• 제목/요약/키워드: priority management

검색결과 1,911건 처리시간 0.032초

영산강수계 비점오염원 중점관리지역 선정에 관한 연구 (A Study on the Selection of Non-point Pollution Management Regions with High Priority Order in the Yeongsan River Basin)

  • 이재춘;박혜린;임병진;이창희;이수웅;이용운
    • 생태와환경
    • /
    • 제45권4호
    • /
    • pp.347-355
    • /
    • 2012
  • In this study, non-point pollution sources in the Yeongsan river basin are analyzed; then, the priority regions (areas divided on a small scale) of management are selected for efficient water management of the Seungcheon and Jooksan reservoirs, which were constructed as one of the 4 major rivers restoration projects. The priority regions are decided by using the criteria of the excessive rate of target water quality, non-point pollution load per unit area, total TP load and down flow distance. The results of this study are as follows. The upper 10% of the priority regions for non-point pollution management includes YB15, YB05, YB10, YB24, YB14 and YB11 for the Seungcheon reservoir watershed, and YC24, YC25, YC30, YC34, YC22 and YC17 for the Jooksan reservoir watershed. However, a few regions in each of the Seungcheon and Jooksan reservoirs need to be selected in higher order, and the non-point pollution removal facilities in the regions need to be installed with respect to budget, urgent matter, and so on.

암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석 (A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects)

  • 이치주;이강;심재광
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.55-64
    • /
    • 2013
  • 의료시설은 일반건축물 보다 공사의 복잡성이 높고, 정부규제가 엄격하여 공사 단계에서의 설계변경과 하자보수들이 많이 발생한다. 본 연구에서는 의료시설의 중점 관리공사와 요인들을 도출하고 분석하여, 설계단계와 공사단계에서 관리가 잘 되지 않는 공사들을 분석하였다. 그리고 2013년 현재 진행되고 있는 의료시설 공사 관리자들의 인식을 조사하여, 개선 가능성이 큰 공사를 도출하였다. 먼저, 중점 관리요인들을 건축과 설비, 그리고 전기의 세 분야로 분류하여 도출하였다. 다음으로, 1) 공사 진행단계에서 설계변경이 많이 발생하고, 2) 하자보수들이 많이 발생하고 소요비용이 큰 중점 관리공사와 요인들을 분석하였다. 마지막으로, 진행 중인 의료시설 공사 관리자들이 중요하게 생각하지 않는 공사를 조사하였다. 설계변경과 하자보수가 많지만, 중요하게 생각하고 있지 않다면 개선 가능성이 클 것이기 때문이다. 설계단계에서는 마감공사, 벽체공사, 창호공사, 사무 자동화 및 통신기능 공사, 조명공사, 그리고 공사 관리단계에서는 폐기물 공사, 사무자동화 통신기능, 창호공사, 오염관리, 배관공사로 분석되었다. 본 연구의 결과인 설계변경과 하자보수가 많은 공사, 그리고 개선 가능성이 큰 공사의 관리를 실시 설계단계와 공사 관리단계에서부터 집중 관리하여야 할 것이다.

국내에서 농약의 위해성 관리를 위한 우선 순위 선정에 관한 연구 (Priority Ranking for Pesticide Risk Management in Korea)

  • 김예신;박화성;이동수;신동천
    • 한국환경독성학회:학술대회논문집
    • /
    • 한국환경독성학회 2003년도 추계국제학술대회
    • /
    • pp.97-117
    • /
    • 2003
  • 통합 순위 목록과 여러 가지 지표에 의거한 개별순위 목록을 비교한 결과, 전반적으로 통합 순위 목록과 잘 일치하고 있었다. 또한 각각의 개별 순위 목록은 세부적인 목적에 따라, 충분히 활용될 수 있다. 이 연구에서는 EDCs에 포함되는 농약에 대해서는 우선 순위 목록(Priority List 2)을 분리하여 제시하였다. 이미 이들 물질은 국책 사업으로 충분한 관심을 가지고 연구가 진행되고 있기 때문에 현재 사용중인 농약을 중심으로 우선 순위 목록(Priority List 1)을 작성하고 분석하였다. 자료의 결손이 크면 클 수록, 우선 순위 결과에 대한 불확실성도 커진다. 따라서 이들 자료의 결손을 합리적인 방법으로 채워나가는 것이 매우 시급한 과제이다 그러나 이들 자료의 결손이 채워지면 일부 농약의 경우는 순위가 변할 수 도 있지만, 크게 일정한 범위 밖으로는 이탈하지 않은 것으로 생각된다. 따라서 통합 우선 순위중 1∼20순위를 우선적으로 관심을 가지고 관리해야 할 물질(high priority)로 구분하고, 그 다음으로는 21∼40순위를 그 다음으로 관심을 가지고 관리해야할 물질(Medium priority)로서, 나머지 물질을 Low priority물질(41∼52순위)로 분류할 수 있다(Figure 2 참조). 여기서 Low는 이들 물질에 대한 위험성이 낮다는 것을 의미하는 것이 아니고 상대적으로 High 보다 낮다는 의미이다.

  • PDF

엄격한 T-축출 우선순위 대기행렬을 이용한 기회 주파수 접근 방식의 성능 분석 (The Analysis of an Opportunistic Spectrum Access with a Strict T-preemptive Priority Discipline)

  • 김길환
    • 산업경영시스템학회지
    • /
    • 제35권4호
    • /
    • pp.162-170
    • /
    • 2012
  • We propose a new priority discipline called the strict T-preemptive priority discipline, and derive the waiting time distributions of each class in the strict T-preemptive priority M/G/1 queue. Using this queueing analysis, we evaluate the performance of an opportunistic spectrum access in cognitive radio networks, where a communication channel is divided into time slots, a licensed primary user is assigned to one channel, and multiple unlicensed secondary users may opportunistically exploit time slots unused by the primary user. We also present a numerical example of the analysis of the opportunistic spectrum access where the arrival rates and service times distributions of each users are identical.

데이타 우선순의에 기초한 트랜잭션 스체줄링 알고리즘의 제안 및 실시간 DBMS에서의 성능 비교연구 (A Proposal on Data Priority Based Transaction Scheduling Algorithm and the Comparative Performance Evaluation in Real Time Database Management System)

  • 윤석환;이재영;박치항
    • 한국정보처리학회논문지
    • /
    • 제3권4호
    • /
    • pp.803-816
    • /
    • 1996
  • 본 논문에서는 기존의 알고리즘들이 트랜잭션에 부여하였던 우선순의를 특정 데이 타 항목에 부여하여 접근하는 트랜잭션중 가장 높은 우선순의 트랜잭션을 먼저 수행토 록 함으로써 교착상태(deadlock)를 쉽게 예방할 수 있는 점에 착안하여 데이타 항목에 우선순위를 부여하는 데이타 우선순위에 기초한 잠금 프로토콜 (DPLP:Data-Priority Based Locking Protocol)을 제안하고, 이 알고리즘의 성능을 실시간 데이타베이스 시스템에서 기존 잠금 프로토콜의 성능과 비교분석하였다. 비교 기준으로는 트랜잭션 도착 시간차(IAT:inter arrival time) 에 따른 트랜잭션의 성공 비율(success ratio), 평균 지연(average-lateness),충돌 비율(conflict-ratio), 재시작 비율(restart-ratio) 을 채택하였다. 성능 비교의 결과는 본 논문에서 제안하는 데이타 우선순위에 기초한 잠금 프로토콜이 기존의 잠금 프로토콜들보다 우수한 성능을 보임을 확인하였다.

  • PDF

(N, n)-선점 재샘플링-반복 우선순위 대기행렬 ((N, n)-Preemptive Repeat-Different Priority Queues)

  • 김길환
    • 산업경영시스템학회지
    • /
    • 제40권3호
    • /
    • pp.66-75
    • /
    • 2017
  • Priority disciplines are an important scheme for service systems to differentiate their services for different classes of customers. (N, n)-preemptive priority disciplines enable system engineers to fine-tune the performances of different classes of customers arriving to the system. Due to this virtue of controllability, (N, n)-preemptive priority queueing models can be applied to various types of systems in which the service performances of different classes of customers need to be adjusted for a complex objective. In this paper, we extend the existing (N, n)-preemptive resume and (N, n)-preemptive repeat-identical priority queueing models to the (N, n)-preemptive repeat-different priority queueing model. We derive the queue-length distributions in the M/G/1 queueing model with two classes of customers, under the (N, n)-preemptive repeat-different priority discipline. In order to derive the queue-length distributions, we employ an analysis of the effective service time of a low-priority customer, a delay cycle analysis, and a joint transformation method. We then derive the first and second moments of the queue lengths of high- and low-priority customers. We also present a numerical example for the first and second moments of the queue length of high- and low-priority customers. Through doing this, we show that, under the (N, n)-preemptive repeat-different priority discipline, the first and second moments of customers with high priority are bounded by some upper bounds, regardless of the service characteristics of customers with low priority. This property may help system engineers design such service systems that guarantee the mean and variance of delay for primary users under a certain bounds, when preempted services have to be restarted with another service time resampled from the same service time distribution.

AHP기법을 활용한 제조물책임 대응시스템 구축요인의 전략적 우선순위 도출에 관한 연구 (Extracting Priorities of Strategic Components of Product Liability Response System using AHP)

  • 서준혁;고복수;배성민
    • 품질경영학회지
    • /
    • 제42권2호
    • /
    • pp.235-251
    • /
    • 2014
  • Purpose: To develop efficient PL response system, SMEs should decide which component of PL response system is important and implemented with priority under limited resources. To accomplish this goal, we propose strategic priority components of PL response system for SME manufacturer. Methods: We categorize the components of PL response system based on prior research results - System, Organization, Training, Technology, Cost, and Awareness. AHP (Analytic Hierarchy Process) is applied to extract important components of PL response system, which is used in assigning the priority of component. To analyze effects of each components, performance sensitivity analysis is applied. Results: The survey analysis results show Technology is the most important components. Organization and Cost component are follows. As the importance of Technology is changed, we can find Organization, Cost is second and third important components. Conclusion: Our research shows Technology which is related to make a safe product with systematic process, is a basic enabler of PL response system. Also, building a PL team and securing a budget for PL activity should be carry out with limited resources.

서비스 실패 관리를 위한 FMEA 이용 방안 (FMEA Measures for Service Failure Management)

  • 김현정;안진예;김수욱
    • 품질경영학회지
    • /
    • 제42권1호
    • /
    • pp.43-61
    • /
    • 2014
  • Purpose: This study identifies preventive measures for VOC management by analyzing the causes and effects of factors that contribute to high risk service failure using FMEA on KORAIL VOC data. Methods: Two research methods were used. First, a Risk Priority Number (RPN) was assigned to each KORAIL VOC based on Failure Mode and Effect Analysis (FMEA). Second, multiple regression analysis was run with RPN factors that include severity, occurrence, and detection as the independent variables and customer dissatisfaction as the dependent variable. Results: Multiple regression analysis showed that RPN factors including severity, occurrence, and detection had significantly positive relationship with customer dissatisfaction. Based on these results, an FMEA was performed on VOC categories with high RPN for railroad stations including platform, ticketing, ticket verification, parking, and escalator, and VOC categories with high RPN for trains including entrance doors, cafes, air quality, announcement, and ticket verification. Conclusion: This study has practical implications to service failure management. A priority order using FMEA was established for the list of customer dissatisfactions that should be addressed to actively manage service failure, and strategies for tackling this priority list are offered.

강원도 중소기업 품질경영 운영 방안 사례 (A study on Quality Management in Small and Medium Enterprises)

  • 박노국
    • 대한안전경영과학회지
    • /
    • 제8권1호
    • /
    • pp.131-144
    • /
    • 2006
  • Quality system management adapted by small and medium enterprises in Kangwon province to enhance the competitiveness was studied. Variance analysis on several questionnaire answers was performed. Motives for acquiring the accreditation, such as product export, adjustment to international trend, enhancement of brand/product recognition, CEO's mind change, and management innovation, have been changed significantly among business types. Mind changes after the accreditations were setting company's first priority on quality, enhanced recognition on compliance of in-house standards and regulations, employee's performance with the recognition of quality. Amongst service problems to maintain the ace reditations were difficulties in maintaining the recognition of the company's finality management, labor increase to maintain the ISO 9000 enforcement team, and financial burden to keep the accreditation. Quality recognition after the accreditations was significantly improved in setting company's first priority on quality, enhanced recognition on compliance of in-house standards and regulations, employee's performance with the recognition of quality.

재난안전사고 피해특징을 고려한 재난안전사업 투자방향 제시 (Investment Direction of Disaster Safety Projects Considering Characteristics of Disaster Safety)

  • 허보영;조성은
    • 대한안전경영과학회지
    • /
    • 제19권2호
    • /
    • pp.41-50
    • /
    • 2017
  • Disaster and safety budget can be characterized as a large-scale public asset on which the government has a significant role. It is of a crucial importance to properly allocate the limited national budget to various areas as necessary. Higher investment efficiency of the budget related to disaster and safety management requires distribution criteria based on relevance and efficiency. Currently, the budget related to disaster and safety management is orchestrated through the prior consultation system. However, there is still no clear framework for reviewing the investment direction and setting the priority investment areas by prior consultation. This study analyzes the status and characteristics of disaster and safety management projects by damage type and proposes a structured system for prioritization. This framework can be useful in selecting the areas that need priority investments by damage type of disaster and safety management projects, thereby contributing to improving investment efficiency.