• Title/Summary/Keyword: process of completion

Search Result 587, Processing Time 0.028 seconds

Lot-Streaming Flow Shop Problem with Delivery Windows (딜리버리 윈도우 로트-스트리밍 흐름 공정 문제)

  • Yoon, Suk-Hun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.2
    • /
    • pp.159-164
    • /
    • 2004
  • Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots and then scheduling these sublots in order to accelerate the completion of jobs in a multi-stage production system. Anew genetic algorithm (NGA) is proposed for an-job, m-machine, equal-size sublot lot-streaming flow shop scheduling problem with delivery windows in which the objective is to minimize the mean weighted absolute deviation of job completion times from due dates. The performance of NGA is compared with that of an adjacent pairwise interchange (API) method and the results of computational experiments show that NGA works well for this type of problem.

SINGLE MACHINE GROUP SCHEDULING UNDER DECREASING LINEAR DETERIORATION

  • Wang, Ji-Bo;Guo, Ai-Xia;Shan, Feng;Jiang, Bo;Wang, Li-Yan
    • Journal of applied mathematics & informatics
    • /
    • v.24 no.1_2
    • /
    • pp.283-293
    • /
    • 2007
  • This paper considers single machine scheduling problems with group technology (GT) and deteriorating jobs. A sequence independent setup is required to process a job from a different group and jobs in each group are processed together. We consider the case of jobs whose processing times are a decreasing function of their starting time. The objectives of scheduling problems are to minimize the makespan and the total completion time, respectively. We also provide polynomial time algorithms to solve these problems.

Adjust timing of Construction Construction Evaluation (건설공사 시공평가 시기 조정)

  • Yoon, Ji-Ho;Nam, Keong-Woo;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.78-79
    • /
    • 2019
  • A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

  • PDF

Performance Analysis of Checkpointing and Dual Modular Redundancy for Fault Tolerance of Real-Time Control System (실시간 제어 시스템의 결함 극복을 위한 이중화 구조와 체크포인팅 기법의 성능 분석)

  • Ryu, Sang-Moon
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.14 no.4
    • /
    • pp.376-380
    • /
    • 2008
  • This paper deals with a performance analysis of real-time control systems, which engages DMR(dual modular redundancy) to detect transient errors and checkpointing technique to tolerate transient errors. Transient errors are caused by transient faults and the most significant type of errors in reliable computer systems. Transient faults are assumed to occur according to a Poisson process and to be detected by a dual modular redundant structure. In addition, an equidistant checkpointing strategy is considered. The probability of the successful task completion in a real-time control system where periodic checkpointing operations are performed during the execution of a real-time control task is derived. Numerical examples show how checkpoiniting scheme influences the probability of task completion. In addition, the result of the analysis is compared with the simulation result.

CHECKLIST FOR ENVIRONMENTAL FRIENDLY CONSTRUCTION MANAGEMENT IN DESIGN PHASE

  • In-Su Jung;Hyun-Su Park;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.376-385
    • /
    • 2007
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.

  • PDF

A Study on Order Release Scheduling by Lead Time Offsetting Technique (시간차감법에 의한 발주계획연구)

  • 민경석
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.8 no.11
    • /
    • pp.45-56
    • /
    • 1985
  • This thesis studies the order release scheduling by lead time offsetting technique in MRP system. MRP is the process of working backward from the scheduled completion dates of end products or major assemblies to determine the dates and quantities when the various component parts and materials are to be ordered. It aims getting the right quantity of component parts to the right places at the right time with a schedule that puts each parts or subassembly into stock shortly ahead of the need for that parts or subassembly. The planned order release point of a item can be easily decided when the scheduled completion date and planned lead time is certain and known before by lead time offsetting technique in MRP system.

  • PDF

Software Taskset Processing Evaluation Based on a Mixed Debugging Process

  • Kim, U-Jung;Lee, Chong-Hyung
    • Communications for Statistical Applications and Methods
    • /
    • v.19 no.4
    • /
    • pp.571-577
    • /
    • 2012
  • Modules that consist of software are respectively coded in the early development phase and the modules are unified as a software. After unification, the software is repeatedly tested with a given taskset (the set of module tasks that are tested simultaneously) until a required performance level is satisfied. In this paper, we expand the one-module software debugging model of Jang and Lee (2011) to a multi-module debugging model and derive the taskset completion probability and the mean of the completed tasksets under the assumption that the processing times of module tasks given in a taskset are mutually dependent.

Shape and Appearance Repair for Incomplete Point Surfaces (결함이 있는 점집합 곡면의 형상 및 외관 수정)

  • Park, Se-Youn;Guo, Xiaohu;Shin, Ha-Yong;Qin, Hong
    • Korean Journal of Computational Design and Engineering
    • /
    • v.12 no.5
    • /
    • pp.330-343
    • /
    • 2007
  • In this paper, we present a new surface content completion system that can effectively repair both shape and appearance from scanned, incomplete point set inputs. First, geometric holes can be robustly identified from noisy and defective data sets without the need for any normal or orientation information. The geometry and texture information of the holes can then be determined either automatically from the models' context, or manually from users' selection. After identifying the patch that most resembles each hole region, the geometry and texture information can be completed by warping the candidate region and gluing it onto the hole area. The displacement vector field for the exact alignment process is computed by solving a Poisson equation with boundary conditions. Out experiments show that the unified framework, founded upon the techniques of deformable models and PDE modeling, can provide a robust and elegant solution for content completion of defective, complex point surfaces.

Knowledge-based Decision Support System for Process Planning in the Electric Motor Manufacturing (전동기 제조업의 지식기반 공정계획 지원시스템에 관한 연구)

  • Song, Jung-Su;Kim, Jae-Gyun;Lee, Jae-Man
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.159-176
    • /
    • 1998
  • In the motor manufacturing system with the properties of short delivery and order based production, the process plan is performed individually for each order by the expert of process plan after the completion of the detail design process to satisfy the specification to be required by customer. Also it is hard to establish the standard process plan in reality because part routings and operation times are varied for each order. Hence, the production planner has the problem that is hard to establish the production schedule releasing the job to the factory because there occurs the big difference between the real time to be completed the process plan and the time to be required by the production planner. In this paper, we study the decision supporting system for the process plan based on knowledge base concept. First, we represent the knowledge of process planner as a database model through the modified POI-Feature graph. Then we design and implement the decision supporting system imbedded in the heuristic algorithm in the client/server environment using the ORACLE relational database management system.

  • PDF

Microbilolgical Studies on the Takju (Makguly) Brewing : The Korean Local Wine (한국 고유주의 일종인 막걸리에 대한 미생물학적 연구)

  • Koh, Choon-Myung;Choi, Tae-Joo;Lew, Joon
    • Korean Journal of Microbiology
    • /
    • v.11 no.4
    • /
    • pp.167-174
    • /
    • 1973
  • This study included two parts of investigation, the microfloral changes during the brewing process with the changes of pH, total acidity, temperature and alcoholic contents, as well as determination of survival times of major enteric pathogens in Takju. 1. Maximum number of Saccharomyces cerevisiae was $4.3{\times}10^7$ per milliliter on the 5th day of fermentation and gradually decreased. Saccharomyces cerevisiae was one of the predominant strains of the fermentation process. The number of Saccharomyces cerevisiae was $4.3{\times}10^6$ per milliliter at the completion of the brewing and human consumption. In a few days after the completion of the brewing. Bacillus subtilis and some species of Staphylococcus spp. began to grow and those organisms were responsible for the spoilage. 2. Maximum pH, during the brewing, was 5.8 on the first day of fermentation and rapidly decreased until 6th day of fermentation at pH 4.3. 3. Maximum alcholic content was 14.5 degree on the 4th day of fermentation, 10.3 degree on the 5th day and this degree was continued during the experimentation. 4. Maximum temperature, during Takju brewing was 34.deg.C on the 3rd day of fermentation and rapidly decreased up to 23.deg.C on the 6th day and this temperature was continued until the brewing process was finished. 5. Maximum total acidity was 0.57 percent on the 4th day of fermentation and gradually decreased by brewing process was completed. 6. Survival time of major enteric pathogenic bacteria in Takju was as follows : Shigella dysenteriae and Escherichia coli were isolated in two hours and 14 hours respectively, but Salmonella typhi, Vibrio parahemolyticus were not isolated even in an hour after the inoculation of those organisms in undiluted Takju. In diluted Takju, Salmonella typhi, Vibrio parahemolyticus were not isolated even in an hour after the inoculation of those organisms in undiluted Takju. In diluted Takju, Salmonella typhi, Shigella dysenteriae, and Escherichia coli were survived for 50-60 hours, but Vibrio cholerae and Vibrio parahemolyticus were not isolated even if treated within one hour.

  • PDF