• Title/Summary/Keyword: private contract.

Search Result 189, Processing Time 0.02 seconds

A Study on development of general hospital security service (종합병원 경비업무의 발전방안에 관한 연구)

  • Ha, Jeong-Hun
    • Korean Security Journal
    • /
    • no.53
    • /
    • pp.187-208
    • /
    • 2017
  • The purpose of this study is to find the development of the general hospital security business plan based on the problem that guards are now aware of general hospital security service. To achieve the purpose of this study, the interview was conducted by interviewing interviews with nine field specialists who are currently engaged in the hospital for more than six years. The guard who perform general hospital security service proposed a development plan of general hospital security services as follows. First, the security guards at the General Hospital must complete a new education program suitable for the nature of the workplace. Second, the job training of the comprehensive hospital guard service is also needed to improve the quality of the program in accordance with the actual situation. Third, general hospital security guards should be provided with CS training, CPR and use of defibrillators, etc., and how to respond to infectious diseases. Fourth, there should be a detailed description of the extent to which aggregations and violent acts at the General Hospital should be addressed. Fifth, the Security Association needs to develop active programs for security guards and various efforts to improve the security of hospitals. Sixth, it is necessary to change the recognition of general hospital' security services, and the form of direct employment is required rather than the subcontract contract.

  • PDF

A Study on the Overcoming of the Legal Limits and the Status-Consolidating of the Online Services of the German Public Broadcasting System as the Third Media (독일 공영방송 온라인 서비스의 법적 한계 탈피와 제3의 미디어로서 위상 확립과정에 관한 연구)

  • Ko, Su-Cha
    • Korean journal of communication and information
    • /
    • v.47
    • /
    • pp.74-95
    • /
    • 2009
  • With the digital technical development, the German public broadcasting system has enlarged their online services with the rapid growth of internet population and digital channels. In the debate on online services of public broadcasting systems the major issue is that broadcasting fees finance their broadcast, though they are intended to support mass communication only. Therefore the German private broadcasting claimed to the European Union, that broadcasting fee of the German public had to be regarded as state aid concerning fair competition. Due to the autonomy of the German public broadcasting systems, guaranteed by the German Constitutional Law, a public value test was proposed to the EU and was accepted domestically. The cut in rise of broadcasting fees was stated unconstitutional by the German Constitional Court in 2007, when online services were consolidated as the third media amongst TV and radio with regard to basic provision. This with the public value tests of the public and the accept of the EU's Audio Visual Media Services Directive was constituted in the 12th amendment of the State Contract of Broadcasting. This three-dimensional legislative process could be instructive for the korean process, because Korea too is on the verge of constituting a regulatory system of convergence media.

  • PDF

Policy Study on Appropriateness of Safety Check Costs in Construction Projects - Focusing on Industrial Safety and Health Act - (건설공사 안전점검대가의 적정성에 대한 정책적 고찰 - 산업안전보건법을 중심으로 -)

  • Kim, Byeong-Cheol;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.4
    • /
    • pp.747-757
    • /
    • 2017
  • Of safety check regulation, 'Construction Technology Promotion Act' and 'Special Act on the Safety Control of Public Structures' contain provisions about the content of safety in construction works and the items of safety checks in the maintenance aspect and thus contribute to accident prevention in the construction industry. Of the regulations responsible for the practical safety of workers, the safety check regulation of Ministry of Employment and Labor demand for safety check from the start of construction based on an agreement with a concerned agency to the completion of construction solely based on 'Guidance Standards for the Specialized Disaster Prevention Instruction in Article 32 of Occupational Safety and Health Act' and 'Appropriation and Usage Standards of Safety and Health Management Costs in the Construction Industry'. There is, however, a huge gap, as well, in them according to client agencies. In small construction sites ordered by a private organization, checks are done formally with no detailed regulations. As a result, the costs of checks continue to drop with only the contract kept intact. This study examined the forms of safety checks practically done in the Jeju region, distinguished and compared them by the construction costs, calculated proper costs based on each construction act, and further proposed improvement measures for the detailed regulations.

Analysis of the Construction Process Managed by the U.S. Army Corps of Engineers Far East District Using IDEF0 (주한미군공사 수행을 위한 FED(Far East District) 프로세스 분석에 관한 연구)

  • Hwang, Jae-Hong;Ham, Nam-Hyuk;Kim, Je-Hyuck;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.163-173
    • /
    • 2010
  • A significant number of projects have been managed by US Army Corps of Engineers FED. Today, more information must be provided to the parties involved in the projects by phase than ever before. Specifically, USFK`s construction projects have been managed by FED(Far East District). Recently, however, large US private construction companies have been filling the role previously taken by FED. However, there is few construction managers to implement FED project in Korea. Accordingly, this study analyzes FED projects practices with focus on the construction management actors in order to suggest guideline. This study suggests a model FED construction process(Bid, Contract, Construction, As-Built Phase) by analyzing the existing FED project process using a IDEF0 methodology.

Comparative Study on the Technology Transfer from Government- funded Research Institutes to the Private Sector Focusing on Licensing Contract

  • Kim, Mi-Jung;Park, Jong-Bok;Lee, Jeong-Dong;Kim, Tai-Yoo
    • Proceedings of the Technology Innovation Conference
    • /
    • 2002.02a
    • /
    • pp.205-221
    • /
    • 2002
  • 본 연구의 목적은 정부출연연구소에서 연구개발된 기술이 민간부문에서 충분히 활용되지 못하고 있다는 문제의식으로부터 출발하여, 원천, 핵심기술의 확보가 국가경쟁력을 좌우하는 첨단기술경제시대에 막대한 국가자금으로 연구개발된 우수한 기술의 사장을 방지하고 궁극적으로 국가경제발전을 위한 전략적 기술이전 촉진 방안을 모색하는 것이다. 현재 국무총리산하 기초, 산업, 공공기술 연구회로 분류 조직되어 있는 3개 연구회 총 1개 정부출연연구소의 지난 10년간(1992-2001)의 연구예산규모, 보유특허수, 기술이전건수, 기술징수액, 기술실시계약서를 방문 조사하고 각 연구소의 기술이전전담조직의 실무자를 대상으로 설문 조사하여 설문 및 통계분석 결과를 토대로 기술이전관련 문제점 파악 및 기술이전 촉진을 위한 전략적 개선방안을 모색해 보았다. 먼저 기술이전 현황을 살펴보면 기술이전건수는 보유특허수의 3%미만, 기술료 징수액은 연구예산규모의 2%미만으로 기술이전 및 기술상업화율이 상당히 저조하다. 설문 및 통계분석 결과로부터 TLO 조직의 비효율적인 운영, 비전문성, 열악한 운영인력, 적극적인 기술이전을 위한 동기부족, 정부의 제도적인 지원부족, 기술실시계약서 조항들의 경직성 등을 기술이전 관련 문제점으로 도출해 낼 수 있었다. 이러한 문제점을 극복하고 기술이전 촉진을 위한 개선방안으로는 첫째, TLO 조직을 전략으로 개편해야 한다. 즉 기술이전 전담인력을 변리사, 전문 협상가, 연구원 둥 전문가들로 구성하여 지적재산권 관리, 기술평가, 시장조사, 기술마케팅, 사후관리 등을 효율적으로 수행해야 한다. 둘째, 정부의 정책적인 지원이 필요하다. 기술이전 전담조직에 대한 인센티브 시스템 기술이전을 위한 특별예산 편성 등을 정책적, 제도적으로 도입하는 등의 적극적인 지원이 요구된다. 셋째, 기술실시계약서 조항들을 기술실시자의 실질적인 기술 상업화에 도움이 되고 기술 유출 및 기술사장화를 방지하는 방향으로 개선하여야 한다. 특히, 전용실시권과 실시대가, 기술실시 및 지적재산권 관리와 관련된 제반 비용의 부담비율 등을 보다 유연하게 개선하여야 한다. 본 연구는 정부출연연구소에서 민간부문으로의 기술이전만을 고려하여 기술이전의 중요한 요소인 민간부문에 대한 고려가 전혀 없다. 따라서 보다 실질적이고 체계적인 결과를 도출하기 위해 민간부문을 고려한 연구가 진행되어야 한다고 생각한다.

  • PDF

Effective Handling of Construction Disputes for Strengthening the International Competitiveness of the Construction Industry (건설산업 국제경쟁력강화를 위한 건설분쟁처리절차 개선방안)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.3-11
    • /
    • 2020
  • Problems related to construction contracts arise if they are not reflected in the design phase from the planning phase of the construction project, or if they are not properly dealt with despite various changes in the construction phase. So far, there have been a number of discussions in Korea regarding the improvement of the procedures for resolving construction disputes, and the problems related to the procedures for solving construction disputes have been raised steadily, but the problems related to the procedures for solving construction disputes are still unresolved. Therefore, in this study, the followings were proposed to strengthen the international competitiveness of the construction industry. First, the so-called Construction Dispute Mediation Act should be enacted to prepare the basis for the establishment of a tentatively named Construction Dispute Mediation and Arbitration Agency(CDMA). Second, the work of the CDMA should be limited to the work of supporting the DRB, mediation and Arbitration the private and public sectors. Third, it is required to choose between adjustment and arbitration when obtaining a contract and to operate the DRB during construction phase. Fourth, CDMA should be established as standing bodies, and branches should be operated in various parts of the country. Fifth, construction experts from various areas should be included as members so that disputes over construction contracts can be dealt with quickly. And finally, relevant laws that specify the procedures for dealing with construction disputes should be amended together.

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

Preliminary Analysis of the Bid Success Ratio according to the Characteristics of Overseas Construction Projects (해외건설 프로젝트 특성에 따른 입찰 성공률 분석에 관한 기초연구)

  • Kim, Seung-Won;Lee, Kang-Wook;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.122-133
    • /
    • 2019
  • In the construction industry, bidding competitiveness is the most basic and important competence of the company. Bidding competitiveness comes from competitive advantage, but the strategy of the company to capture bidding competitiveness varies with the characteristics of the project. In particular, overseas construction is where uniqueness of the construction industry and the specificity of international business coexist. This study analyzes the bidding success ratio and the level of bidding difficulty by project characteristics with 12,952 overseas construction bidding cases. Consequently, it was found that the bidding success ratio of Middle East and North Africa (MENA) and civil engineering was the lowest in each group of project characteristics, and therefore the level of bidding difficulty is high, respectively. In addition, it was confirmed that the bidding success ratio of small size or short duration project was relatively high, and the bidding success ratio of both the negotiated bidding in the bidding method group and the private sector in the client type group was respectively high. However, Kruskal-Wallis test in contract type and period shows that there is no statistically significant difference in the bidding success ratio by group.

A Study on the Designated Manager System of Public Libraries in Japan (일본 공립도서관 지정관리자제도 연구)

  • Yoon, Hee-Yoon
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.55 no.3
    • /
    • pp.57-77
    • /
    • 2021
  • The identity of public libraries in Japan is a social education institution under the 「Social Education Act」 and the 「Library Act」. For these identities, the local government's board of education has operated and managed public libraries, and some have managed by the Management Outsourcing System to public organizations. Then, in 2003, the 「Local Autonomy Act」 was revised to introduce the Designated Manager System in form of administrative disposition, and expanded the scope of application to private institutions and organizations. As of the end of 2018, 18.0% of public libraries introduced the DMS, but the pros and cons surrounding it are sharply opposed. This study outlined the overall status of the DMS and the introduction of public libraries, and critically reviewed major issues. As a result, As a result, there was much controversy over the expected cost reduction, service improvement, employee professionalism, business continuity, and cooperation network establishment when DMS was introduced. The reasons were due to downsizing-based personnel management, contract-oriented employment, short periods of designation, lack of multiple competitive markets, and declining service capabilities of irregular workers. The public library is a knowledge and cultural infrastructure that enhances human values and social dignity based on faithful collection and active service, and is a local public goods that emphasizes non-exclusion and non-competitiveness. Given the increasing number of cases in which public libraries are recently contracting out to cultural foundations in Korea, DMS is not a fire across the river. We need to be wary of the possibility that Japan's unbearable institutional lightness will be applied to public libraries in Korea.

A Study on the Application of Design Process in the Architectural Design Practice (건축설계 실무과정에서 디자인 프로세스의 적용에 관한 연구)

  • Kang, Mi-hyun;Kim, So-ra;Shin, Byeong-uk
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.3
    • /
    • pp.59-66
    • /
    • 2022
  • This study aims to find out how architectural designers applied the design process and what content is applied in the practical process of architectural design in Korea, and to improve it if there is a problem. So the study is carried out by investigating 13 architects(Including one person who wants to keep his work private) with extensive experience in architectural design. The architects were questioned on how and what content the design process was used for their representative works that had been designed. And interviews and field surveys were conducted on other matters to be improved. The survey was conducted from November 2021 to July 2022. According to the conclusion of this study, First, Most architects were applying the design process in the architectural design practice. These are caused by an impact on education, but there was also an aspect of preparation in terms of guidelines such as the Architects Association and storage rights. Second, Although the design process differed in each name and phase, it was generally carried out in the order of the start phase, the planning work phase, the basic design phase, the intermediate design phase, the implementation quarterly, and construction. Third, The step-by-step work of the design process differed slightly depending on the architect, but counseling and contract work were mainly performed at the start-up phase, and field surveys, legal investigations, and case studys were conducted at the planning phase. In the basic design phase, some contents related to architectural programming, basic drawings, images, and models were used as main work contents. In the intermediate design phase, secondary contents such as licensed books and facility facilities were the main tasks. In the implementation design phase, detailed maps and various frost facilities were finally inspected. Since then, construction and supervision have been carried out in the order of progress. Forth, As for the contents to be improved in the future, the architect's ability, the designer's knowledge of the overall architecture, the design supervision system, and the expansion of time for the initial design process were answered.