• Title/Summary/Keyword: prevention projects

Search Result 231, Processing Time 0.035 seconds

Analysis of Business Cycle Factors and Occupational Accidents in Construction Industry (건설업 산업재해 발생의 경기적 요인 분석 연구)

  • Myungjoong, Kim;Sunyoung, Park
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.32-39
    • /
    • 2022
  • This study analyzed the relationship between occupational accidents in the construction industry and business cycle factors. Multiple regression analyses were conducted to achieve the research purpose; additionally, time-varying parameter estimations were performed to interpret the results. The results obtained for the construction industry revealed a statistically significant relationship between occupational accidents and wage increase rate, unemployment, construction starts, and other factors. The wage increase rate plays a role in reducing occupational accidents because efforts are made to prevent accidents owing to the increase in income loss due to accidents and the demand for increased safety levels. The number of construction starts affects occupational accidents with a time lag of 1 to 2 or 4 months; therefore, it is likely to be used as a leading indicator for estimating fatal accidents in the construction industry. This study highlighted the importance of monitoring socioeconomic changes that could affect the working conditions of workers and workplaces, and production activities in the workplace for the effective prevention of occupational accidents. This study also reveals the necessity of developing a method to operate prevention projects flexibly and the seasonality of industrial characteristics, particularly those of the construction industry where the highest number of fatal occupational injuries occur.

SCHEMATIC APPROACH TO IMPROVE TIME PERFORMANCE OF HIGHWAY CONSTRUCTION CONTRACTS

  • Ralph D. Ellis ;Jae-Ho Pyeon
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.638-642
    • /
    • 2005
  • This paper presents incentive application strategies and delay prevention strategies as schematic approaches to improve time performance of highway construction contracts. This research recognizes the importance of improving time performance during highway construction. Strategic solutions of the most core issues on time performance incentive contracting are identified. The suggested incentive application strategies develop criteria for applying time classification to projects, for assigning project time classifications to contractors and designers, and for determining appropriate incentive values in A (cost) + B (time cost) and other performance incentive contracts. The suggested delay prevention strategies develop criteria for determining the appropriate subsurface utility engineering (SUE) level and to develop best practices for avoiding utility relocation delays. A schematic approach for each strategy is developed. This paper also introduces current incentive contracting practices in Florida. The researchers obtained the information from experienced persons in the highway construction industry, including key highway contractors, designers, and Department of Transportation (DOT) and Federal Highway Administration (FHWA) personnel. The major focus of this research is to develop strategies and suggest approaches to improve time performance of highway construction contracts. For future study, practical tools to facilitate implementation of the suggested strategies should be developed, so that the criteria, implementation processes, and best practices developed may contribute to the current industry-wide effort to improve time performance.

  • PDF

Analysis of Disaster Reduction Effect of Industrial Disaster Prevention Financial Support Project: Focusing on Small Business Sites (산업재해 예방 재정지원 사업의 재해 감소 효과 분석: 소규모 사업장을 중심으로)

  • Choi, Hun;Park, Manhee
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.4
    • /
    • pp.54-62
    • /
    • 2019
  • With regard to industrial accidents, large corporations and public institutions are continuously reducing disasters through systematic management. However, industrial accidents continue to increase in small-scale workplaces. In order to ensure the safety of workers, the government supports the purchasing of industrial accident prevention equitments through financial support projects for small business. However, despite the financial support, the effectiveness of the project is hardly verified. In this study, we analyze the policy effectiveness of the financial support program for industrial accident prevention in a small-scale workplace using the difference-in-difference method. To achieve research purposes, we used the data on the occurrence of industrial accidents, the status of workplaces by year and the data on the status of workplace benefiting from financial support program for the past 10 years. This study is significant in that it analyzed the net effect of financial support programs for disaster reduction in the small business site.

A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages - (공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 -)

  • 이영민;이상범;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF

The Quantitative Assessment of Occupational Accident Reduction by the Injury Ratio Survey Regulations (건설업 재해율 조사의 정량적 산업재해 감소효과)

  • Ahn, Hong-Seob
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.3 s.75
    • /
    • pp.59-66
    • /
    • 2006
  • Injury Ratio Survey Regulations(IRS) was introduced to the construction industry in the Republic of Korea since 1992 and brought positive effect on occupational accidents reduction. There were tremendous decrease of injury ratios and enforcing of contractors' safety organizations from the beginning of IRS. In spite of these positive results, there were some negative effects such as contractors' shrinking injury reports to keep good injury ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. Thus, this study aims to devote on lessening construction injury and elimination of above negative impacts through the quantitative statistic analysis of the effectiveness on the occupational accidents prevention of IRS. According to this assessment, there were decrease of from 6.37% to 44.34% in the accident ratios compared to those of non-IRS groups and decrease of from 3.32% to 83.51 % in the accident ratios compared to those of general industry including the unreported accidents.

Dredging and Reclamation Technology for Prevention of Water Pollution (수질오염 방지를 위한 준설매립공법에 관한 연구)

  • 신은철;오영인;이학주
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.05a
    • /
    • pp.41-45
    • /
    • 2000
  • Geotube is made of permeable but soil-tight geotextile, hydraulically filled with soil include dredged sand and mud, which has been successfully applied in hydraulic and coastal engineering projects. Ceotube method is getting popular and being used a lot in many countries of the world because of the simplicity of the placement and construction, cost effectiveness and minimum impact on the environment, and enable to store & isolate contaminated materials as obtained by harbor dredging. Laboratory tests and field construction were performed to determine the design methodology and construction procedures. From the results of laboratory and field construction, the retention ratio of solid particle is a minimum 86%. The minimum permeability and the tensile strength of geotextile are $\alpha$ x 10$^{-4}$ cm/sec and 20t/m, respectively Also, based on the environmental test results, it can be concluded that this method does meet the Korean EPA standards.

  • PDF

Assessment of Appropriate Period and Cost(P&C) of Repair and Improvement for Irrigational Structures (논문 - 수리시설물의 적정개보수 주기 및 비용 산정)

  • Lee, Joon-Gu;Kim, Myong-Won;Shin, Tae-Ho
    • KCID journal
    • /
    • v.18 no.2
    • /
    • pp.142-160
    • /
    • 2011
  • This study was performed to apply the preventive management technique that is known for more economic and preventive for disaster than corrective technique to Repair & Improvement(R&I) Project policy of irrigational facilities. The appropriate periods of R&I Project had been driven to 40yrs, 24yrs, 27yrs, and 29yrs for reservoir, Pumping and drainage pumping station, Diversion weir and Irrigation & drainage canal respectively. The cost of R&I Project for 10 years had been estimated as 616.9 billion won per year including the 85 billion won for the project of 'Disaster prevention and Function continuity'. After the period of 'Improvement all at once', about 30yrs, 421.8 billion won was requested for 'Function continuity'.

  • PDF

A Study on the Design for the Assessment System of Safety Job Skill Training in the Enterprise (기업 안전직무교육 평가 시스템 설계에 관한 연구)

  • Woo, Tae-Hee;Yang, Kwang-Mo
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.1
    • /
    • pp.11-19
    • /
    • 2014
  • Prevention of the disasters is the best welfare to workers and it brings the growth and stability of an enterprise, finally uplifts the national competitiveness. Because small-scale businesses do not have safety and health managers, the government provides a wide range of safety and health management supports to small-scale businesses. However despite of this government's effort, the industrial accident rate of small-scale businesses does not decline, which is mainly because the projects are not differentiated according to the risk level of individual business. Therefore, this paper aims to obtain implications concerning a plan to conduct a reliable assessment of education through a safety job assessment, and to build a framework which may improve a technical area through the AHP analysis.

Analysis and Improvement Plan of Government Support Project for Reducing Disaster in Small Construction Site. (소규모 건설현장의 재해저감을 위한 정부지원 사업 분석 및 개선요구사항 도출)

  • Baek, Nak-Ku;Lee, Mi-Hyeon;Lim, Houng-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.116-117
    • /
    • 2018
  • The government and the Korea Occupational safety & Health Agency have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce safety accidents at the construction site. However, the number of disasters at construction sites is increasing every year. So analyze the results of the supervision and inspection of the Ministry of Employment and Labor, the projects related to the small-scale construction work of the Safety and Health Corporation, and the technical guidance project of the disaster prevention technology guidance organization. It is also necessary to establish an improvement plan for the disaster reduction of the small-scale construction work site for this project.

  • PDF

A Plan on the Flood Control Ability Improvement Project to maintain stability of existing dams (기존댐 치수능력 증대사업의 시행 방안)

  • Lee, Wan-Ho;Ahn, Hee-Bok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.191-201
    • /
    • 2006
  • The flood control ability improvement project on existing dams is the project for prevention of disasters from excessive flood due to climate changes and thus protects lives and property damages by increasing safety of dams. The collapse of dam brings unimaginable disasters, so the project needs to be swiftly conducted by Government's funding. This paper introduces tile examples of the flood control ability improvement projects of multi-purpose and water supply dams, which is conducted in the way of structural measures among 26 dams operated by Kwater.

  • PDF