• 제목/요약/키워드: procurement management

검색결과 484건 처리시간 0.022초

국내 철근공사 실태분석 및 개선방안에 관한 연구 (A Study on the Actual Condition Analysis and Improvement of Rebar Work in Korean Building Construction)

  • 박우열;김광희;강경인
    • 한국건축시공학회지
    • /
    • 제4권3호
    • /
    • pp.83-91
    • /
    • 2004
  • With labor shortage and high-wage era, the construction cost is rising and the construction business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. However, although reinforcing bar(rebar) work, which greatly effects the building's safety, endurance, and construction time, is an important phase in construction, it holds serious problem of quality and productivity deterioration due to its characteristic of intensive-labor and maintaining of old work methods resulting in poor management, and costs increase. Therefor in this study to investigate current situation and problems of rebar work and to find methods of betterment, a survey was conducted to site engineers and individuals in division of cost estimate of domestic construction company. The survey questions were on the subjects of (1) calculating rebar quantity, (2) ordering and procurement, (3) rebar cutting and bending, and (4) rebar work management. Method of improvement was sought by analyzing the results of the survey

백화점 중간관리 형태에서 패션제품 판매원의 패션업체에 대한 인식 (Fashion Product Salesperson's Perception of Fashion Company in the Middle Management System of Department Store)

  • 이현진;추태귀
    • 한국의류산업학회지
    • /
    • 제13권5호
    • /
    • pp.705-716
    • /
    • 2011
  • The purpose of this study was to investigate salesperson's perception of fashion company in the middle management system of department store. This study was conducted by a qualitative research method. An in-depth interview was managed to 14 fashion shop managers and salesperson who have three or more years of work experience at the department store. Interview details were classified three categories: relations with fashion company and others, concern with products supply, concern with products sales. First, the positive factors on relations with fashion company are mutual trust, stability of fashion company, coordination and consideration for shop, communication with fashion company, methodical IT system, methodical education, and social gathering support. The negative factors are unilateral breach of contract from fashion company, communication problem, gap between sales status in shop and product design in fashion company, lack of professional education, difficulty of participating in education, and inadequate employee benefits. Second, the positive factor on products supply is priority of products supply. The negative factors are lack of main items, product procurement lacking rapidity, and problem of securing a supply. Third, the positive factors on products sales are brand pride, display and information support about products, and free gift support. The negative factors are unfair selling commission policy, sales pressure, and excessive responsibility.

Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • 제15권3호
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권4호
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.

Formal Governance Mechanism and its Application in Construction Projects

  • Banihashemi, Seyed Yaser;Liu, Li
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권1호
    • /
    • pp.22-27
    • /
    • 2013
  • Inter-organizational Relationships (IORs) governance is one of the emerging research areas that have been studied in different contexts (e.g. economics, strategy, organization, and management). This view, particularly, attracted rising attention from academics and practitioners in the context of construction projects, due to the complex forms of IORs in terms of inter-firm exchanges (e.g. engineering, procurement, finance, construction, and operation) in these projects. The focus of IORs governance is to control Inter-organizational relationships among two or more cooperative parties to alleviate conflict and achieve mutual gains. One of the mechanisms that have been identified in the related literature is formal governance mechanism. Although many empirical studies have been conducted using formal governance terms and indicators, there isn't yet a consensual definition of this mechanism and its components that may cause misinterpretation of research results and also impede future research. This paper makes contribution to the concept of IORs governance by clarifying the meaning of formal governance mechanism and identifying different indicators of this mechanism that have been used and identified in previous studies. This provides an innovative and useful framework to understand formal governance mechanism and its application in construction projects.

A Study of E-commerce-based Capabilities of Small Firms with Cloud Computing Techniques

  • Zhou, Xuesong;Kim, Kyung-Tae
    • Journal of Information Technology Applications and Management
    • /
    • 제27권4호
    • /
    • pp.21-36
    • /
    • 2020
  • E-commerce represents the acquisition and sale, or the transmission of funds or data through an electronic platform. E-commerce is a paradigm shift that influences marketers and customers to improve current market processes. The significant challenges in e-commerce are the accuracy and performance factors during a business transaction, which has been substantially enhanced using Cloud Computing Techniques (CCT). The growth of e-commerce management has been increased due to massive internet penetration, and particularly small and emerging companies are increasingly using this alternative as a differentiated business model. E-commerce has significant environmental impacts and highly utilized in today's market scenario. Further, the replacement has not been thoroughly explored. Current research has been carried out to describe the e-commerce scenario to analyze market trends. This study further discusses the essential variables to the performance of market models for e-commerce. For example, e-procurement of products/services, electronic supply chain management, e-distribution and selling support (supplier connections, e-fulfilment) and online e-auctions (transactional) can represent important e-commerce capabilities, which can contribute to marketing strategy implementation effectiveness, resulting in higher export performance.

물류창고 불출자 로드밸런스율 증대 휴리스틱 알고리즘 개발 (A Study on the Heuristic Algorithm Development for Load Balance Ratio Increase of Workers in Warehouse)

  • 전욱;장정환;장청윤;조용철;이창호
    • 대한안전경영과학회지
    • /
    • 제19권1호
    • /
    • pp.203-210
    • /
    • 2017
  • Companies are pursuing the management of small quantity batch production or JIT(Just-in-time) system for improving the delivery response and LOB(Line Balancing) in order to satisfy consumers' increasing demands in the current global economic recession. And in order to improve the growth of production for reducing manufacturing cost, improvements of the Load Balancing have become an important reformation factor. Thus this paper is aimed at warehouse which procures materials on the assembly line in procurement logistics of automotive logistics and proceed with research on heuristic algorithm development which can increase the Load Balancing of workers. As a result of this study, when applied the primary target value, it was verified that the whole workers decreased from 28 to 24. Furthermore, when specified the secondary target value and applied algorithm once more, it was verified that the Load Balance Ratio was improved from 44.96% to 91.7%.

석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안 (A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project)

  • 조홍연;유호선
    • 플랜트 저널
    • /
    • 제7권4호
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION

  • F. Nasirzadeh;N. Naderpajouh;A. Afshar;A. Etesami
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.662-671
    • /
    • 2007
  • Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

  • PDF

FORMAL GOVERNANCE MECHANISM AND ITS APPLICATION IN CONSTRUCTION PROJECTS

  • S. Yaser Banihashemi;Li Liu
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.321-327
    • /
    • 2013
  • Inter-organizational Relationships (IORs) governance is one of the emerging research areas that have been studied in different contexts (e.g. economics, strategy, organization, and management). This view, particularly, attracted rising attention from academics and practitioners in the context of construction projects, due to the complex forms of IORs in terms of inter-firm exchanges (e.g. engineering, procurement, finance, construction, and operation) in these projects. The focus of IORs governance is to control Inter-organizational relationships among two or more cooperative parties to alleviate conflict and achieve mutual gains. One of the mechanisms that have been identified in the related literature is formal governance mechanism. Although many empirical studies have been conducted using formal governance terms and indicators, there isn't yet a consensual definition of this mechanism and its components that may cause misinterpretation of research results and also impede future research. This paper makes contribution to the concept of IORs governance by clarifying the meaning of formal governance mechanism and identifying different indicators of this mechanism that have been used and identified in previous studies. This provides an innovative and useful framework to understand formal governance mechanism and its application in construction projects.

  • PDF