• 제목/요약/키워드: proceeding bearing

검색결과 2,015건 처리시간 0.024초

조립토 다짐말뚝의 침하량 산정기법 (A Estimation Method of Settlement for Granular Compaction Pile)

  • 김홍택;황정순;박준용;윤창진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.286-293
    • /
    • 2005
  • In soft ground the settlement criterion usually governs. Therefore, it is very important not only reasonable assessment of the allowable bearing capacity of the soil but also reasonable assessment of settlement. In the previous studies by many other researchers, load concentration ratio and settlement reduction factor are usually proposed for estimating the settlement of granular compaction piles. In the previous studies, the reinforced ground with granular compaction piles is simplified as composite ground and the analysis is performed with in the basis of this assumption. However, the lateral deformation of granular compaction pile could not be considered and only the relative vertical strength between pile and soils could be considered in the analysis. In this study, a method adapting the Tresca failure criterion is proposed for calculating settlement of granular compaction pile. Proposed method can be considered the strength of pile material, pile diameter, installing distance of pile and the deformation behavior of vertical and horizontal directions of pile. In the presented study, large-scale field load test is performed and the results are described. Also, predictions of settlements from the proposed method are compared with the results of the load test. In addition, a series of parametric study is performed and the design parameters are analyzed.

  • PDF

LRFD 설계법에 의한 부마찰력이 작용하는 말뚝의 안정성 평가 (Stability Evaluation of Piles under Negative Skin Friction by the LRFD Approach)

  • 조천환;김웅규;이우철;강인철;김영식
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.17-24
    • /
    • 2005
  • Recently construction activities increase in reclaimed onshore areas. It is therefore considered an important factor for the design of pile foundation with problems in terms of settlements due to soft grounds. Nevertheless the design of piles for negative skin friction(or downdrag forces) is probably poorly understood by many engineers. It is mainly because the most of design specification give a way to design pile foundation in bearing capacity aspect although the negative skin friction is related to settlement(downdrag). Under LRFD(load resistance factor design) approach it is to separately consider ultimate limit state and serviceability limit state. This paper discusses LRFD approach to the design of piles for negative skin friction and compares this approach to traditional design approach. And also a case history is analyzed in that point of view.

  • PDF

동다짐 공법의 유효다짐깊이 결정에 영향을 주는 인자 분석 (Analysis of Influence Parameters to Evaluate the Effective Depth of Improvement of Dynamic Compaction Method)

  • 김홍택;이혁진;박인준
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.659-666
    • /
    • 2004
  • Dynamic compaction has evolved as an acceptable method of site improvement by treating poor soils in situ. The method is often an economical alternative for utilizing shallow foundations and preparing subgrades for construction when compared with conventional solutions. In general, the installation purpose of dynamic compaction are to increase bearing capacity and decrease differential settlement within a specified depth of improvement. This method involves the s systematically dropping large weights onto the ground surface to compact the underlying ground. The weights used on dynamic compaction projects have been typically constructed of steel plates, sand or concrete filled steel shells, and reinforced concrete. Typically, weights range from 5-20 ton and base configurations are, circular or octagonal. In this study, the effective depth of improvement is evaluated based on the numerical analysis code, the dynamic analysis of FLAC-3D program, in order to analyze the influence parameters ; ground conditions, maximum applied load and the area of compaction plate.

  • PDF

수중 대구경강관말뚝의 항타관입성 모니터링을 위한 PDA 적용 사례 (Drivability Monitoring of Large Diameter Underwater Steel Pipe Pile Using Pile Driving Analyzer.)

  • 김대학;박민철;강형선;이원제
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.11-19
    • /
    • 2004
  • When pile foundation constructed by driving method, it is desirable to perform monitoring and estimation of pile drivability and bearing capacity using some suitable tools. Dynamic Pile Monitoring yields information regarding the hammer, driving system, and pile and soil behaviour that can be used to confirm the assumptions of wave equation analysis. Dynamic Pile Monitoring is performed with the Pile Driving Analyser. The Pile Driving Analyser (PDA) uses wave propagation theory to compute numerous variables that fully describe the condition of the hammer-pile-soil system in real time, following each hammer impact. This approach allows immediate field verification of hammer performance, driving efficiency, and an estimate of pile capacity. The PDA has been used widely as a most effective control method of pile installations. A set of PDA test was performed at the site of Donghea-1 Gas Platform Jacket which is located east of Ulsan. The drilling core sediments of location of jacket subsoil are composed of mud and sand, silt. In this case study, the results of PDA test which was applied to measurement and estimation of large diameter open ended steel pipe pile driven by underwater hydraulic hammer, MHU-800S, at the marine sediments were summarized.

  • PDF

탑다운 기초 현장타설말뚝의 지지력 평가 (Bearing Capacity Evaluation of Drilled Shaft for Top & Down Method)

  • 조천환;김홍묵;김웅규;권세오;성병완
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.58-65
    • /
    • 2004
  • Recently, the top & down method with drilled shafts as a foundation of high rise building is often adopted for the purpose of construction period reduction and construction cost effectiveness. It is common to omit the loading test as a Quality assurance on account of the high capacity of drilled shafts for the top & down method. It seems that the capacity of drilled shaft in recent top & down method is beyond that of conventional loading test method.However, the quality assurance for the drilled shaft as foundation of high rise building becomes much more important since the drilled shaft should bear much higher working load. It may be a small scale test pile could be an alternative as a quality assurance for the drilled shaft with high capacities. Through a case study, this paper gives an idea for solving the limitation of the conventional loading test method for the quality assurance of drilled shaft with high capacities. In particular, this paper analyzed the scale effect for a small drilled shaft installed into bedrock, which could be used for an alternative.

  • PDF

천해저 지반조사를 위한 수면 탄성파 반사법 탐사자료의 분해능 향상 연구 (Study on the enhancement of data quality from shallow water seismic reflection survey)

  • 김중열;김유성
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.799-806
    • /
    • 2004
  • Recently, as the forerunner in establishing the Northeast Asia's logistics base, a lot of marine engineering works such as new ports and container terminals, extension of old ports, new bridges, land reclamation etc. have been progressed. Parallel to it, there is also an increasing demand for improving the safety of construction. In this situation, high resolution seismic reflection profiling can be well used, attempting to classify rocks and sediments under water, if possible, to delineate the distribution of grain sizes in sediments not only for calculating the cost of removing sediments from harbour's channels, but also for estimating the bearing capacities for bridge or port construction. However, the results from the corresponding reflection survey that has been in operation in our country can not be effectively used for engineering purposes mostly due to the insufficient resolution. Thus. in this paper, two innovative strategies are introduced to enhance resolution. The one deals with a newly designed exploration barge that will help reduce several kinds of noises encountered electrically or operationally. The other is associated with an establishment of optimum measuring system comprising e.g. a specially devised hydrophone with a combination of 7 piezoelectric elements. Field experiments performed at Busan harbour are illustrated. The quality of acquired data was thereby fundamentally improved in comparison with that obtained at the same time in a conventional way.

  • PDF

광역상수도용 펌프의 전양정 결정에 관한 연구 (A Study on the Total Head Decision of Pump for Regional Water Supply Facilities)

  • 김경엽;서상호;이정우;노형운;김상균
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2001년도 유체기계 연구개발 발표회 논문집
    • /
    • pp.165-170
    • /
    • 2001
  • An extensive range of pumping facilities are employed in the regional water supply system in metropolitan areas, and optimization and the systematic combination of the Pump facilities have direct bearing on the stability and economy of the water supply system concerned. These systems must be able to guarantee stability, efficiency and offer high reliability. Preparation of metropolitan area regional water supply system construction project must include a basic plan which takes into account the suitability of pumping facilities to be used, the environment in which facilities will be installed, man-power requirements and basic operational and management policies. This paper contains over-all analysis of the management of metropolitan area regional water supply systems as like Jayang, Paldang 1st pump station. In the study, it aims to prepare counterplan which will be operated and managed the pump upon the operational conditions and to suggest the proposal for water facilities codes to decides total head of pump in Korea.

  • PDF

하나로 2차 냉각펌프의 고진동 해소방안 (The Solution of High Vibration of the Secondary Cooling Pump in HANARO)

  • 박용철
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2001년도 유체기계 연구개발 발표회 논문집
    • /
    • pp.197-202
    • /
    • 2001
  • The heat produced by the fission in the fuel of HANARO, 30 MW of research reactor, was transferred from the primary cooling water to the secondary cooling water through heat exchangers. The secondary cooling water absorbed the heat was circulated by secondary cooling pumps and cooled through 33 MW of cooling tower. Each capacity of the three secondary cooling pumps was fifty percent ($50\%$) of full load. The two pumps were normally operated and the other pump was standby. One of the secondary cooling pumps has often get troubles by high vibration. To release these troubles the pump shaft has been re-aligned, the pump bearing has been replaced with new one, the shaft sleeve has been replaced with new one, the shaft and the impeller have been re-weight balanced representatively or the vibration of motor has been tested by disconnecting the shaft of pump. But the high vibration of pump cannot be cleared. We find out the weight balance trouble of the assembly that the impeller is installed in the shaft. After clearing the trouble, the high vibration is released and the pump is operated with smooth. In this paper the trouble solution of secondary cooling pump is described including the reason of high vibration.

  • PDF

공기 포일 베어링을 사용하는 300마력급 터보송풍기 개발 (Development of a 300 HP Class Turbo Blower with Air Foil Bearings)

  • 김경수;이기호;박기철;이시우;김승우
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2006년 제4회 한국유체공학학술대회 논문집
    • /
    • pp.331-334
    • /
    • 2006
  • Air foil bearings have been attempted for application to industrial turbo machines, since they have several advantages over oil bearings in terms of endurance, simplicity, environment-friendliness, efficiency, sound and vibration, and small turbo machines with air foil bearings are in the market as the result. Recently, researches on widening the application spectrum of air foil bearings are in progress worldwide. In this paper, a 300 HP class turbo blower using air foil bearings is introduced. The turbo blower has a high speed PMSM(Permanent Magnet Synchronous Motor) driving a compressor, and air flow rate is designed to be $180\;m^3/min$ at pressure ratio of 1.6. The maximum rotational speed is set to 17,000 RPM to maximize the total efficiency with the result that the weight of rotor assembly is 26kg, which is expected to be the largest turbo machine with air foil bearings ever developed in the world.

  • PDF

산업용 터보팬의 진동절연에 관한 연구 (The Study on Vibration Isolation of Industrial Turbo-fan)

  • 박익필;김동영;권용수;안찬우
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집A
    • /
    • pp.609-615
    • /
    • 2001
  • A turbo-fan is easily exposed to noise and vibration as against other industrial machines and the majority of them is subject to be damaged by vibration. The most usual problem of vibration in a turbo-fan is resonance so the case of being composed of iron sheet structure with low strength like a turbo-fan should be taken seriously. In this paper, FFT(Fast Fourier Transform) and Order tracking method were used to analyze factors of vibration in a turbo-fan and hereby with proper selection of vibration isolator, we wanted to reduce vibration of base. After Order tracking, we knew resonance occurred in rotational frequency 23 Hz(1400 rpm) at the casing and the bearing. After the test of base vibration using vibration isolators, the spring isolator was more effective than the robber isolator in the base vibration and the vibration isolating is more effective in the case that the isolating pad is adhered to the bottom of the isolating spring.

  • PDF