• Title/Summary/Keyword: price transmission

Search Result 172, Processing Time 0.026 seconds

A Study on The Application and The Location of FACTS for Congestion Prob (혼잡해결을 위한 FACTS 기기의 적용과 위치선정)

  • Moon, Jun-Mo;Jung, Yun-Ho;Lee, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.22-24
    • /
    • 2000
  • As a competition is introduced in the electricity supply industry, a congestion problem arises in the transmission network. The congestion causes the transmission cost to increase. One way to decrease the congestion cost is to control the transmission flow through the installation of FACTS(Flexible AC Transmission system). This paper deals with the optimal site of the FACTS for reducing the congestion cost using a shadow price which is one of the economic signals for the systems. Test results show that the site of the FACTS(UPFC) is optimal to minimize the congestion cost by the proposed algorithm.

  • PDF

A New Method to Handle Transmission Losses using LDFs in Electricity Market Operation

  • Ro Kyoung-Soo;Han Se-Young
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.2
    • /
    • pp.193-198
    • /
    • 2005
  • This paper proposes a new method to handle transmission line losses using loss distribution factors (LDF) rather than marginal loss factors (MLF) in electricity market operation. Under a competitive electricity market, the bidding data are adjusted to reflect transmission line losses. To date the most proposed approach is using MLFs. The MLFs are reflected to bidding prices and market clearing price during the trading and settlement of the electricity market. In the proposed algorithm, the LDFs are reflected to bidding quantities and actual generations/ loads. Computer simulations on a 9-bus sample system will verify the effectiveness of the algorithm proposed. Moreover, the proposed approach using LDFs does not make any payments residual while the approach using MLFs induces payments residual.

A Nash Bargaining Solution of Electric Power Transactions Reflecting Transmission Pricing in the Competitive Electricity Market (송전선이용료를 반영한 전력거래의 내쉬협상게임 해법)

  • Gang, Dong-Ju;Kim, Bal-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.7
    • /
    • pp.311-316
    • /
    • 2002
  • It has been a basic model for the present electric power industry that more than two generators compete, and thereby the market clearing price and the generation schedules are determined through the bid process. In order for this paradigm to be applicable to real electric power systems and markets, it is necessary to reflect many physical and economic constraints related to frequency and transmission in the dispatching schedule. The paper presents an approach to deriving a Nash bargaining solution in a competitive electricity market where multiple generators are playing with the system operator who mitigates the transmission congestion to minimize the total transaction cost. In this study, we take the effect of the line flows and the role of system operator into the Game. Finally, a case study has been demonstrated to verify the proposed cooperative game.

The survey on the Approach to the problem of Security-Constrained Price-Based Unit Commitment in the Deregulated Power Market (전력시장에서 안전도와 가격을 고려한 발전기 기동정지계획문제에 대한 조사연구)

  • Jang, Se-Hwan;Kim, Jin-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.359-360
    • /
    • 2006
  • This paper introduces a variable of methodology and models of solving Security-Constrained Price-Based Unit Commitment(SPUC) Problems in the Deregulated Power Market. The objective of SPUC is coordination between GENCOs and the ISO. GENCOs apply Price-Based Unit Commitment(PBUC) without security constraints and submit capacity bids to the ISO for maximizing their revenues. Using generation data and transmission data obtained from TRANSCOs, the ISO applies Security-Constrained Unit Commitment(SCUC), executes congestion management and contingency analysis for minimizing line flow violations and the risk supplying loads. Considering analysis data, the ISO should adjust GENCOS' bid. In this paper, we presents the result of survey and analyze on the approach of the SPUC problem.

  • PDF

A Feasibility Study on zonal pricing system in Electric Power Market (전력시장 운영을 위한 Zone 분류 타당성에 관한 연구)

  • Lee, Dong-Su;Beack, Woong-Ki;Chun, Yeong-Han;Park, Jong-Bae;Kim, Sung-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.763-765
    • /
    • 2005
  • LMP based pricing system has many merits over SMP. One of them is that network congestion can be managed by the market price together with congestion revenue rights. Korean power system has a peculiar property that the transmission line where network congestion occurs is known and does not vary. For such a system, zonal pricing method is considered to be appropriate as it is simpler than nodal pricing. In this paper, we did feasibility study on zone grouping method and tendency of zonal price compared with nodal price.

  • PDF

An Analysis of Congestion Cost for Electric Power Transmission in Consideration of Uncertainty of Future Electric Power System (미래 전력 계통의 불확실성을 고려한 송전혼잡비용 분석)

  • Park, Sung Min;Kim, Sung Soo
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.3
    • /
    • pp.131-137
    • /
    • 2014
  • It is expected that there will be delay of scheduled transmission network reinforcement and huge investment of renewable energy resources in Korea. As transmission capacity expansion delayed, supplying power to Seoul metropolitan area will not be increased as scheduled. In addition, uncertain renewable energy out of Seoul metropolitan area can cause transmission congestion in the future power system. These two combining effects will make the difference in locational marginal prices(LMP) and congestion costs increase. In that sense, this paper will analyze how much the congestion costs for Korea power system are incurred in the future power system. Most of previous approaches to analyze the congestion costs for electric power system are based on the optimal power flow model which cannot deal with hourly variation of power system. However, this study attempted to perform the analysis using market simulation model(M-Core) which has the capability of analyzing the hourly power generation cost and power transmission capacity, and market prices by region. As a result, we can estimate the congestion costs of future power system considering the uncertainty of renewable energy and transmission capacity.

A Study on the Apparatus for Image Transmission and Transmission Control using Cellular Phone Network (셀룰러폰 통신망을 이용한 영상전송 및 전송제어 장치에 관한 연구)

  • 박성욱;황수철;박종욱
    • Journal of Internet Computing and Services
    • /
    • v.3 no.1
    • /
    • pp.1-10
    • /
    • 2002
  • A remote image transmission apparatus combines robot technology and image transmission there is safe problem or place that a person can not go. Recently, control apparatus that use wire and RF between web server and robot for remote control are developed. But, there is problem that must install Internet line and communication distance. Transmission distance problem can solve when using the equipment of RF, but price of RF router is problem that is very high cost. In this paper, we developed remote control system using the cellular phone communication network that can control image transmission and image transmission apparatus to solve these problem. Developed system could solve defects of methods that use existent RF and internet. And could transmit the most suitable image and voice under limited condition include current communication network.

  • PDF

The Transmission of Foreign Disturbances into a Small Country (해외경제교란이 소국경제에 미치는 영향)

  • Son, Il-Tae
    • International Area Studies Review
    • /
    • v.14 no.1
    • /
    • pp.3-29
    • /
    • 2010
  • The purpose of this paper is to examine the transmission of domestic and foreign real and monetary disturbances into a small country with heavy imports of intermediate goods, and to analyze how the wage indexation in a small country affects the transmission of foreign disturbances into a small country. We consider the two countries, a small country and the rest of the world, two goods, and rational expectations world model under flexible exchange rate system with perfect capital mobility. We find out that foreign disturbances are transmitted into a small country through the price channel, the foreign output multiplier channel, and the nominal interest rate channel, and the foreign real balance channel. We have conducted an empirical investigation by using the Korean data for a small country and the U.S. data for a large country to see how real and monetary disturbances originating from the US affects the Korean economy with wage indexation.

Design and Implementation of the Remote Image Transmission System using CDMA Communication Network (CDMA 통신망을 이용한 원격 영상 전송 시스템의 설계 및 구현)

  • 박성욱;황수철;박종욱
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.7 no.3
    • /
    • pp.54-61
    • /
    • 2002
  • A remote image transmission apparatus combines robot technology and image transmission there is safe problem or place that a person can not go. Recently, control apparatus that use wire and RF between web server and robot for remote control are developed. But there is problem that must install internet line and communication distance. Transmission distance problem call solve when using the equipment of RF, but price of RF router is problem that is very high cost. In this paper, we developed remote control system using the CDMA cellular phone communication network that can control image transmission and image transmission apparatus to solve these problem. Developed system could solve defects of methods that use existent RF and internet. And could transmit the most suitable image and voice under limited condition include current communication network.

  • PDF

The Effect of Energy-Saving Investment on Reduction of Greenhouse Gas Emissions (에너지절약투자의 온실가스 배출 감소 효과)

  • Kim, Hyeon;Jeong, Kyeong-Soo
    • Environmental and Resource Economics Review
    • /
    • v.9 no.5
    • /
    • pp.925-945
    • /
    • 2000
  • This paper analyses the impact of energy-saving investment on Greenhouse gas emissions using a model of energy demand in Korea. SUR method was employed to estimate the demand equation. The econometric estimates provide information about the energy price divisia index, sector income, and energy saving-investment elasticities of energy demand. Except for energy price divisia, the elasticities of each variable are statistically significant. Also, the price and substitution elasticities of each energy price are similar to the results reported by the previous studies. The energy-saving investment is statistically significant and elasticities of each sector is inelastic. Using the coefficient of energy-saving investment and carbon transmission coefficient, the amount of reduction of energy demand and the reduction of carbon emissions can be estimated. The simulation is performed with the scenario that the energy-saving investment increase by 10~50%, keeping up with Equipment Investment Plan of 30% increase in energy-saving investment by 2000. The results show that the reduction of energy demand measured as 11.2% based upon 1995's level of the energy demand, in industrial sector. Accordingly, the carbon emissions will be reduced by 11.3% based upon 1995's level of the carbon emissions in industrial sector.

  • PDF