consideration of different environment and properties of construction projects. The study uses multiple regression analysis to analyze the Safety and Health Expense of Ordinary(A) of less than 0.5 billion WON. The research results have shown that the use of multiple regression analysis reduces the error rate to 4.38% which the current standard calculation method have shown 18.48%. Therefore, the use of the suggested model provides reliable Safety and Health Expense prediction values that considers the properties of the project. It is expected that the results of this study contributes to the effective safety management by providing the appropriate amount of Safety and Health Expense to the project. In this study, only projects of less than 5 billion WON have been considered in the analysis. Therefore, more data is required for future studies to suggest an overall Safety and Health Expense predict ion model that covers the whole construction industry.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

Strategic Approaches to Solid Ranking International Journals: KODISA Journals (국제저널 육성 방향과 전망: KODISA Journals를 중심으로)

  • Youn, Myoung-Kil;Kim, Dong-Ho;Lee, Jong-Ho;Hwang, Hee-Joong;Lee, Jung-Wan
    • Journal of Distribution Science
    • /
    • v.12 no.6
    • /
    • pp.5-13
    • /
    • 2014
  • Purpose - The purposes of this editorial review are twofold: firstly, to introduce the four flagship international journals of the Korea Distribution Science Association(KODISA): the Journal of Distribution Science(JDS), the Journal of Industrial Distribution & Business(JIDB), the East Asian Journal of Business Management(EAJBM), and the Journal of Asian Finance, Economics and Business(JAFEB), and secondly, to identify the direction of the KODISA journals and the roles and responsibilities of the editors of the KODISA journals. Research design, data, and methodology - To achieve the goals, firstly, this review paper addresses the current progress of the four KODISA journals: JDS, JIDB, EAJBM, and JAFEB. Secondly, this paper defines the aims and missions of the four KODISA journals. JDS publishes the articles of examining past, current, and emerging trends and concerns in the area of distribution science and economics, logistics and SCM, transportation, distribution channel management, distribution innovation and information technology, merchandising and procurement, distribution and marketing, consumer behavior, and manufacturing, wholesaling, and retailing. JDS publishes both quantitative and qualitative research as well as scholarly commentaries, case studies, book reviews and other types of reports relating to all aspects of distribution. JIDB publishes the articles of examining past, current, and emerging trends and concerns in the areas of industry and corporate behavior, industry policy making, industrial distribution and business, e-commerce, and service industry. EAJBM publishes empirical and theoretical research papers as well as scholarly commentaries, case studies, book reviews, and other types of reports relating to all aspects of East Asian business and economy. JAFEB publishes original research analysis and inquiry into the contemporary issues of finance, economics and business management in Asia, including Central Asia, East Asia, South Asia, Southeast Asia, and Middle East. The mission of JAFEB is to bring together the latest theoretical and empirical finance, economics and business management research in Asian markets. The audiences of the KODISA journals include higher education institutions, scholars, industry researchers and practitioners, scientists, economists, and policy makers throughout the world. The main mission of the KODISA journals is to provide an intellectual platform for international scholars, promote interdisciplinary studies in social sciences and economics, and become leading journals in the social science and economics category in the world. Thirdly, this paper addresses the current status of indexing in major databases of the KODISA journals, namely: Cabell's Directories, EBSCO, SCOPUS (Elsevier), and Social Sciences Citation Index® (SSCI, Thomson Reuters). Fourthly, this paper identifies the roles and responsibilities of the editors of the KODISA journals as the following: (1) Make sure that the journal be published in a timely manner and in international standards both in print and online versions. (2) Maintain the online homepage of the journal is always accessible to, and (3) Make sure that every article should go through a peer review process that meets international standards. Findings and conclusion - To accomplish the goals and missions of the KODISA journals, the editors of the KODISA journals must work together to publish high scholarly journals that meet international standards of journal publications.