• Title/Summary/Keyword: process of completion

Search Result 586, Processing Time 0.028 seconds

Enhancing Venous Anastomosis Visualization in Murine Kidney Transplants: The Two Stay Suture Technique

  • Jong-Min Kim
    • Journal of Veterinary Clinics
    • /
    • v.40 no.6
    • /
    • pp.423-428
    • /
    • 2023
  • The mouse kidney transplantation model serves as an invaluable tool for exploring various aspects of the transplant process, including acute rejection, cellular and humoral rejection, ischemia-reperfusion injury, and the evaluation of novel therapeutic strategies. However, conducting venous anastomosis in this model poses a significant challenge due to the thin and pliable characteristics of the renal vein, which often obstruct clear visualization of the resected vein's edge. This study proposes the adoption of a two stay suture technique to enhance the visualization of the renal vein's edge, thereby facilitating efficient and successful venous anastomosis. A total of 22 mice served as kidney donors in this study. The conventional anchoring suture technique was employed for venous anastomosis in 11 of these mice, while the remaining 11 underwent the two stay suture technique. The anastomosis duration and completion rates were then compared between these two groups. The conventional anchoring suture technique yielded an average anastomosis time of 29 minutes and a completion rate of 64%. In contrast, the two stay suture technique demonstrated a substantial improvement, with an average anastomosis time of 14 minutes and a completion rate of 100%. The two stay suture technique offers a promising solution to enhance visualization during venous anastomosis in murine kidney transplantation. This technique may particularly benefit novices by enabling them to perform venous anastomosis more easily, swiftly, and successfully.

An Analysis of Locational Factors to Affect Residential Improvement Projects in Busan Metropolitan City (부산의 주거정비사업 추진에 미치는 영향요인 분석)

  • Kim, Jung-Don;Oh, Se-Kyung;Lim, Jae-Moon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.1
    • /
    • pp.125-132
    • /
    • 2012
  • Busan metropolitan city faced with very low completion rate of residential environment improvement projects. Main reason is to designate proposed residential environment improvement areas without careful analysis of the possibilities of the improvement project completion. This study aims to clarify and analyze the phase characteristics of residential environment improvement process by using 12 variables representing 5 locational characteristics such as place factors, topological factors, size factors, location condition factors and regulation factors. From results of the analysis, this study finds that business floor area ratio, improvement type and site size affect significantly the completion rate of residential redevelopment projects. However, business floor ratio, improvement type, width of frontage road and slope are significant variables to affect the completion rate of residential rebuilding projects.

Global Project Finance Trends and Commercial Risk Analysis (글로벌 프로젝트 파이낸스 최근 동향 및 상업위험 분석)

  • Kim, Sang Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.61
    • /
    • pp.273-302
    • /
    • 2014
  • Project finance ("PF") is a method of raising long-term debt financing based on lending against the cash flow generated by the project alone. Project finance is a nonrecourse or limited recourse financing structure against the sponsors(or the investors). The debt terms in a project finance are not based on the creditor's credit support or on the value of the assets of the project. Lenders rely on the future cash flow to be generated by the project for debt repayment and interest, rather than the value of the project or the credit ratings of the sponsors. The non-recourse or limited recourse financing usually prompt potential project finance lenders to assess carefully all possible risks that might arise in a project to ensure that those risks are mitigated and controlled. In this respect, project finance is a opposite financing method of corporate finance. Project finance has rapidly grown over the last 20 years due to the worldwide process of privatization of public sector and development of natural resources. Global project finance volume reached the record USD 406.5 billion in 2011. In 2012, however, Global project finance volume dropped 6% to USD 382.3 billion. Infrastructure overtook Energy to lead all sectors with USD 113.6 billion. It is generally recognized that there are more and higher risks in project finance compared with corporate finance. Project finance is exposed to commercial risks as well as political risks. The main commercial risks are completion risks, environmental risks, operating risks, input supply risks, revenue risks, etc, and the main political risks are currency convertibility and transfer risks, expropriation risks, war and civil disturbance risks, risks of breach of government concession agreement, etc. Completion risks include permits risks, risks relating to the EPC Contractor, construction cost overrun, delay in completion, inadequate performance on completion, etc.

  • PDF

Exploring Escalation of Commitment Situation in the Internet C2C Auction

  • Park, Sang-Cheol;Kim, Jong-Uk;Jang, Si-Young;Lee, Won-Jun
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.126-131
    • /
    • 2007
  • Most Internet auction studies have focused on examining the determinants of auction success or closing price. However, there has been little previous research which investigates dark-side factors such as overbidding behavior in the Internet C2C transactions. For this reason, this study attempts to find situations with the escalation of commitment to bids using Internet auction systems and also examines whether the bidder's bidding is irrational. Therefore, this study applies escalation of commitment to explain the auction process such as the "going, going, gone period" with competition in Internet C2C auctions. In order to describe the auction process in terms of escalation of commitment, this study proposes psychological sunk costs, completion effect, and self-justification as the key factors of escalation of commitment and also willingness to continue bidding reflecting the decision maker's escalation behavior in terms of persistence perspective as final dependent variable. The results of PLS analysis indicate that a bidder's overbidding behavior is explained by the escalation of commitment.

  • PDF

GMP Calculation Process in CM at Risk for Public Construction Project (공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스)

  • Kim, Gun-Sung;Jin, Zheng-Xun;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

A Real-time Resource Allocation Algorithm for Minimizing the Completion Time of Workflow (워크플로우 완료시간 최소화를 위한 실시간 자원할당 알고리즘)

  • Yoon, Sang-Hum;Shin, Yong-Seung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.1
    • /
    • pp.1-8
    • /
    • 2006
  • This paper proposes a real-time resource allocation algorithm for minimizing the completion time of overall workflow process. The jobs in a workflow process are interrelated through the precedence graph including Sequence, AND, OR and Loop control structure. A resource should be allocated for the processing of each job, and the required processing time of the job can be varied by the resource allocation decision. Each resource has several inherent restrictions such as the functional, geographical, positional and other operational characteristics. The algorithm suggested in this paper selects an effective resource for each job by considering the precedence constraint and the resource characteristics such as processing time and the inherent restrictions. To investigate the performance of the proposed algorithm, several numerical tests are performed for four different workflow graphs including standard, parallel and two series-parallel structures. In the tests, the solutions by the proposed algorithm are compared with random and optimal solutions which are obtained by a random selection rule and a full enumeration method respectively.

The Survey of Time Management Status in the Domestic Construction Site (국내 건설현장의 공정관리 현황 실태 조사)

  • Yoon, Byung-Sik;Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.578-582
    • /
    • 2008
  • The domestic construction companies have implemented a various of management methodology and tools for time management. However, the work completion rate versus work plan have a big difference with the planned work completion rate previously despite of implementing the time management methodology and tools. The research searches the problems that the previous time management process and tools focusing on the management factors that can be controlled. Also, It suggest the improvement direction for these limits.

  • PDF

A Study on Enhancing Institutionalization on the Fire Analysis of the Warehouse at Icheon City (이천 냉동창고 화재분석을 통한 제도개선방안 연구)

  • Jung, Tae-Ho;Park, Sang-Hyun;Kim, Hee-Kyu
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.80-84
    • /
    • 2008
  • This research has been carried out in order to provide countermeasure plans, fire prevention, improving institutional plans through analyzing accidental causes and investigating the situation of damage from the fire incident of the cold storage at Icheon. By the analysis of the incident, which is organized the process; for incidence, firstly a field investigation, next the overview of related laws, finally the analysis of problems and deducting suggestions, it was possible to find out the causes of casualties. We also suggested improving plans through finding out several problems such as safety management system and safety regulations, the permit on the completion of the cold storage and the completion examination of fire facilities as institutional problems and fireproof construction and the selection of finishing materials.

  • PDF

No-Wait Lot-Streaming Flow Shop Scheduling (비정체 로트 - 스트리밍 흐름공정 일정계획)

  • Yoon, Suk-Hun
    • IE interfaces
    • /
    • v.17 no.2
    • /
    • pp.242-248
    • /
    • 2004
  • Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots to allow the overlapping of operations between successive machines in a multi-stage production system. A new genetic algorithm (NGA) is proposed for minimizing the mean weighted absolute deviation of job completion times from due dates when jobs are scheduled in a no-wait lot-streaming flow shop. In a no-wait flow shop, each sublot must be processed continuously from its start in the first machine to its completion in the last machine without any interruption on machines and without any waiting in between the machines. NGA replaces selection and mating operators of genetic algorithms (GAs), which often lead to premature convergence, by new operators (marriage and pregnancy operators) and adopts the idea of inter-chromosomal dominance. The performance of NGA is compared with that of GA and the results of computational experiments show that NGA works well for this type of problem.

Lot-Streaming Flow Shop Problem with Delivery Windows (딜리버리 윈도우 로트-스트리밍 흐름 공정 문제)

  • Yoon, Suk-Hun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.2
    • /
    • pp.159-164
    • /
    • 2004
  • Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots and then scheduling these sublots in order to accelerate the completion of jobs in a multi-stage production system. Anew genetic algorithm (NGA) is proposed for an-job, m-machine, equal-size sublot lot-streaming flow shop scheduling problem with delivery windows in which the objective is to minimize the mean weighted absolute deviation of job completion times from due dates. The performance of NGA is compared with that of an adjacent pairwise interchange (API) method and the results of computational experiments show that NGA works well for this type of problem.