• Title/Summary/Keyword: priority-setting

Search Result 253, Processing Time 0.029 seconds

Application of Analytic Hierarchy Process for Relative Importance Determination of Internet of Things Standardization (사물인터넷 표준화의 상대적 중요도 결정을 위한 계층분석방법 응용)

  • Woo, Hoon-Shik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.47-55
    • /
    • 2016
  • As one of recent issues in the information and communication industry, internet of things has attracted attention to provide intelligent infrastructure services which connect and share data and information between real and virtual world. According to the development of these internet of things technologies, types of machines, telecommunication devices, and terminals are increasing tremendously. In this situation, connectivity and interoperability between internet of things components are important issues to build a hyper connected society. To visualize this society, it is important to set up and develop information and communication technology (ICT) standards among stakeholders. However, under limited budget and human resources, it is essential to rank standardization work items for setting standards with respect to efficiency. The purpose of this study is to provide a method for setting standardization strategies within group decision making. As a multi-criteria group decision making tool, analytic hierarchy process (AHP) is adopted and applied to determine the priorities of setting work items. The proposed method first defines decision making problem with objective, criteria, and alternatives which produces a hierarchy consisting of upper and lower criteria. Then, pairwise comparisons of academy and public sector experts are performed with respect to their relative meaning and importance. Individual surveys of expert groups are collected and summarized to determine relative criteria importance measures. Furthermore, to deliver reliable importance criteria measures, differences between academy and public sector expert groups are compared and tested using Mann-Whitney non-parametric test. The results are illustrated for useful guidelines to practical group decision making in standardization strategy establishments.

Assessment factors for the Selection of Priority Soil Contaminants based on the Comparative Analysis of Chemical Ranking and Scoring Systems (국내.외 Chemical Ranking and Scoring 체계 비교분석을 통한 우선순위 토양오염물질 선정을 위한 평가인자 도출)

  • An, Youn-Joo;Jeong, Seung-Woo;Kim, Tae-Seung;Lee, Woo-Mi;Nam, Sun-Hwa;Baek, Yong-Wook
    • Journal of Soil and Groundwater Environment
    • /
    • v.13 no.6
    • /
    • pp.62-71
    • /
    • 2008
  • Soil quality standards (SQS) are necessary to protect the human health and soil biota from the exposure to soil pollutants. The current SQS in Korea contain only sixteen substances, and it is scheduled to expand the number of substances. Chemical ranking and scoring (CRS) system is very effective to screen the priority chemicals for the future SQS in terms of their toxicity and exposure potential. In this study, several CRS systems were extensively compared to propose the assessment factors that required for the screening of soil pollutants The CRS systems considered in this study include the CHEMS-1 (Chemical Hazard Evaluation for Management Strategies), SCRAM (Scoring and Ranking Assessment Model), EURAM (European Union Risk Ranking Method), ARET (Accelerated Reduction/Elimination of Toxics), CRSKorea, and other systems. The additional assessment factors of CRS suitable for soil pollutants were suggested. We suggest soil adsorption factor as an appropriate factor of CRS system to consider chemical transport from soil to groundwater. Other factors such as soil emission rate and cases of accident of soil pollutants were included. These results were reflected to screen the priority chemicals in Korea, as a part of the project entitled ‘Setting the Priority of Soil Contaminants'.

Prioritization of Intermodal Transportation Facilities with Considering the Budget Rate Constraints of Focal Terminal Types (교통물류거점유형별 예산비율을 고려한 연계교통시설 투자우선순위 분석)

  • Oh, Seichang;Lee, Jungwoo;Lee, Kyujin;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.361-368
    • /
    • 2010
  • It is general that mostly congested sections of national backbone networks have been improved based on the national network expansion plan. However, in case of intermodal terminals which are origins of logistics, it is still so congested that travel time between origin and destination is long. Therefore, intermodal transportation systems plan of major intermodal terminals for the intermodal connector networks between intermodal terminal and national backbone network or intermodal terminal was established. With the limitation of priority methodology applying to intermodal connector facility under existing methodology, this study suggests an improved priority methodology. This study includes characteristics of terminal on the hierarchical structure and assessment list, but it does not concentrate on the specific terminal type through survey. To avoid a certain concentration, budget constraint for each terminal type was considered ahead of priority. Finally priority methodology was developed with two-step assessment under consideration that specific terminal is not involved in intermodal connector facility project. As a result of calculating weights by survey, effects such as d/c and accessibility fluctuations index through project implementation gain high weight, and degree of region underdevelopment gets next. Although the methodology in this study could not yields the priority by assessment list, it will be useful for setting the direction on policy related to intermodal connector facility projects.

Analysis of the Priority Decision for Establishment Criteria of Environmental Sculptures in Urban Areas (대도시 옥의 환경조형물의 설치기준에 대한 우선순위 분석)

  • Lee, Sang-Seol;lee, Jeong
    • Journal of Environmental Science International
    • /
    • v.9 no.6
    • /
    • pp.489-494
    • /
    • 2000
  • This research focused on the priotity decision for establishment sriteria on the effects which environmental sculptures in urban area. The analysis performed in this study used the AHP(Analytic Hierarchy Process) that is recognized as a useful decision-making tool to select and evaluate alternatives through pairwise comparison in the context of hierarchical decision structure. The results obtained from the analysis drawn by collecting the professional opinions of 5 experts for environmental sculptures are as follows: 1. The orders of establish criteria priorities on environmental sculptures were harmony of environment> symbol> public> function. The harmony of environment was the most important priority because it showed the highest weight of criteria. 2. The alternative priorities of environmental sculptures were the meaning of work>setting place> social contribution> physical quality .The meaning of work showed the highest change in the weight of alternative. 3.The sensitivity analysis of environmental sculptures demonstrated that the rate of change in the alternative priorities of the public was stabilized although the criteria importance varied, while the harmony of environment, the symbol intimated and function of priorities has their rates of weight changed if the criteria priorities were high.

  • PDF

Priority Therapeutic Groups to Expand Development of Prescribing Indicators using a Consensus Group of Health Care Professionals (전문가 조사를 활용한 약제급여 적정성 평가 항목 및 지표 확대방안 도출)

  • Jeon, Ha-Lim;Kim, Dong-Sook;Kim, Bo-Yun
    • YAKHAK HOEJI
    • /
    • v.59 no.4
    • /
    • pp.190-200
    • /
    • 2015
  • Evaluation Project on Appropriate Prescribing (EPAP) which is analysing prescribing pattern and providing physicians feedback has begun in 2001. EPAP indicators are related to antibiotics for acute respiratory tract infections, overuse of injection, polypharmacy (no. of drugs prescribed together, no. of prescriptions with 6 or more drugs), prescribing of specific medication group (drugs for acid related disorders, NSAIDs, corticosteroids) and medication expenditure per prescription day. The aim of this study was to suggest a development plan for EPAP indicators suitable for domestic situation. A consensus group consisting of seventeen health care professionals evaluated significance of each therapeutic class for EPAP indicators expansion considering information such as magnitude of issue, prescribing indicators of foreign countries, reimbursement criteria by each therapeutic class. Based on the data and group survey, 5 classes were selected as candidates for prescribing indicators and we presented 24 indicators regarding 5 classes. The results suggested that we need to augment evaluation indicators of additional area.

Greedy Merging Method Based on Weighted Geometric Properties for User-Steered Mesh Segmentation (사용자 의도의 메쉬분할을 위한 기하적 속성 가중치 기반의 그리디 병합 방법)

  • Ha, Jong-Sung;Yoo, Kwan-Hee
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.6
    • /
    • pp.52-59
    • /
    • 2007
  • This paper presents a greedy method for user-steered mesh segmentation, which is based on the merging priority metric defined for representing the geometric properties of meaningful parts. The priority metric is a weighted function composed of five geometric parameters: distribution of Gaussian map, boundary path concavity, boundary path length, cardinality, and segmentation resolution. This scheme can be extended without any modification only by defining more geometric parameters and adding them. Our experimental results show that the shapes of segmented parts can be controlled by setting up the weight values of geometric parameters.

A Framework for Deriving Investment Priority in National Defense R&D - Using DEA based on TRA - (국방연구개발 투자우선순위 도출 프레임워크 - TRA 방법론에 기반한 DEA 중심으로 -)

  • Yu, Donghyun;Lim, Dongil;Seol, Hyeonju
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.2
    • /
    • pp.217-224
    • /
    • 2018
  • The purpose of this study is to evaluate the future potential value of CTE(Critical Technology Element)s that are evaluated to be low in TRA(Technology Readiness Assesment) and to present investment prioritization technologies in defense R&D(Research and Development) based on them. To do this, we used the DEA(Data Envelopment Analysis) method, which is useful in evaluating the efficiency of the organization. Specifically, we suggest a systematic framework to evaluate the future value of CTEs by setting the CTEs derived from the TRA process to DMU(Decision Making Unit)s, the cost and time required to develop each CTE as the input factor of the DEA and the effects of the development of each CTE as the output factor of the DEA respectively. We also conducted an illustrative case study on radar technologies to demonstrate the usefulness of the proposed approach.

Roles of Park and Green Space Planning for Establishing Livable Communities in the Environmental Age through Encouraging Linkage of Academic and Practical Approaches

  • Yoritaka Tashiro
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.74-80
    • /
    • 2004
  • The significance and means of parks and green space planning have been changed dramatically in this century in Japan. The first priority must be given to define the means and purposes of planning., especially the role of ecological, social and economical management with the increasing trend of environmental concern, and the method to estimate values of park and green space from the point of view of regenerative society development. The role of planning parks and green space is reviewed in the following three aspects; as tools for land use control (master plan), as tools for finding appropriate lands for purchasing land (development plan) and tools for application of individual development technique of green space and landscapes(site plan and design). It is a serious issue that the existence of parks in urban setting which used to be considered as a top priority, is now being challenged in terms of economical, social and environmental benefits. In such processes, the most important issue is to define what makes parks and green spaces attractive and ecological to obtain social support to be developed.

  • PDF

A study on the construction of the planning process Green Stormwater Infrastructure (GSI) in the public building in Gyeongsangnam-do (경상남도 공공청사형 그린빗물인프라(GSI) 조성 체계 구축)

  • Lee, Hyojung;Shin, Hyunsuk
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.4
    • /
    • pp.301-310
    • /
    • 2023
  • Since 2013, the Ministry of Environment has been promoting the 'Green Stormwater Infrastructure (GSI) application project', a small-scale distributed stormwater management method, and supporting installation costs. So, the number of local governments that want to apply for 'GSI applied projects' is increasing every year. However, with the exception of Seoul, which introduced the 「Low Impact Development Prior Consultation System」, each local government has difficulties because there is no guideline or implement systems. Therefore, in this study, the application scope and priority setting of public buildings in Gyeongsangnam-do, the review of the GSI application effect in the pilot study area, and the establishment of an integrated implement system will be proposed as a result of the study.

Analysis of Assessment Indicator on Priorities for Budget Allocation of the National R&D Program (국가연구개발사업 예산배분을 위한 우선순위 판단지표 분석)

  • Ahn, Seung-Ku;Kim, Eun-Sil;Cho, Hyun-Jeong
    • Journal of Korea Technology Innovation Society
    • /
    • v.14 no.4
    • /
    • pp.889-914
    • /
    • 2011
  • This paper is to review assessment indicator on priorities for budget allocation of the national R&D program. In priority setting of programs for the budget allocation process of the national R&D program using the Analytical Hierarchy Process (AHP), the survey result on the major influencing factors is as follows: the significance of components of evaluation for the priority of the national R&D programs in budget allocation was as following order: "accomplishment and ripple effect of the project," "basis and driving force for the promotion of project," "feasibility of project goals," and the "possibility of overlapping and linkage among projects". The importance of the final evaluation indicator was as following order: "clarity and possibility for accomplishment of business objectives," "ripple effects in terms of science and technology", "ripple effects in terms of the economy and overall society" and "appropriate correspondence with mid- to long-term plans" (the importance for these four indicators was over 10%) while the importance of "overlapping" and "appropriateness of budget size" indicators which fell below 5% were considered to be relatively less important. there is a need for a clear criteria and conceptions of evaluation indicators for budget allocation of national R&D programs.

  • PDF